Radar

The North Sea, live.

Layers, legend & filters
Layers
Status

Our inference from each project's phase and kind - not a vacancy count and not a statement by the source.

Projects list · Sources & licences

EMODnet Human Activities, CC-BY 4.0 · Natural Earth · MapLibre · all sources

Projects list.

The headline projects from the map as plain text: who builds it, the phase, what is next and where we read it. A field we could not source says “not published”.

Our inference from each project's phase and kind - not a vacancy count and not a statement by the source.

Running now

Under construction or ramping up.

  • What’s next Ecowende (Site VI) started production 6 July 2026, full commissioning targeted end of 2026; OranjeWind (Site VII) began offshore monopile installation September 2026, full commissioning expected early 2028.

    Kind
    Offshore wind farm
    Developer / operator
    Ecowende (Shell + Eneco + Chubu JV, Site VI, 760MW); OranjeWind (RWE + TotalEnergies JV, Site VII, 795MW)
    Contractors
    not published
    Capacity
    1,555 MW

    Position on the map: zone centroid approximate.

    Source: enerdata.net · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Multiple 2GW/525kV platforms planned in NL and Germany through the early 2030s; IJmuiden Ver Beta jacket under construction at Vlissingen (targeting 2028 commissioning), IJmuiden Ver Gamma jacket construction (first steel cut) started (targeting 2029), Nederwiek 1 (2030) and Nederwiek 2 (2031) platforms in earlier stages.

    Kind
    Offshore grid programme
    Developer / operator
    TenneT
    Contractors
    GE Vernova-Seatrium consortium (converter stations); Heerema Fabrication Group Vlissingen (jackets for Beta/Gamma/Nederwiek 2); Heerema Marine Contractors and Allseas (transport & installation, ~28 lots to 2031)
    Capacity
    not published

    Position on the map: zone centroid approximate.

    Source: tennet.eu · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Under construction since compressor-station work began late 2024; offshore work and first infrastructure building targeted March 2026, pipe golden-weld connection targeted June 2026; system expected operational in the second half of 2027.

    Kind
    CO₂ transport & storage
    Developer / operator
    Port of Rotterdam Authority, EBN, Gasunie
    Contractors
    not published
    Capacity
    not published

    Position on the map: approximate area.

    Source: porthosco2.nl · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • Under construction

    Holland Hydrogen 1

    What’s next 200MW electrolyser plant near completion; commissioning expected to start late 2026 with production ramp-up in 2027 (temporary grid connection in use until the new substation is complete).

    Kind
    Hydrogen plant
    Developer / operator
    Shell
    Contractors
    not published
    Capacity
    200 MW

    Position on the map: approximate area.

    Source: enr.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Financial close February 2026; construction groundbreaking 28 May 2026; targeting 100,000 t/year SAF from 2028 - Europe's first standalone greenfield SAF plant.

    Kind
    Sustainable fuels plant
    Developer / operator
    SkyNRG
    Contractors
    Technip Energies (EPC)
    Capacity
    not published

    Position on the map: approximate area.

    Source: skynrg.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Fabricating jackets for IJmuiden Ver Beta, IJmuiden Ver Gamma and Nederwiek 2 under the GE Vernova-Seatrium consortium contract; Beta jacket construction under way (started Sept 2024); Gamma jacket construction started with ceremonial first steel cut, sail-out targeted summer 2028; each jacket ~10,000 tonnes, ~100m x 55m x 46m.

    Kind
    Fabrication
    Developer / operator
    TenneT (client); GE Vernova-Seatrium consortium (contract holder)
    Contractors
    Heerema Fabrication Group
    Capacity
    not published

    Position on the map: yard location.

    Source: renews.biz · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

Coming

Planned, permitted or in tender.

  • What’s next Development permits awarded 2024. Alpha (Noordzeker) commissioning targeted 2029. Beta (Zeevonk II) permit amended August 2025 to a two-phase build - first 1GW phase targeted 2029, second 1GW phase targeted 2032; TenneT's Beta grid platform jacket construction (first steel) began September 2025, sail-out from Vlissingen targeted summer 2027.

    Kind
    Offshore wind farm
    Developer / operator
    Noordzeker (SSE Renewables, ABP, AGP) - Alpha; Zeevonk II (Copenhagen Infrastructure Partners, Vattenfall) - Beta
    Contractors
    not published
    Capacity
    4,000 MW

    Position on the map: zone centroid approximate.

