← Radar Projects to watch · worldwide

Sixteen projects to watch.

Large projects being built in 2026–2029, with real demand for technical professionals, spread across regions and kinds. A selection — not a ranking. Follow any of them in your Radar.

Marine & installation

Showing 16 of 29 · Marine & installation, worldwide. Show all

How we check

Every project is checked by hand against at least two public sources — company newsrooms, regulators, trade press. No commercial databases.

Each card shows its sources and the date we checked them (every project in this set: on or after 2026-10-08). We re-check every month; a project that finishes or is cancelled leaves the tour.

Companies appear as sourced project facts only. Reported risks are shown as reported. The discipline lists are our own inference and say so. The small dots are other projects from public datasets — context, not checked by us.

  1. 01 / 16Deepwater FPSO

    Kaskida FPU (bp)

    USA, Gulf of Mexico

    bp's first 20k-psi development: a greenfield hub with FPU fabrication, subsea manufacturing and installation scheduled 2025–2029.

    Size80,000 b/d FPU; six wells at 20,000 psi; first oil 2029

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: FPU under construction at Seatrium …

    Who builds it

    • bp operator
    • Seatrium
    • TechnipFMC
    • SBM Offshore
    • more under “More”

    Reported risk bp is reportedly selling minority stakes in Kaskida and Tiber…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    bp's first 20k-psi development: a greenfield hub with FPU fabrication, subsea manufacturing and installation scheduled 2025–2029 — the design is to be repeated on Tiber.

    Phase in full, as reported

    FPU under construction at Seatrium (steel strike 3Q2025; 25-50% complete at end-June 2026, yard delivery scheduled 2027) and subsea manufacturing in progress towards first oil 2029

    Reported risk in full, as reported

    bp is reportedly selling minority stakes in Kaskida and Tiber. It would keep operatorship (Reuters, via Offshore Magazine, June 2026); no sale announced yet.

    Who builds it as stated by the sources

    Operator / developerbp (100% working interest)

    • bpoperator and sole owner; bp's sixth production hub in the Gulf
    • SeatriumEPC and onshore commissioning of the floating production unit — four-column semisubmersible hull with single topside module, integrated with Goliath twin cranes (Dec 2024)
    • TechnipFMCintegrated EPCI for subsea production systems incl. 20,000-psi standardized trees and manifolds, plus umbilicals, risers and flowlines; 'substantial' award (US$250–500 m), Oct 2024
    • SBM Offshorewet tow and installation of the semi-submersible FPU (Apr 2025)
    • SLB OneSubseasubsea boosting (per OE Digital)
    • Exmar Offshore / Audubon EngineeringFPU hull and topsides design engineering (per OE Digital)

    Key dates as stated by the sources

    FID
    July 2024
    Technipfmc award
    2024-10
    Seatrium EPC award
    2024-12
    Sbm installation award
    2025-04
    First oil target
    2029
    Fpu steel strike
    3Q2025
    Fpu yard delivery
    2027 (Seatrium order book)

    Disciplines likely needed our inference

    • HPHT subsea engineers
    • FPU topsides/hull engineers
    • riser and flowline engineers
    • commissioning engineers
    • marine installation and HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Seatrium to perform EPC work for bp's Kaskida FPUOffshore Magazine · 2024-12-26
    2. BP Hires SBM Offshore to Install Kaskida FPU in Gulf of AmericaOE Digital · 2025-04-30
    3. TechnipFMC Scoops Kaskida Subsea WorkJPT (SPE) · 2024-10-09
    4. Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · 2026-07-31
    5. Seatrium Continues Strong Momentum into 3Q2025 (business update)Seatrium Limited (investor newsroom PDF) · 2025-11-13
    6. bp reportedly initiates sale of minority interests in Kaskida, Tiber projectsOffshore Magazine · 2026-06-16

    Position on the globe: 26.90°N 92.90°W. Location approximate: Keathley Canyon Block 292, ~250 miles (400 km) south-west of New Orleans; water depth ~6,000 ft (1,830 m).

    This project on its own page - facts, sources and a summary to share.

  2. 02 / 16Offshore wind

    Coastal Virginia Offshore Wind (CVOW)

    USA

    The largest offshore wind farm under construction in the US.

    Size2.6 GW, 176 turbines, 3 offshore substations

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Dominion Energy operator
    • Siemens Gamesa
    • Ørsted

    Reported risk A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The largest offshore wind farm under construction in the US, and a live example of political/regulatory risk hitting an in-progress project — a case study for how fast schedules and crew mobilisation can move when a stop-work order lands and lifts within weeks.

    Phase in full, as reported

    installation (approx. 81% complete as of 31 July 2026; 31 turbines installed and 32nd underway; first power to the grid March 2026; two of three offshore substations commissioned)

    Reported risk in full, as reported

    A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction; work resumed in January 2026 after a US District Court preliminary injunction, and Interior let the deadline to appeal lapse (April 2026). Project cost rose by an estimated $228 million because of the stoppage; Dominion's budget now stands at $11.65bn (up from $11.4bn) and completion has slipped to end-2027, citing contingency for weather, vessel maintenance, loadout and extended jacking.

    Who builds it as stated by the sources

    Operator / developerDominion Energy

    • Dominion Energydeveloper/owner
    • Siemens Gamesaturbine supplier — 176 x SG 14-222 DD, 14.6 MW turbines
    • Ørstedreported installer of turbine components on monopile foundations (per Windtech International/Siemens Gamesa reporting on the commercial-scale project)

    Key dates as stated by the sources

    Construction start
    November 2023
    Startup target
    Final (176th) turbine expected to be installed by end of 2027 (previously early 2027); third offshore substation to be commissioned by end of 2026
    First power
    23 March 2026

    Disciplines likely needed our inference

    • foundation/T&I engineering
    • cable engineering
    • marine construction supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

  3. 03 / 16Deepwater FPSO

    FPSO Jaguar — Whiptail development, Stabroek Block

    Guyana

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch.

