Bonga North deepwater tieback

A ~US$5 bn subsea tieback — 16 wells, new risers, flowlines and umbilicals, FPSO modifications — in execution from 2025 towards first oil around 2030.

Subsea tie-back · Nigeria (Africa) · every fact below is as reported by the linked sources, checked by hand on 2026-10-08.

Size
16 wells; up to 110,000 b/d through the Bonga FPSO
Operator / developer
Shell Nigeria Exploration and Production Company (SNEPCo)
Phase, as reported
execution — engineering, fabrication and installation of subsea infrastructure; FPSO modifications
Checked on
2026-10-08

Phase track steps named in the reported phase are marked

  1. FID
  2. Engineering
  3. Fabrication
  4. Construction
  5. Installation
  6. Commissioning

Who builds it as stated by the sources

  • Shell (SNEPCo) — operator 65% of OML 118; partners Esso E&P Nigeria 20% and Nigerian Agip Exploration 15% (after TotalEnergies' exit, completed November 2025)
  • Saipem — leader of consortium (with KOA Oil & Gas and AVEON Offshore) for EPCI of risers, flowlines, subsea umbilicals and associated subsea structures; ~US$1 bn total, Saipem share ~US$900 m (Dec 2024)
  • TechnipFMC — Subsea 2.0 production systems — design and manufacture of subsea trees, manifolds, jumpers, controls and services; 'substantial' award (US$250–500 m), Dec 2024

Reported risk as reported, as of 2026-10-08

First oil is reported around 2030; project cost cited by trade press at ~US$5 bn.

Key dates as stated by the sources

FID
December 2024
Epci awards
December 2024
First oil target
by end of the decade (2030 per NS Energy)

Disciplines likely needed our inference

  • subsea/SURF engineers
  • pipeline and riser installation engineers
  • FPSO brownfield modification engineers
  • subsea controls/commissioning
  • project controls and QA/QC

Our inference from project kind and phase — not stated by the sources below.

Sources checked on 2026-10-08

  1. Saipem leading Bonga North subsea construction offshore NigeriaOffshore Magazine · published 2024-12-19 · retrieved 2026-09-22
  2. Saipem Scoops $900M for Work with Shell Off NigeriaOE Digital · published 2024-12-19 · retrieved 2026-09-22
  3. Bonga North Deepwater Project, NigeriaNS Energy · published 2025-01-17 · retrieved 2026-09-22
  4. TotalEnergies completes divestment of 12.5% Bonga field stake in Nigeria for $510 millionWorld Oil · published 2025-11-25 · retrieved 2026-10-08
  5. Shell ups equity in Nigeria's Bonga field as TotalEnergies divestsThe Energy Year · published 2025-11-27 · retrieved 2026-10-08

Position on our globe: 4.60°N 4.70°E. Location approximate: OML 118, ~120–130 km offshore Nigeria, water depth >1,000 m; tieback to the existing Bonga FPSO.