    Source: english.rvo.nl · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Capacity is about 1 GW per site (RVO does not state a combined MW figure for the two sites together). Permit application window for Gamma-A and Gamma-B (Gamma-B added with subsidy in April 2026) now set for 26 November-10 December 2026; RVO expects to announce winners in Q1 2027 - no tender winner yet as of this dataset's retrieval date. Subsidy ceilings were raised in June 2026 to a maximum of EUR 0.117/kWh (Gamma-A) and EUR 0.116/kWh (Gamma-B). See also the RVO Gamma-B permit page: https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma-b

    Kind
    Offshore wind farm
    Developer
    not published
    Operator
    not published
    Contractors
    not published
    Capacity
    not published

    Position on the map: zone centroid approximate.

    Source: english.rvo.nl · retrieved 2026-09-20 · Public information, fact reported with source

    Show on the map

  • What’s next The Nederwiek I-A wind farm tender (1GW, unsubsidised) closed 30 October 2025 with zero bids. No re-tender of Nederwiek I-A has taken place: the subsidised 2 GW round the government prepared for 2026 (EUR 948.3m was allocated from the Climate Fund for 2026 offshore wind tenders generally, per the 16 September 2025 Offshore Wind Energy Action Plan) went instead to IJmuiden Ver Gamma-A and Gamma-B, whose application window is 26 November-10 December 2026. RVO's January 2026 Development Framework lists Nederwiek I-A's site status without a tender date (commissioning still shown as Q4 2030); Nederwiek sites I-B, II and III show 'Q2-Q4 2026' for their tenders. No Nederwiek wind farm developer has been selected yet. TenneT's Nederwiek 1 and 2 grid platforms (separate from the wind farm tender) are targeted for 2030 and 2031 commissioning respectively.

    Kind
    Offshore wind farm
    Developer
    not published
    Operator
    not published
    Contractors
    not published
    Capacity
    not published

    Position on the map: zone centroid approximate.

    Source: english.rvo.nl · retrieved 2026-09-20 · Public information, fact reported with source

    Show on the map

  • What’s next Dutch government committed EUR 726m after Shell and TotalEnergies scaled back their planned funding; final investment decision by Gasunie/EBN expected in 2026; storage (22 Mt/year capacity) targeted operational by 2030. Designed to complement Porthos, using Porthos's onshore compressor station.

    Kind
    CO₂ transport & storage
    Developer / operator
    Gasunie, EBN (Shell and TotalEnergies remain involved until FID, then focus on the CO2 storage side)
    Contractors
    not published
    Capacity
    not published

    Position on the map: approximate area.

    Source: gasunie.nl · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Severely delayed: design phase still running, first steel not yet cut; Naval News (Jul 2026) reports first (Dutch) delivery has slipped from 2028 to about 2033, Belgian vessel to about 2034, with programme cost more than doubled. Belgium is reviewing alternative builders (RFI to France, Germany, Italy, Spain, Turkiye) after Germany cancelled its own Damen-led F126 frigate order in June 2026; Belgian minister Francken says a decision on staying in the joint programme is due October 2026.

    Kind
    Naval shipbuilding
    Developer / operator
    Netherlands Ministry of Defence / Belgian Ministry of Defence
    Contractors
    Damen Naval (hulls to be fabricated at Damen Galati, Romania; outfitting and weapon-system integration planned for Vlissingen) - no steel-cutting confirmed as of this dataset's retrieval date
    Capacity
    not published

    Position on the map: yard location.

    Source: navalnews.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

Operating

Built and in service.

  • What’s next Fully operational since 2024; first Dutch offshore wind farm built without subsidy.

    Kind
    Offshore wind farm
    Developer / operator
    Vattenfall (with BASF, Allianz)
    Contractors
    not published
    Capacity
    1,500 MW

    Position on the map: zone centroid approximate.

    Source: group.vattenfall.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Operational since December 2023; built subsidy-free.

    Kind
    Offshore wind farm
    Developer / operator
    CrossWind (Shell + Eneco joint venture)
    Contractors
    not published
    Capacity
    759 MW

    Position on the map: zone centroid approximate.

    Source: offshorewind.biz · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Operational since 2020.

    Kind
    Offshore wind farm
    Developer / operator
    Ørsted
    Contractors
    not published
    Capacity
    752 MW

    Position on the map: zone centroid approximate.

    Source: orsted.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Fully operational since the beginning of 2021.

    Kind
    Offshore wind farm
    Developer / operator
    Blauwwind consortium (Partners Group, Shell, Eneco, Van Oord, DGE/Mitsubishi)
    Contractors
    not published
    Capacity
    731.5 MW

    Position on the map: zone centroid approximate.

    Source: eneco.nl · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • Operational

    Gemini wind farm

    What’s next Fully operational since 2017; Van Oord sold its 10% stake to the German ALTE LEIPZIGER-HALLESCHE insurance group in 2018.

    Kind
    Offshore wind farm
    Developer / operator
    Northland Power (60%), Siemens Project Ventures (20%), ALTE LEIPZIGER-HALLESCHE insurance group (10%, bought from Van Oord in 2018), HVC (10%)
    Contractors
    not published
    Capacity
    600 MW

    Position on the map: zone centroid approximate.