    Size250,000 bopd oil, 540 MMcfd associated gas treatment, 300,000 bpd water injection; ~2 MMbbl storage

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: integration / installation …

    Who builds it

    • ExxonMobil operator
    • SBM Offshore

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch, on the standardised Fast4Ward programme SBM now repeats project after project — steady multi-year demand for FPSO engineering, hook-up/commissioning and offshore installation crews.

    Phase in full, as reported

    integration / installation (FPSO: topsides fabrication nearing completion, all process modules lifted onboard, integration and commissioning progressing — SBM reports >50%-<75% complete at H1 2026; subsea SURF installation underway since July 2026, scheduled through end-2026)

    Who builds it as stated by the sources

    Operator / developerExxonMobil (Esso Exploration and Production Guyana Ltd.), operator of Stabroek Block on behalf of the Guyana/ExxonMobil/Hess/CNOOC co-venture

    • ExxonMobiloperator / field developer
    • SBM OffshoreFPSO design, construction and (lease/operate) contractor for Jaguar, under its Fast4Ward standardised-hull programme

    Key dates as stated by the sources

    FID or award
    Contract awarded/firmed up 2024 (ExxonMobil FID on Whiptail, SBM contract)
    Startup target
    First production targeted end of 2027 (per Offshore/World Oil reporting, 2026)

    Disciplines likely needed our inference

    • topsides/piping engineering
    • E&I supervision
    • hook-up & commissioning
    • marine/offshore installation
    • HSE
    • project controls/planning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore Awarded Contracts for ExxonMobil Guyana's FPSO JaguarSBM Offshore (company newsroom) · 2024
    2. SBM Offshore to build FPSO Jaguar for ExxonMobil's Whiptail oil and gas project offshore GuyanaWorld Oil · 2024-04-18
    3. Offshore installation begins for Whiptail project's subsea systemBrazil Energy Insight (trade press) · 2026-07-29
    4. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    5. Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · 2026-07-31
    6. ExxonMobil lets SIMOPS management platform for WhiptailOil & Gas Journal · 2026-08-04

    Position on the globe: 9.50°N 57.00°W. Location approximate: Whiptail is the 6th Stabroek Block development, ~200 km offshore Guyana; exact FPSO mooring point not published in sources checked — coordinate is a Stabroek Block-area estimate.

    This project on its own page - facts, sources and a summary to share.

  4. 04 / 16Deepwater FPSO

    GranMorgu (Block 58) FPSO development

    Suriname

    Suriname's first large offshore oil development (US$12.2 bn).

    Size220,000 b/d FPSO; ~190 km subsea lines; first oil mid-2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: FPSO construction …

    Who builds it

    • TotalEnergies EP Suriname operator
    • SBM Offshore
    • Technip Energies
    • TechnipFMC
    • more under “More”

    Reported risk No schedule slippage reported…

    8 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Suriname's first large offshore oil development (US$12.2 bn): FPSO construction, ~190 km of subsea lines and an installation campaign running out of Paramaribo through 2027–2028.

    Phase in full, as reported

    FPSO construction (SBM: >50%-<75% complete at H1 2026; Fast4Ward hull launched out of second dry dock, topsides fabrication continuing) and subsea installation campaign started June 2026

    Reported risk in full, as reported

    No schedule slippage reported. Staatsolie's 20% stake (est. US$2.4 bn) is funded through a US$1.6 bn bank loan from 18 lenders (signed 14 May 2025) plus own cash, cash flow and March 2025 bond proceeds; about half of the ~US$12 bn capex had been spent by September 2026.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies EP Suriname

    • TotalEnergiesoperator; partners APA Corporation and Staatsolie (40/40/20 per Ocean Energy Resources, June 2026)
    • SBM Offshoreconstruction and installation of the FPSO in partnership with Technip Energies, plus operations and maintenance after deployment (Nov 2024)
    • Technip EnergiesFPSO EPC partner of SBM Offshore (per SBM Offshore release)
    • TechnipFMCintegrated EPCI (iEPCI) for subsea systems — Subsea 2.0 trees, manifolds, connectors, topside controls, umbilicals, flexible jumpers and flexible risers
    • SaipemEPCI of the SURF package (~US$1.9 bn): ~100 km production flowlines, ~90 km injection lines, T&I of flexible risers, umbilicals and structures; offshore operations started June 2026 from Paramaribo with MCV Normand Navigator

    Key dates as stated by the sources

    FID
    2024-10-01
    Main contract awards
    2024-11-14
    Saipem offshore operations start
    2026-06-24
    First oil target
    mid-2028

    Disciplines likely needed our inference

    • FPSO topsides and hull engineers
    • SURF/pipeline installation engineers
    • subsea controls and commissioning
    • marine base logistics and HSE
    • FPSO operations and maintenance staff

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore awarded contracts for the GranMorgu field developmentSBM Offshore (company newsroom) · 2024-11-14
    2. TotalEnergies awards FPSO, subsea contracts for GranMorgu project offshore SurinameOffshore Magazine · 2024-11-14
    3. Saipem starts operations GranMorgu project in SurinameOcean Energy Resources · 2026-06-24
    4. SBM Offshore's Suriname-bound FPSO for TotalEnergies $12.2B oil project starts taking shapeOffshore Energy · 2025-05-12
    5. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    6. TotalEnergies' offshore project in Suriname on track for first output in mid-2028Pipeline & Gas Journal · 2026-09-20
    7. Staatsolie and the GranMorgu Project backed by broad (inter)national confidenceStaatsolie (company newsroom) · 2025-05-14
    8. Suriname offshore oil and gas momentum builds as GranMorgu advancesWorld Oil · 2026-08-13

    Position on the globe: 7.30°N 55.60°W. Location approximate: Block 58, ~150 km offshore Suriname; FPSO in ~400 m water depth, subsea scope in 100–1,100 m.

