A complete floating LNG plant — hull, ~40,000 t of topsides and onshore receiving works — being integrated in Korea for delivery and commissioning in Sabah in 2027.
Floating LNG · Malaysia (Asia-Pacific) · every fact below is as reported by the linked sources, checked by hand on 2026-10-08.
- Size
- Minimum 2 mtpa nearshore FLNG (reported ~2.1 mtpa)
- Operator / developer
- PETRONAS
- Phase, as reported
- fabrication (hull launched Feb 2025; topsides module integration at Samsung Heavy's Geoje yard ongoing)
- Checked on
- 2026-10-08
Phase track steps named in the reported phase are marked
- FID
- Engineering
- Fabrication
- Construction
- Installation
- Commissioning
Who builds it as stated by the sources
- JGC Corporation — Lead consortium partner on the EPCC contract: engineering, procurement and commissioning of the FLNG topsides and associated onshore facilities, plus overall project management
- Samsung Heavy Industries — Consortium partner: EPC of the FLNG hull and modular fabrication of the topsides at Geoje (steel cut April 2024, hull launched February 2025)
Key dates as stated by the sources
- FID or award
- EPCC contract awarded to JGC–Samsung Heavy, announced 6 January 2023
- Milestone
- Steel-cutting/construction start at Geoje, April 2024; hull launch reported 26 February 2025
- Startup target
- Completion scheduled 2027 (JGC); start-up targeted second half of 2027 per trade press
Disciplines likely needed our inference
- LNG process and commissioning engineering
- module integration / mechanical completion
- E&I and instrumentation
- marine/mooring engineering
- QA/QC and inspection
- project controls
Our inference from project kind and phase — not stated by the sources below.
Sources checked on 2026-10-08
- JGC Awarded Contract for First Nearshore Floating LNG Plant in MalaysiaJGC Holdings (company newsroom) · published 2023-01-06 · retrieved 2026-09-22
- Petronas awards JGC-Samsung contract for third Malaysian FLNGOil & Gas Journal · published 2023-01-09 · retrieved 2026-09-22
- Petronas Starts Construction of Third Floating LNG FacilityWorld-Energy (trade press) · published 2024-04-02 · retrieved 2026-09-22
- Samsung Heavy launches Petronas' third FLNGLNG Prime (trade press, paywalled) · published 2025-02-26 · retrieved 2026-09-22
- Samsung Heavy launches 'Cedar FLNG'; world-first simultaneous construction of three FLNGs (Korean)Seoul Shinmun · published 2026-06-05 · retrieved 2026-10-08
Position on our globe: 5.08°N 115.55°E. Location approximate: To be moored nearshore at the Sipitang Oil and Gas Industrial Park (SOGIP), Sabah, East Malaysia; hull and topsides under construction at Samsung Heavy Industries' Geoje yard, South Korea.