    Source: offshorewind.biz · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Ramp-up completed: reached its planned output of 4-5 monopiles/week during H1 2026 and delivered 59 monopiles in Q2 2026, close to its ~60/quarter target; annual target ~200 monopiles once at full capacity.

    Kind
    Fabrication
    Developer / operator
    Sif Group
    Contractors
    not published
    Capacity
    not published

    Position on the map: yard location.

    Source: investing.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

  • What’s next Record pro-forma directional backlog of $35.6bn at end-June 2026 (up ~$4.5bn from year-end 2025, driven by FPSO SEAP I/II awards, Longtail FEED and N'Goma extension); 2026 directional revenue guidance raised to ~$7.6bn and EBITDA guidance to ~$1.9bn; engineering managed from the Schiedam site.

    Kind
    Fabrication
    Developer / operator
    SBM Offshore
    Contractors
    not published
    Capacity
    not published

    Position on the map: yard location.

    Source: investing.com · retrieved 2026-09-19 · Public information, fact reported with source

    Show on the map

TenneT offshore grid platforms

Positions are zone centroids, not surveyed platform positions.

PlatformStatusTechnologyCapacityContractorsWhat’s nextSource
Hollandse Kust (noord) Alpha
Project page
OperationalHVAC 700MW standard platform700 MWEquans / Smulders joint venture (EPCI)In service since TenneT took over the platform 1 June 2023; feeds the 759MW Hollandse Kust (Noord) wind farm.ecomagazine.com
2026-09-19
Hollandse Kust (zuid) Alpha
Project page
OperationalHVAC 700MW standard platform700 MWPetrofac (EPCI, contract awarded July 2018)In service as part of the 2x700MW Hollandse Kust (Zuid) connection.offshorewind.biz
2026-09-19
Hollandse Kust (zuid) Beta
Project page
OperationalHVAC 700MW standard platform700 MWPetrofac (EPCI, combined ~USD 200m contract with HKZ Alpha)In service as part of the 2x700MW Hollandse Kust (Zuid) connection.offshorewind.biz
2026-09-19
Hollandse Kust (west) Alpha
Project page
OperationalHVAC 700MW standard platform700 MWEquans / Smulders joint venture (EPCI)Topside installed September 2023, fully commissioned in 2024; artificial reef structures installed on the substructure in 2023 as part of TenneT's ecological monitoring programme.offshorewind.biz
2026-09-19
Hollandse Kust (west) Beta
Project page
OperationalHVAC 700MW standard platform700 MWEquans / Smulders joint venture (EPCI)Received its grid-readiness certificate 28 October 2025, five months ahead of schedule, completing TenneT's seven-platform 700MW AC programme; awaits commissioning once the OranjeWind (Site VII) wind farm is ready, expected early 2028.offshorewind.biz
2026-09-19
IJmuiden Ver Alpha
Project page
Under constructionHVDC 525kV, 2GW programme2,000 MWHitachi Energy / Larsen & Toubro (HVDC converter stations; L&T replaced Petrofac in the consortium, reported 31 Oct 2025)Onshore land station under construction (first Dutch 2GW-standard substation); commissioning targeted for 2029 per TenneT's 2GW programme schedule.splash247.com
2026-09-20
IJmuiden Ver Beta
Project page
Under constructionHVDC 525kV, 2GW programme2,000 MWGE Vernova-Seatrium consortium; jacket fabrication by Heerema Fabrication Group, VlissingenJacket construction under way at Heerema Vlissingen since first steel cut September 2025 (first 1,700-tonne section raised August 2026); jacket sail-out targeted summer 2027, offshore installation 2027, topside installation H2 2028; commissioning targeted 2028.offshorewind.biz
2026-09-19
IJmuiden Ver Gamma
Project page
Under constructionHVDC 525kV, 2GW programme2,000 MWGE Vernova-Seatrium consortium; jacket fabrication by Heerema Fabrication Group, VlissingenJacket construction (ceremonial first steel cut, September 2026) under way at Heerema Vlissingen - the second of the three 2GW jackets built there; sail-out targeted summer 2028; commissioning targeted 2029.renews.biz
2026-09-19
Nederwiek 1
Project page
PlannedHVDC 525kV, 2GW programme2,000 MWHitachi Energy / Larsen & Toubro (HVDC converter stations; L&T replaced Petrofac in the consortium, reported 31 Oct 2025)Cable systems (with Prysmian) and converter stations in early stages; commissioning targeted for 2030 per TenneT's 2GW programme schedule. Note: this grid platform is separate from the Nederwiek wind-farm-zone tender, whose first site (Nederwiek I-A) drew no bids in October 2025.splash247.com
2026-09-20
Nederwiek 2
Project page
PlannedHVDC 525kV, 2GW programme2,000 MWGE Vernova-Seatrium consortium (converter stations); jacket fabrication contracted to Heerema Fabrication Group, Vlissingen (third of the three 2GW jackets there, after Beta and Gamma)Jacket fabrication contracted to Heerema Vlissingen but not yet started as of this dataset's retrieval date; commissioning targeted 2031.tdworld.com
2026-09-19
Doordewind 1
Project page
PlannedHVDC 525kV, 2GW programme2,000 MWHitachi Energy / Larsen & Toubro (HVDC converter stations; L&T replaced Petrofac in the consortium, reported 31 Oct 2025)To be connected at Eemshaven; the associated wind farm site is planned to be tendered around 2027, with grid commissioning reported at around 2032 (exact year varies slightly by source).splash247.com
2026-09-20
Doordewind 2
Project page
PlannedHVDC 525kV, 2GW programme2,000 MWHitachi Energy / Larsen & Toubro (HVDC converter stations; L&T replaced Petrofac in the consortium, reported 31 Oct 2025)To be connected at Eemshaven; the associated wind farm site is planned to be tendered around 2027, with grid commissioning reported at around 2032 (exact year varies slightly by source).splash247.com
2026-09-20