    This project on its own page - facts, sources and a summary to share.

  5. 05 / 16Deepwater FPSO

    FPSO Gato do Mato (Shell) — Orca development

    Brazil

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards.

    Size120,000 b/d FPSO; first oil 2029

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: hull construction/integration …

    Who builds it

    • Shell Brasil operator
    • MODEC
    • SOFEC
    • Sumitomo Heavy Industries Marine & Engineering
    • more under “More”

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards; delivery, installation and start-up targeted for 2029, then a 20-year MODEC O&M contract.

    Phase in full, as reported

    hull construction/integration (forward hull left Japan for China July 2026), topsides fabrication

    Who builds it as stated by the sources

    Operator / developerShell Brasil

    • Shell Brasiloperator (50%) and FPSO owner; partners Ecopetrol (30%) and KUFPEC (20%, acquired from Shell in Feb 2026, completion expected by end-2026 subject to approvals); PPSA manages the production sharing contract
    • MODECFPSO purchase and sales agreement (design of hull and all topsides facilities) plus 20-year operations and maintenance contract (March 2025); multi-yard build with Sumitomo Heavy Industries (Yokosuka, forward hull) and COSCO Qidong (aft hull, integration)
    • SOFEC (MODEC group)spread mooring system
    • Sumitomo Heavy Industries Marine & Engineeringforward hull block construction, Yokosuka (steel cut June 2025; block sailed to China July 2026)
    • COSCO Qidong Shipyardaft hull block (steel strike Oct 2025) and hull integration

    Key dates as stated by the sources

    FID
    March 2025
    Modec contracts
    2025-03-25
    Forward hull steel cut
    June 2025
    Aft hull steel strike
    October 2025
    Forward hull sailaway to china
    July 2026
    First oil target
    2029

    Disciplines likely needed our inference

    • FPSO hull and topsides engineers
    • yard construction supervision and QA/QC
    • mooring and marine engineers
    • commissioning and start-up engineers
    • FPSO operations and maintenance staff

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. MODEC Inks Purchase And Sales Agreement and Secures Operations and Maintenance Contract for Shell's Gato do Mato FPSO ProjectMODEC (company newsroom) · 2025-03-25
    2. MODEC: Pieces of Shell's Brazil-bound FPSO puzzle continue to slide into placeOffshore Energy · 2025-10-06
    3. MODEC Advances Construction of Brazil-Bound Gato do Mato FPSOBrazil Energy Insight · 2026-07-02
    4. Shell divests partial interest in Orca project offshore BrazilOffshore Magazine · 2026-02-04
    5. Forward Section of MODEC's Next Generation Hull for FPSO Gato do Mato Departs for Integration at China YardMODEC (company newsroom) · 2026-07-02

    Position on the globe: 24.80°S 43.20°W. Location approximate: Santos Basin pre-salt, ~200 km south of Rio de Janeiro, water depth ~2,000 m.

    This project on its own page - facts, sources and a summary to share.

  6. 06 / 16Grid & HVDC

    NeuConnect — UK-Germany electricity interconnector

    United Kingdom / Germany

    One of the largest point-to-point interconnectors under construction in Europe.

    Size1.4 GW, ~700 km of land and subsea cable

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction — converter-station fit-out …

    Who builds it

    • NeuConnect Britain / NeuConnect Deutschland operator
    • Siemens Energy
    • Prysmian

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    One of the largest point-to-point interconnectors under construction in Europe — HVDC cable and converter-station work running in parallel with the North Sea's own HVDC build-out (e.g. TenneT's programme).

    Phase in full, as reported

    construction — converter-station fit-out (mechanical and electrical systems) under way in the UK and Germany since September 2026; over 350 km of the ~725 km cable route laid

    Who builds it as stated by the sources

    Operator / developerNeuConnect Britain / NeuConnect Deutschland (investors led by Meridiam, Allianz, Kansai Electric Power and TEPCO)

    • NeuConnect (project company)developer/owner
    • Siemens Energysupplied all 14 converter-station transformers, delivered by May 2026
    • Prysmiansubsea/land cable supply and installation (named by NeuConnect as its cabling contractor)

    Key dates as stated by the sources

    Construction start
    July 2023 (onshore)
    Startup target
    2028

    Disciplines likely needed our inference

    • electrical/HVDC engineering
    • cable installation supervision
    • civil works (converter stations)
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NeuConnect's huge 700km cabling programme reaches halfway pointNeuConnect Interconnector (company newsroom) · 2026-07-23
    2. NeuConnect reaches construction milestone with all 14 transformers now delivered to UK and German sitesNeuConnect Interconnector (company newsroom) · 2026-05-11
    3. NeuConnect moves into next stage of construction with Converter Station fit out works now underwayNeuConnect Interconnector (company newsroom) · 2026-09-25
    4. Fit-out of NeuConnect's converter stations in progressOffshore Energy · 2026-09-25

    Position on the globe: 51.45°N 0.71°E. Location approximate: UK converter station, Isle of Grain, Kent; German landing near Fedderwarden/Wilhelmshaven is the other endpoint.

    This project on its own page - facts, sources and a summary to share.

  7. 07 / 16Grid & HVDC

    TenneT 2GW offshore grid programme

    Netherlands / Germany

    The backbone grid build-out behind essentially every North Sea wind farm coming online this decade.

