Project · CCS · Netherlands

Aramis CO2 transport & storage

Dutch government committed EUR 726m after Shell and TotalEnergies scaled back their planned funding; final investment decision by Gasunie/EBN expected in 2026; storage (22 Mt/year capacity) targeted operational by 2030. Designed to complement Porthos, using Porthos's onshore compressor station.

As reported by the source below (2026-09-19).

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: planned)

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Later Operation 2030 (storage targeted operational by 2030, as reported)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • GasunieOperator / ownerdeveloper
  • EBNOperator / ownerdeveloper
Kind
CCS
Country
Netherlands
Operator
Gasunie
Position
51.93°N 4.03°E, approximate

Sources

  1. Aramis CO2 transport & storage - source pageGasunie / gasworld (2026) · read 2026-09-19
  2. Aramis: second CO2 transport and storage system for RotterdamTotalEnergies · published 2026-09-18 · read 2026-10-23