Yards & sites

Positions are approximate, derived from the postal address.

SiteKindWhatWhat’s nextSource
Heerema Fabrication Group - Vlissingen Yard
Project page
Fabrication yard200,000 m² jacket/topside fabrication yard, 720m quayside. Building jackets for TenneT's 2GW programme (IJmuiden Ver Beta, IJmuiden Ver Gamma, Nederwiek 2) under a GE Vernova-Seatrium consortium contract.IJmuiden Ver Gamma jacket construction (first steel cut) under way; Beta jacket taking shape; Nederwiek 2 jacket to follow.heerema.com
2026-09-19
HSM Offshore Energy - Schiedam Yard
Project page
Fabrication yardTopside and jacket fabrication yard on the Nieuwe Maas; builds offshore substation and platform topsides for North Sea wind and gas projects (e.g. Zingst OSS topside for 50Hertz via the HSI joint venture).not publishedoffshore-mag.com
2026-09-19
SBM Offshore - Schiedam
Project page
Engineering siteSBM Offshore engineering site for FPSO design and project management; company reported a record $35.6bn directional backlog at end-June 2026 across its global FPSO fleet.not publishedinvesting.com
2026-09-19
Damen Naval - Vlissingen
Project page
ShipyardNaval shipyard contracted to build four Anti-Submarine Warfare frigates for the Dutch and Belgian navies (hulls planned to be fabricated at Damen Galati, Romania, then outfitted, weapon-system integration and commissioning in Vlissingen).Programme severely delayed and in design phase, no steel cut yet; Naval News (Jul 2026) reports first delivery has slipped from 2028 to about 2033 (Belgium about 2034), cost more than doubled; Belgium reviewing alternative builders, decision due October 2026.navalnews.com
2026-09-19
Sif Group - Maasvlakte 2 monopile factory
Project page
Fabrication yardRobotised monopile foundation production line (up to 11m diameter, 120m long, ~2,500 tonnes each); EUR 328m expansion opened 2025, ramping toward ~200 monopiles/year.Ramp-up completed: reached its planned output of 4-5 monopiles/week during H1 2026 and delivered 59 monopiles in Q2 2026.investing.com
2026-09-19

The same data as JSON: /api/northsea/projects.json.

Sources & licences.

Open government and sector data first. Every hand-curated fact links to the page we read it on.

Bulk layers

Wind farms, oil and gas platforms, pipelines and cables: Contains data from the European Marine Observation and Data Network (EMODnet) Human Activities, emodnet.ec.europa.eu/en/human-activities, licensed under CC-BY 4.0.

Pipeline and cable lines are simplified for display (about 110–165 m) and are not suitable for engineering or navigation. EMODnet aggregates national sources; for the Netherlands that is RVO / Noordzeeloket and Rijkswaterstaat data. Retrieved 2026-09-18.

Hand-curated layers

TenneT grid platforms, yards and sites, and the headline projects were built fact by fact from official project pages, company disclosures and trade press. Each object carries its own source link and retrieval date. Positions of these objects are approximate (zone centroid or postal address) and are marked as such.

No paid database (such as 4C Offshore) and no OpenStreetMap data is used.

Basemap

Land, borders, the 200 m depth line and place names: made with Natural Earth (public domain), clipped and simplified by us. No external tile server: the map loads from this site only.

Software

Rendered with MapLibre GL JS (BSD-3-Clause), self-hosted.

The dashed links between Heerema’s Vlissingen yard and the 2GW platforms are schematic: they show who fabricates which jacket according to the cited sources. They are not cable routes.