    SizeAt least 14 platforms of 2 GW each by 2032 — at least 8 in the Netherlands and 6 in Germany

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: fabrication / installation …

    Who builds it

    • TenneT operator
    • Heerema Marine Contractors
    • Allseas
    • GE Vernova–Seatrium
    • more under “More”

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The backbone grid build-out behind essentially every North Sea wind farm coming online this decade — a long, steady programme of platform fabrication and offshore installation work spread across multiple Dutch main contractors.

    Phase in full, as reported

    fabrication / installation (second 2GW jacket, IJmuiden Ver Gamma, in construction since September 2026; first jacket, IJmuiden Ver Beta, due offshore summer 2027, topside 2H 2028)

    Who builds it as stated by the sources

    Operator / developerTenneT (Dutch/German transmission system operator)

    • TenneTdeveloper/grid operator, FID holder for the 14-platform programme
    • Heerema Marine Contractorstransport & installation framework agreement, awarded ~60% of lots; building a new float-over barge for 30,000+ tonne substations, deploying SSCV Sleipnir
    • Allseastransport & installation framework agreement, remaining lots
    • GE Vernova–Seatriummain contractor for the IJmuiden Ver Beta, IJmuiden Ver Gamma and Nederwiek 2 converter platforms
    • Heerema Fabrication Groupbuilds the jackets for those three converter platforms in Vlissingen, commissioned by GE Vernova–Seatrium

    Key dates as stated by the sources

    Programme target
    2032 for full 14-platform build-out

    Disciplines likely needed our inference

    • structural/fabrication engineering
    • marine installation supervision
    • E&I
    • commissioning
    • project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. TenneT awards transport and installation slots for 2GW offshore platforms to Allseas and HeeremaTenneT (company newsroom) · 2023-2024
    2. Heerema to Build New Float-Over Barge for TenneT's 2GW Program Offshore PlatformsHeerema Marine Contractors (company newsroom) · 2025-01
    3. Construction starts on TenneT's second 2GW jacketOcean Energy Resources · 2026-09-18
    4. TenneT awards contracts to Allseas and Heerema for 2GW offshore platformsNS Energy · 2023-05-18
    5. Heerema signs framework agreement for transportation and installation of TenneT's 2GW programHeerema Marine Contractors (company newsroom) · 2023-05-17
    6. Jacket for TenneT's IJmuiden Ver Beta Platform Starts Taking ShapeoffshoreWIND.biz · 2026-08-31
    7. Mammoet supporting Heerema with offshore wind topsides floatoverOffshore Magazine · 2025-07-08

    Position on the globe: 52.60°N 3.70°E. Location approximate: Multiple 2GW platforms across the Dutch and German North Sea EEZ; coordinate is an indicative Dutch-sector location, not a specific platform site.

    This project on its own page - facts, sources and a summary to share.

  8. 08 / 16Offshore wind

    Bałtyk 2 & Bałtyk 3 offshore wind

    Poland

    Poland's largest sanctioned offshore wind build (PLN ~27 bn) is mid-installation.

    Size2 x 720 MW; 100 monopile foundations; first power 2027, COD 2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Equinor / Polenergia operator
    • Heerema Marine Contractors
    • Siemens Gamesa
    • Sif / Smulders
    • more under “More”

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Poland's largest sanctioned offshore wind build (PLN ~27 bn) is mid-installation: substation topsides, cables and 100 turbines still go in during 2026–2027.

    Phase in full, as reported

    installation (all 100 foundations and 2 substation jackets in place by August 2026; export cables being installed and brought ashore; substation topsides from winter 2026/27, turbines 2027)

    Who builds it as stated by the sources

    Operator / developerEquinor / Polenergia (joint venture)

    • Equinorco-developer/owner
    • Polenergiaco-developer/owner
    • Heerema Marine Contractorstransport and installation of 100 monopiles, 100 transition pieces and two offshore substation jackets (SSCV Thialf; campaign completed Sept 2026); returns to install substation topsides (Bałtyk 2 winter 2026/27, Bałtyk 3 summer 2027)
    • Siemens Gamesaturbine supplier — 100 x 14.4 MW (per offshoreWIND.biz)
    • Sif / Smuldersmonopiles and transition pieces supply (per offshoreWIND.biz)
    • Iemants (Smulders)design and construction of the offshore substations (per offshoreWIND.biz)

    Key dates as stated by the sources

    FID
    2025-05-19
    Foundation campaign complete
    August 2026 (announced 3 September 2026)
    Turbine installation
    2027
    First power
    2027
    Full commercial operation
    2028

    Disciplines likely needed our inference

    • offshore installation/T&I engineers
    • WTG installation and commissioning technicians
    • cable installation engineers
    • HV substation commissioning
    • marine coordination and HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. All Foundations In Place at Bałtyk 2 & 3offshoreWIND.biz · 2026-09-03
    2. Equinor and Polenergia with contracts for transportation and installation of offshore wind farm foundations for Bałtyk 2 and 3Polenergia (company newsroom) · 2024-07-03
    3. Equinor and Polenergia take Final Investment Decisions (FIDs) for Bałtyk 2 and Bałtyk 3 offshore wind projectsPolenergia (company newsroom) · 2025-05-19
    4. Progress of workBałtyk 2 & 3 project site (Equinor/Polenergia) · 2026-08

    Position on the globe: 54.85°N 17.00°E. Location approximate: Polish EEZ, Baltic Sea; Bałtyk 2 ~37 km and Bałtyk 3 ~22 km offshore near Ustka/Łeba; landfall near Ustka, O&M base in Łeba.

    This project on its own page - facts, sources and a summary to share.

  9. 09 / 16Deepwater FPSO

    Yggdrasil (Aker BP)

    Norway

    A three-platform development now estimated at NOK 195 bn (nominal, Oct 2026): the last topsides go offshore in late 2026.

