Radar

Where work is coming.

Energy, offshore and industrial projects worldwide: when rounds are scheduled, what is being built and by whom, and where. Every date and every fact links to its source. Free to read, no sign-up.

1. Pick what you follow

What is happening around your project, your competitors and the yards you depend on.

Projects to watch
Companies & agencies
Yards
Areas
Sectors
Disciplines matched by our inference
Clear all

Latest

Awards, delays, new projects, tenders and permits — each with its date and its source. Follow something above to narrow it.

2. Your feed

  1. MilestoneSource checked 18 September 2026

    Holland Hydrogen 1 nears start-up

    Shell's 200 MW electrolyser on the Maasvlakte is close to completion and connected to the Dutch hydrogen network. Production is expected to start late 2026 and ramp up in 2027.

    Source: ENR

    Gasunie

  2. New projectSource checked 18 September 2026

    Aramis: second CO2 transport and storage system for Rotterdam

    TotalEnergies, Shell, EBN and Gasunie develop Aramis as a shared CO2 hub on the Maasvlakte with an offshore pipeline to depleted North Sea gas fields, injecting CO2 3-4 km below the seabed. It complements Porthos.

    Source: TotalEnergies

    Gasunie

  3. DelayApril 2026

    Porthos start-up moves to the second half of 2027

    After a schedule review Porthos no longer expects to start at the end of 2026. The project names no single cause: the parts of this first-of-a-kind system depend on each other and material deliveries take longer. Pipelines are laid and the injection wells are converted.

    Source: Porthos

    Gasunie

3. Your weekly digest

Built from what is in the radar now. A real digest only carries what is new since the last one — and is skipped when there is nothing.

YRproject  Radar  ·  Week of 12 October 2026
This is what your weekly digest would look like
Following: Gasunie
Delays & schedule changes
April 2026
After a schedule review Porthos no longer expects to start at the end of 2026. The project names no single cause: the parts of this first-of-a-kind system depend on each other and material deliveries take longer. Pipelines are laid and the injection wells are converted.
Source: Porthos
You follow Gasunie
New projects
Source checked 18 September 2026
TotalEnergies, Shell, EBN and Gasunie develop Aramis as a shared CO2 hub on the Maasvlakte with an offshore pipeline to depleted North Sea gas fields, injecting CO2 3-4 km below the seabed. It complements Porthos.
Source: TotalEnergies
You follow Gasunie
Milestones
Source checked 18 September 2026
Shell's 200 MW electrolyser on the Maasvlakte is close to completion and connected to the Dutch hydrogen network. Production is expected to start late 2026 and ramp up in 2027.
Source: ENR
You follow Gasunie
This week on the calendar
12 Oct 2026 · window closes
Summaries are our own words; the linked source is what counts. We do not track opens or clicks.
YRproject is open book: the professional keeps the full rate; our fee comes on top, 20% to 500 hours, 15% to 1,500 and 12% above - and both sides see the same invoice. See who gets what
Every digest ends with a manage link and a one-step unsubscribe
YRproject B.V., the Netherlands. KvK 97813974

4. Get it by e-mail

We mail a confirmation link first. No account, no password.

We store your e-mail address and what you follow - nothing else, no open or click tracking. Unsubscribing deletes both. Privacy notice.

How the radar works.

No scraped walls of news. Short, sourced, dated — and admitted only against a fixed rule.

Sourced

Every item links to where it was published: a grid operator, a government agency, a company or the trade press. The summary is our own words; the source is what counts. A date is either the source's publication date, the event date it states, or — when a page carries no date — the day we last checked it, and we say which.

Admitted, not scraped

A collector reads a short list of public feeds a few times a day, respects robots.txt and keeps headlines only. An item is admitted only if it answers where work is coming, for whom and when, passes two independent checks, carries a date and a source we know, and is written in our own words. Market and price news never qualifies. Anything those checks cannot settle waits for a person, and we remove what should not be here.

Inference, labelled

Company, yard, area and sector matches are facts from the source. Discipline matches are not: they come from our mapping of role families to project phases — for example estimating before a tender, commissioning near start-up. It is not a vacancy count.

The same items feed The North Sea, live. Missing a company, yard or area? Tell us and we add it to the list.