Northern Lights CO2 transport & storage — Phase 2
The reference project for CCS-as-infrastructure in Europe — offshore pipeline, injection wells and receiving-terminal expansion all running in parallel, a template for the CO2 value chains (incl. Porthos in Rotterdam) that Dutch engineering firms are also chasing.
CCS · Norway (Europe, outside North Sea deep-dive scope — Norwegian Sea/Øygarden coast) · every fact below is as reported by the linked sources, checked by hand on 2026-10-08.
- Size
- Raises transport & storage capacity from 1.5 to more than 5 million tonnes CO2/year
- Operator / developer
- Northern Lights JV — Equinor, Shell and TotalEnergies (each 33.3%)
- Phase, as reported
- engineering / fabrication (detailed engineering in full swing, fabrication underway at several yards per March 2026 reporting)
- Checked on
- 2026-10-08
Phase track steps named in the reported phase are marked
- FID
- Engineering
- Fabrication
- Construction
- Installation
- Commissioning
Who builds it as stated by the sources
- Equinor / Shell / TotalEnergies (Northern Lights JV) — developer, FID holder
- Subsea7 — technical service provider — EPCI of a ~5 km CO2 pipeline plus satellite structures, umbilicals, tie-ins, offshore ops 2026-2027
- Aker Solutions — EPC contracts for Phase 2 (scope not itemised in sources checked)
- SLB OneSubsea — EPC contract for the CO2 subsea injection system
Key dates as stated by the sources
- FID
- March 2025
- Startup target
- From 2028
Disciplines likely needed our inference
- pipeline/subsea engineering
- process engineering (terminal)
- offshore installation supervision
- commissioning
- HSE
Our inference from project kind and phase — not stated by the sources below.
On the Radar news about this project, each linked to its source
Sources checked on 2026-10-08
- Northern Lights Phase 2: Expanding Europe's CO2 Storage CapacityNorthern Lights (project operator) · published 2025-2026 · retrieved 2026-09-19
- Northern Lights: a CO2 transport and storage project to reduce industrial emissions in EuropeTotalEnergies · published 2026 · retrieved 2026-09-19
- Subsea7 starts engineering for Northern Lights Phase 2 CO2 pipelineOffshore Magazine · published 2026 · retrieved 2026-09-19
- Investing NOK 7.5 billion in expansion of the groundbreaking Northern Lights CCS-projectEquinor (company newsroom) · published 2025-03-27 · retrieved 2026-10-08
Position on our globe: 60.61°N 4.87°E. Location approximate: Øygarden receiving/injection terminal near Bergen, Norway.