    Size~700 million boe; 57 wells on three platforms; 250 km power cable from shore

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: offshore installation and hook-up …

    Who builds it

    • Aker BP operator
    • Aker Solutions
    • Subsea 7
    • Allseas
    • more under “More”

    Reported risk Cost growth…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A three-platform development now estimated at NOK 195 bn (nominal, Oct 2026): the last topsides go offshore in late 2026, with hook-up, commissioning and subsea installation running into 2027.

    Phase in full, as reported

    offshore installation and hook-up (Hugin B topside installed early July 2026; Munin topside loaded out at Aibel Haugesund, ready for sail-away Aug 2026; Hugin A topside sail-away scheduled December 2026; power from shore commissioned June 2026)

    Reported risk in full, as reported

    Cost growth: Norway's 2027 state budget (7 Oct 2026) puts Yggdrasil at NOK 195 bn nominal, up 9.8% in a year and from NOK 120.8 bn at PDO; Aker BP raised investment guidance in July 2026 to hold the 2027 start-up.

    Who builds it as stated by the sources

    Operator / developerAker BP

    • Aker BPoperator (Hugin licence 76.72%); partners Equinor and Orlen Upstream Norway
    • Aker SolutionsEPC and offshore hook-up for the Hugin A production platform and jacket and the Hugin B unmanned wellhead platform and jacket (contract ~NOK 22 bn, Dec 2022); plus subsea production systems (~NOK 7 bn)
    • Subsea 7SURF package (per Offshore Technology project profile)
    • Allseastopsides installation (per Offshore Technology project profile)
    • NKTsubsea power cables (per Offshore Technology project profile)
    • AibelEPC of the Munin unmanned production platform topsides (Haugesund)

    Key dates as stated by the sources

    FID
    December 2022
    Pdo approval
    June 2023
    Hugin a first steel cut
    September 2023
    Hugin b topside sailaway
    2026-07-06
    Subsea final deliveries
    2028 (per Aker Solutions 2022 release)
    Startup target
    2027 (Aker BP aims for summer 2027)
    Hugin a topside sailaway
    December 2026 (scheduled)

    Disciplines likely needed our inference

    • offshore hook-up and commissioning engineers
    • subsea/SURF installation engineers
    • E&I and control systems engineers
    • structural/marine operations engineers
    • HSE and completion management

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Aker BP sends Hugin B topside to Yggdrasil in the Norwegian North SeaPortNews · 2026-07-06
    2. Aker Solutions Secures Multiple Contracts with Aker BP – Record High Order IntakeAker Solutions (company newsroom) · 2022-12-16
    3. Yggdrasil Field Development, North Sea, NorwayOffshore Technology
    4. Aker BP increases project cost estimates to protect 2027 startupsOil & Gas Journal · 2026-07-15
    5. Aker BP narrows 2026 production guidance as major Norway projects advanceWorld Oil · 2026-07-15
    6. Mammoet completes critical topsides operations for Aker BP's Yggdrasil projectWorld Oil · 2026-08-13
    7. Costs of Aker BP's flagship offshore projects continue to rise (Reuters)Baird Maritime · 2026-10-07

    Position on the globe: 59.90°N 2.20°E. Location approximate: Central North Sea, Norwegian shelf, ~160 km west of Kollsnes near Bergen; water depth 110–120 m.

    This project on its own page - facts, sources and a summary to share.

  10. 10 / 16CCS

    Northern Lights CO2 transport & storage — Phase 2

    Norway

    The reference project for CCS-as-infrastructure in Europe.

    SizeRaises transport & storage capacity from 1.5 to more than 5 million tonnes CO2/year

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: engineering / fabrication …

    Who builds it

    • Northern Lights JV operator
    • Subsea7
    • Aker Solutions
    • SLB OneSubsea

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The reference project for CCS-as-infrastructure in Europe — offshore pipeline, injection wells and receiving-terminal expansion all running in parallel, a template for the CO2 value chains (incl. Porthos in Rotterdam) that Dutch engineering firms are also chasing.

    Phase in full, as reported

    engineering / fabrication (detailed engineering in full swing, fabrication underway at several yards per March 2026 reporting)

    Who builds it as stated by the sources

    Operator / developerNorthern Lights JV — Equinor, Shell and TotalEnergies (each 33.3%)

    • Equinor / Shell / TotalEnergies (Northern Lights JV)developer, FID holder
    • Subsea7technical service provider — EPCI of a ~5 km CO2 pipeline plus satellite structures, umbilicals, tie-ins, offshore ops 2026-2027
    • Aker SolutionsEPC contracts for Phase 2 (scope not itemised in sources checked)
    • SLB OneSubseaEPC contract for the CO2 subsea injection system

    Key dates as stated by the sources

    FID
    March 2025
    Startup target
    From 2028

    Disciplines likely needed our inference

    • pipeline/subsea engineering
    • process engineering (terminal)
    • offshore installation supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Northern Lights Phase 2: Expanding Europe's CO2 Storage CapacityNorthern Lights (project operator) · 2025-2026
    2. Northern Lights: a CO2 transport and storage project to reduce industrial emissions in EuropeTotalEnergies · 2026
    3. Subsea7 starts engineering for Northern Lights Phase 2 CO2 pipelineOffshore Magazine · 2026
    4. Investing NOK 7.5 billion in expansion of the groundbreaking Northern Lights CCS-projectEquinor (company newsroom) · 2025-03-27

    Position on the globe: 60.61°N 4.87°E. Location approximate: Øygarden receiving/injection terminal near Bergen, Norway.

    This project on its own page - facts, sources and a summary to share.

  11. 11 / 16Subsea tie-back

    Bonga North deepwater tieback

    Nigeria

    A ~US$5 bn subsea tieback.

