Kaminho FPSO (Cameia & Golfinho)

TotalEnergies' seventh Angolan FPSO and the first large deepwater development in the Kwanza basin; TotalEnergies expects over 10 million man-hours of work in Angola.

Deepwater FPSO · Angola (Africa) · every fact below is as reported by the linked sources, checked by hand on 2026-10-08.

Size
70,000 b/d FPSO; ~30 km subsea lines; first oil 2028
Operator / developer
TotalEnergies
Phase, as reported
FPSO conversion and subsea fabrication (execution since FID May 2024)
Checked on
2026-10-08

Phase track steps named in the reported phase are marked

  1. FID
  2. Engineering
  3. Fabrication
  4. Construction
  5. Installation
  6. Commissioning

Who builds it as stated by the sources

  • TotalEnergies — operator 40%; partners Petronas 40%, Sonangol 20%
  • Saipem — three contracts totalling US$3.7 bn (May 2024): EPC, transportation and commissioning of the Kaminho FPSO (VLCC conversion); 12-year FPSO operation and maintenance (+8-year option); EPCI of the SURF package (~30 km of 8" and 10" flowlines and risers), fabrication at Saipem's Ambriz yard, FDS J-lay vessel for offshore campaign

Key dates as stated by the sources

FID
2024-05-21
Saipem awards
2024-05-21
First oil target
2028

Disciplines likely needed our inference

  • FPSO conversion/topsides engineers
  • SURF and riser engineers
  • commissioning and start-up engineers
  • electrical engineers (all-electric FPSO)
  • yard construction supervision

Our inference from project kind and phase — not stated by the sources below.

Sources checked on 2026-10-08

  1. Angola: TotalEnergies launches the Kaminho deepwater projectTotalEnergies (company newsroom) · published 2024-05-21 · retrieved 2026-09-22
  2. TotalEnergies launches Kaminho oil project offshore Angola, Saipem to supply, operate FPSOOffshore Magazine · published 2024-05-21 · retrieved 2026-09-22
  3. Saipem secures $3.7 billion contracts for TotalEnergies' Kaminho project offshore AngolaWorld Oil · published 2024-05-21 · retrieved 2026-09-22
  4. TotalEnergies plans $10 billion Angola investment with partners over five years, CEO says (Reuters)CNBC Africa · published 2026-09-10 · retrieved 2026-10-08

Position on our globe: 9.60°S 12.40°E. Location approximate: Block 20/11, Kwanza Basin, ~100 km off the Angolan coast, 1,700 m water depth.