    Size16 wells; up to 110,000 b/d through the Bonga FPSO

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: execution — engineering, fabrication and installation of subsea infrastructure; FPSO modifications

    Who builds it

    • Shell Nigeria Exploration and Production Company operator
    • Saipem
    • TechnipFMC

    Reported risk First oil is reported around 2030; project cost cited by trade press at ~US$5 bn

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A ~US$5 bn subsea tieback — 16 wells, new risers, flowlines and umbilicals, FPSO modifications — in execution from 2025 towards first oil around 2030.

    Who builds it as stated by the sources

    Operator / developerShell Nigeria Exploration and Production Company (SNEPCo)

    • Shell (SNEPCo)operator 65% of OML 118; partners Esso E&P Nigeria 20% and Nigerian Agip Exploration 15% (after TotalEnergies' exit, completed November 2025)
    • Saipemleader of consortium (with KOA Oil & Gas and AVEON Offshore) for EPCI of risers, flowlines, subsea umbilicals and associated subsea structures; ~US$1 bn total, Saipem share ~US$900 m (Dec 2024)
    • TechnipFMCSubsea 2.0 production systems — design and manufacture of subsea trees, manifolds, jumpers, controls and services; 'substantial' award (US$250–500 m), Dec 2024

    Key dates as stated by the sources

    FID
    December 2024
    Epci awards
    December 2024
    First oil target
    by end of the decade (2030 per NS Energy)

    Disciplines likely needed our inference

    • subsea/SURF engineers
    • pipeline and riser installation engineers
    • FPSO brownfield modification engineers
    • subsea controls/commissioning
    • project controls and QA/QC

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Saipem leading Bonga North subsea construction offshore NigeriaOffshore Magazine · 2024-12-19
    2. Saipem Scoops $900M for Work with Shell Off NigeriaOE Digital · 2024-12-19
    3. Bonga North Deepwater Project, NigeriaNS Energy · 2025-01-17
    4. TotalEnergies completes divestment of 12.5% Bonga field stake in Nigeria for $510 millionWorld Oil · 2025-11-25
    5. Shell ups equity in Nigeria's Bonga field as TotalEnergies divestsThe Energy Year · 2025-11-27

    Position on the globe: 4.60°N 4.70°E. Location approximate: OML 118, ~120–130 km offshore Nigeria, water depth >1,000 m; tieback to the existing Bonga FPSO.

    This project on its own page - facts, sources and a summary to share.

  12. 12 / 16Floating LNG

    ZLNG nearshore FLNG (PETRONAS FLNG 3), Sipitang, Sabah

    Malaysia

    A complete floating LNG plant.

    SizeMinimum 2 mtpa nearshore FLNG (reported ~2.1 mtpa)

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication …

    Who builds it

    • PETRONAS operator
    • JGC Corporation
    • Samsung Heavy Industries

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A complete floating LNG plant — hull, ~40,000 t of topsides and onshore receiving works — being integrated in Korea for delivery and commissioning in Sabah in 2027.

    Phase in full, as reported

    fabrication (hull launched Feb 2025; topsides module integration at Samsung Heavy's Geoje yard ongoing)

    Who builds it as stated by the sources

    Operator / developerPETRONAS

    • JGC CorporationLead consortium partner on the EPCC contract: engineering, procurement and commissioning of the FLNG topsides and associated onshore facilities, plus overall project management
    • Samsung Heavy IndustriesConsortium partner: EPC of the FLNG hull and modular fabrication of the topsides at Geoje (steel cut April 2024, hull launched February 2025)

    Key dates as stated by the sources

    FID or award
    EPCC contract awarded to JGC–Samsung Heavy, announced 6 January 2023
    Milestone
    Steel-cutting/construction start at Geoje, April 2024; hull launch reported 26 February 2025
    Startup target
    Completion scheduled 2027 (JGC); start-up targeted second half of 2027 per trade press

    Disciplines likely needed our inference

    • LNG process and commissioning engineering
    • module integration / mechanical completion
    • E&I and instrumentation
    • marine/mooring engineering
    • QA/QC and inspection
    • project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. JGC Awarded Contract for First Nearshore Floating LNG Plant in MalaysiaJGC Holdings (company newsroom) · 2023-01-06
    2. Petronas awards JGC-Samsung contract for third Malaysian FLNGOil & Gas Journal · 2023-01-09
    3. Petronas Starts Construction of Third Floating LNG FacilityWorld-Energy (trade press) · 2024-04-02
    4. Samsung Heavy launches Petronas' third FLNGLNG Prime (trade press, paywalled) · 2025-02-26
    5. Samsung Heavy launches 'Cedar FLNG'; world-first simultaneous construction of three FLNGs (Korean)Seoul Shinmun · 2026-06-05

    Position on the globe: 5.08°N 115.55°E. Location approximate: To be moored nearshore at the Sipitang Oil and Gas Industrial Park (SOGIP), Sabah, East Malaysia; hull and topsides under construction at Samsung Heavy Industries' Geoje yard, South Korea.

    This project on its own page - facts, sources and a summary to share.

  13. 13 / 16Offshore gas platforms

    Block B & 48/95, 52/97 gas development (Block B – O Mon gas-to-power)

    Vietnam

    A new offshore gas hub.

    SizeGas for ~3,800 MW of power at O Mon; EPCI#1 >US$1 bn

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication / construction …

    Who builds it

    • Phu Quoc Petroleum Operating Company operator
    • McDermott
    • PTSC
    • Vietsovpetro

    Reported risk First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A new offshore gas hub — central production platform, living-quarters platform, flare and bridges — fabricated in Vietnam under a McDermott-led EPCI contract, then installed and hooked up offshore.

    Phase in full, as reported

    fabrication / construction (EPCI#1 at ~29% overall progress with detailed engineering >71% as of August 2025; LQ fabrication underway)

    Reported risk in full, as reported

    First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module. Downstream power plants lag: until end-2028 mainly O Mon I will be able to take Block B gas.

    Who builds it as stated by the sources

    Operator / developerPhu Quoc Petroleum Operating Company (PQPOC) for Petrovietnam (PVN), with MOECO, PVEP, PV Gas and PTTEP as partners

    • McDermottConsortium leader with PTSC for EPCI package #1: EPCI and hook-up/commissioning of the central production platform, living-quarters platform, flare tower and bridges (limited letter of award Oct 2023; full contract value >US$1 billion)
    • PTSC (Petrovietnam Technical Services Corporation)Consortium partner on EPCI#1; PTSC M&C fabricating the living-quarter module (LQM, ~2,643 t) and living-quarter utility deck (LQU, ~3,236 t) — first cut August 2025, LQM load-out scheduled 24 February 2027
    • VietsovpetroFabrication yard (VSP yard) named by PTSC for the living-quarter units

    Key dates as stated by the sources

    FID or award
    EPCI#1 limited letter of award to McDermott–PTSC on 31 October 2023; consortium leading the package since October 2023
    Milestone
    LQM fabrication commenced 1 August 2025; LQM load-out scheduled 24 February 2027
    Startup target
    First gas from Block B no later than Q3 2027 (Government Office Notification 487/TB-VPCP, 15 September 2026); O Mon I commercial operation December 2027, O Mon IV December 2028, O Mon II Q4 2029, O Mon III May 2030 (Can Tho Department of Industry and Trade, October 2026)

    Disciplines likely needed our inference

    • structural/topsides fabrication supervision
    • piping and E&I engineering
    • offshore installation and HUC
    • pipeline engineering
    • commissioning (gas processing, power)
    • project controls/planning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. McDermott, PTSC Consortium Receives Limited Letter of Award for Block B Gas Development Project Offshore VietnamMcDermott (company newsroom) · 2023-10-31
    2. PTSC commences construction of LQM and LQU for the Vietnam Block B Gas ProjectPTSC (company news) · 2025-08
    3. Vietnam's gas-to-power project moves forward with planned investment nearing $12 billionOffshore Energy (trade press) · 2024-06-04
    4. Vietnam aims to fuel 3 power plants with Block B gas: PMThe Investor (Vietnam) · 2024-05-13
    5. Chuỗi dự án khí - điện Lô B - Ô Môn: Tiến độ của một mắt xích không thể tách khỏi toàn ChuỗiNăng lượng Việt Nam (Vietnam Energy Association journal) · 2026-09-22
    6. Chuỗi dự án khí - điện Lô B - Ô Môn và lịch tiến độ tích hợp các dự án thượng nguồn, trung nguồn, hạ nguồnNăng lượng Việt Nam · 2026-09-24
    7. Cần Thơ: Dòng khí Lô B dự kiến về năm 2027, các nhà máy Ô Môn vận hành từ cuối 2028Báo Xây dựng (Ministry of Construction newspaper) · 2026-10-01

    Position on the globe: 7.90°N 103.20°E. Location approximate: Blocks B, 48/95 and 52/97 in the Malay–Tho Chu basin, southwest Vietnam continental shelf, ~77 m water depth, 300+ km offshore Ca Mau; gas piped ~400 km to the O Mon power complex at Can Tho. Exact CPP location not published in sources checked.

    This project on its own page - facts, sources and a summary to share.

  14. 14 / 16Subsea gas

    Jansz-Io Compression (Gorgon gas supply)

    Australia

    A subsea-compression scheme keeping one of the world's largest LNG plants (Gorgon) supplied as its field ages.

    SizeMaintains feed-gas supply to Gorgon LNG's three 15.6 MTPA trains via a 27,000-tonne floating field control station and ~6,500 tonnes of subsea compression infrastructure

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning (named in the reported phase)

    Phase, as reported: installation / commissioning …

    Who builds it

    • Chevron Australia operator
    • Saipem

    Reported risk Schedule has moved…

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A subsea-compression scheme keeping one of the world's largest LNG plants (Gorgon) supplied as its field ages — a rare, technically complex subsea-compression build with its own multi-year commissioning tail.

    Phase in full, as reported

    installation / commissioning (Chevron's December 2024 indicative schedule runs installation from late-2024 to mid-2027; commissioning and start-up to commence from 2026/2027)

    Reported risk in full, as reported

    Schedule has moved: Chevron's December 2024 update extended the installation window from mid-2024–mid-2026 to late-2024–mid-2027, with the compression station installed in two campaigns; no public start-up announcement found as of October 2026.

    Who builds it as stated by the sources

    Operator / developerChevron Australia (Gorgon joint venture)

    • Chevronoperator
    • Saipemcontractor, ~$4bn order for the compression project scope

    Key dates as stated by the sources

    Sanctioned
    2021 (project proceeded)
    Startup target
    Commissioning, start-up and operation expected to commence from 2026/2027 (Chevron operations environment plan, accepted by NOPSEMA 26 March 2026)

    Disciplines likely needed our inference

    • subsea engineering
    • commissioning
    • controls/instrumentation
    • offshore installation supervision
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Chevron's Jansz-Io compression project on trackOffshore Magazine · 2024
    2. Saipem wins contract for Chevron's Jansz-Io compression projectLNG Prime · 2021-2022
    3. Gorgon and Jansz Feed Gas Pipeline and Wells Operations (environment plan summary)NOPSEMA (Australian offshore regulator) · 2024-12
    4. Jansz-Io Compression Installation (information sheet, Dec 2024)Chevron Australia · 2024-12

    Position on the globe: 20.75°S 115.40°E. Location approximate: Jansz-Io gas field / Barrow Island, offshore Western Australia.

    This project on its own page - facts, sources and a summary to share.

  15. 15 / 16Offshore wind

    Fengmiao 1 offshore wind farm

    Taiwan

    Taiwan's first Round-3.1 offshore wind project to reach financial close.

    Size495-500 MW

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Copenhagen Infrastructure Partners operator
    • Van Oord
    • DEME
    • Jan De Nul

    3 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Taiwan's first Round-3.1 offshore wind project to reach financial close, and a clean example of Dutch and Belgian marine contractors splitting scope on the same project (Van Oord on cables, DEME on foundations) — the kind of specialised installation work that draws Dutch offshore crews to Asia-Pacific.

    Phase in full, as reported

    installation (99 pin piles, offshore substation and both export cables complete as of early August 2026; CDWE's installation of the 33 jacket foundations follows; inter-array cables from 2027)

    Who builds it as stated by the sources

    Operator / developerCopenhagen Infrastructure Partners (CIP), developed via Copenhagen Offshore Partners

    • Copenhagen Infrastructure Partners / Copenhagen Offshore Partnersdeveloper
    • Van Oordtransport, installation and burial of 33 inter-array cables (~64 km) using cable-lay vessel Nexus, starting 2027
    • DEME, via its Taiwanese JV CDWEtransport & installation of 33 jacket foundations, pin piles and the offshore substation, from Q1 2026, using vessel Green Jade
    • Jan De Nulinstallation and protection of the two high-voltage export cables (~45 km and ~44 km) with cable-layer Willem de Vlamingh; both pulled into the offshore substation by August 2026

    Key dates as stated by the sources

    Financial close
    March 2025
    Completion target
    Commercial operation scheduled 2027

    Disciplines likely needed our inference

    • marine installation supervision
    • cable engineering
    • geotechnical/foundation engineering
    • HSE
    • commissioning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Van Oord, CIP awards Fengmiao 1 wind construction work offshore TaiwanOffshore Magazine · 2025-01-14
    2. Offshore Substation, Export Cable Works Completed at Taiwan's Fengmiao 1Offshore Wind (offshorewind.biz) · 2026-08-05
    3. Construction milestones at Fengmiao I Offshore Wind FarmOcean Energy Resources · 2026-08-05

    Position on the globe: 24.30°N 120.30°E. Location approximate: ~35 km off Taichung, central Taiwan.

    This project on its own page - facts, sources and a summary to share.

  16. 16 / 16Offshore wind

    Oga–Katagami–Akita offshore wind farm (315 MW, Round 2)

    Japan

    First deployment of 15 MW-class turbines in Japan, installed by a DEME-affiliated jack-up in 2027.

    Size315 MW; 21 x Vestas V236-15.0 MW; commissioning June 2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: construction / pre-installation …

    Who builds it

    • Oga Katagami Akita Offshore Green Energy LLC operator
    • DEME
    • Penta-Ocean Construction
    • Vestas
    • more under “More”

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    First deployment of 15 MW-class turbines in Japan, installed by a DEME-affiliated jack-up in 2027; foundation, turbine installation and marine coordination work runs 2026–2028.

    Phase in full, as reported

    construction / pre-installation (turbine deliveries from 2026; offshore installation second half of 2027; full commissioning June 2028)

    Who builds it as stated by the sources

    Operator / developerOga Katagami Akita Offshore Green Energy LLC — consortium of JERA, J-POWER, Tohoku Electric Power and Itochu

    • DEME (via Japan Offshore Marine JV)Engineering works and vessel charter for offshore installation of the 21 wind turbines using the jack-up vessel Sea Challenger under Japanese flag; offshore works scheduled second half of 2027; DEME share up to ~EUR 50 million
    • Penta-Ocean ConstructionNamed alongside the project company as the contracting party for the turbine-installation package
    • VestasTurbine supplier: 21 x V236-15.0 MW (selected 2024; deliveries from 2026)
    • Kajima Corporationmanufacturing, procurement, transport and installation of the turbine foundations (contract October 2025)
    • JFE Engineeringmanufactures and transports the 21 monopiles and transition pieces at its Kasaoka plant, January 2026 to March 2027; first monopile completed August 2026

    Key dates as stated by the sources

    FID or award
    Development rights awarded end of 2023 (Round 2); DEME/JOM turbine-installation contract announced 29 May 2026
    Milestone
    First domestically made monopile completed August 2026; monopile/TP supply runs to March 2027; offshore turbine installation scheduled second half of 2027
    Startup target
    Full commercial operation June 2028 per trade press (reconfirmed July 2026, when the design received Bureau Veritas Japan certification)

    Disciplines likely needed our inference

    • marine operations / installation engineering
    • WTG installation and commissioning technicians
    • client representatives / marine warranty
    • HV cable and substation engineering
    • HSE
    • package management

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. DEME wins contract for offshore wind project in JapanDEME (company newsroom) · 2026-05-29
    2. DEME to Install 15 MW Vestas Turbines at Japanese Offshore Wind FarmoffshoreWIND.biz · 2026-05-29
    3. JFE Engineering Rolls Out First 'Made in Japan' Monopile for Oga–Katagami–Akita Offshore Wind FarmoffshoreWIND.biz · 2026-08-27
    4. Japan's Oga–Katagami–Akita Offshore Wind Project Receives CertificationoffshoreWIND.biz · 2026-07-22
    5. Japan's first order received for domestic monopile production for large-scale offshore wind power project in general watersJFE Engineering (company newsroom) · 2025-12-26
    6. Kajima Inks Foundation Contract for 315 MW Japanese Offshore Wind FarmoffshoreWIND.biz · 2025-10-23

    Position on the globe: 39.85°N 139.90°E. Location approximate: Off the coast of Oga, Katagami and Akita cities, Akita Prefecture, Sea of Japan side of Honshu. Exact turbine layout not published in sources checked.

    This project on its own page - facts, sources and a summary to share.