Twenty-four projects to watch.

Large projects being built in 2026–2029, with real demand for technical professionals, spread across regions and kinds. A selection — not a ranking. Follow any of them in your Radar.

Construction supervision & QA/QC

Showing 24 of 29 · Construction supervision & QA/QC, worldwide. Show all

How we check

Every project is checked by hand against at least two public sources — company newsrooms, regulators, trade press. No commercial databases.

Each card shows its sources and the date we checked them (every project in this set: on or after 2026-10-08). We re-check every month; a project that finishes or is cancelled leaves the tour.

Companies appear as sourced project facts only. Reported risks are shown as reported. The discipline lists are our own inference and say so. The small dots are other projects from public datasets — context, not checked by us.

  1. 01 / 24LNG

    Rio Grande LNG — Trains 4 and 5

    USA

    One of several US Gulf Coast LNG trains now moving from paper to steel at once.

    SizeTrain 4 and Train 5 add LNG production capacity; combined EPC contract value ~$9.1bn ($4.77bn Train 4 + $4.32bn Train 5)

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: engineering / early construction …

    Who builds it

    • NextDecade Corporation operator
    • Bechtel

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    One of several US Gulf Coast LNG trains now moving from paper to steel at once — Bechtel's fully-wrapped EPC model concentrates years of engineering, procurement and construction-supervision demand into a single contractor's backlog.

    Phase in full, as reported

    engineering / early construction (as of 30 June 2026: Train 4 15.5% complete overall — 69.4% engineering, 25.4% procurement, 1.4% construction; Train 5 9.4% overall — 26.8% engineering, 19.3% procurement; Train 4 soil stabilisation done and foundation pours started for the main cryogenic rack, Train 5 soil stabilisation started early July 2026)

    Who builds it as stated by the sources

    Operator / developerNextDecade Corporation

    • NextDecadedeveloper/owner
    • BechtelEPC contractor under fully-wrapped, lump-sum turnkey contracts for Trains 4 and 5 (and the original Phase 1)

    Key dates as stated by the sources

    Train4 NTP
    9 September 2025
    Train5 NTP
    16 October 2025
    First LNG target
    First gas into the facility expected H2 2026; first LNG from Train 1 H1 2027 (Trains 1-3 already under construction; Trains 4-5 follow)

    Disciplines likely needed our inference

    • process/piping engineering
    • procurement/estimating
    • construction supervision
    • QA/QC
    • planning/project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NextDecade Executes EPC Contract with Bechtel for Train 4 at the Rio Grande LNG FacilityBechtel (company press release) · 2024-08-05
    2. NextDecade Corp - Form 10-Q - FY2026 (Q1)U.S. Securities and Exchange Commission (SEC filing) · 2026-Q1
    3. NextDecade Finalizes EPC Contract Refresh for Train 4 and Executes EPC Contract for Train 5 at the Rio Grande LNG FacilityNextDecade Corporation (investor newsroom) · 2025-10
    4. NextDecade Corp - Form 10-Q for the quarter ended 30 June 2026U.S. Securities and Exchange Commission (SEC filing) · 2026-07-30

    Position on the globe: 25.97°N 97.26°W. Location approximate: Port of Brownsville, Texas.

    This project on its own page - facts, sources and a summary to share.

  2. 02 / 24Naval shipbuilding

    PES Frigate — Colombian Navy strategic surface platform programme

    Colombia

    A Dutch-designed warship being built under licence in Latin America.

    Size107.5 m frigate, 14.02 m beam; largest defence vessel Colombia has built, modular construction with 52 naval steel blocks

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication (first steel-cutting 5 February 2026)

    Who builds it

    • Colombian Navy operator
    • COTECMAR
    • Damen Naval

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A Dutch-designed warship being built under licence in Latin America — a rare naval/shipbuilding entry showing Damen's engineering and technology-transfer model exported far outside Europe, distinct from its troubled domestic ASW-frigate and cancelled German F126 programmes.

    Who builds it as stated by the sources

    Operator / developerColombian Navy (Armada Nacional de Colombia)

    • COTECMARshipyard, local construction
    • Damen NavalSIGMA-based ship design, engineering, technical support and materials, under a contract signed with COTECMAR

    Key dates as stated by the sources

    Steel cutting
    5 February 2026
    Engine delivery
    Late 2026
    Sea trials target
    2029

    Disciplines likely needed our inference

    • naval architecture/structural engineering
    • systems integration
    • project management
    • QA/QC
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. COTECMAR and Damen to build frigate for Colombian NavyDamen (company newsroom) · 2024-08-12
    2. COTECMAR Shipyard Starts Construction of First PES Frigate for Colombian NavyNaval News · 2026-02-05
    3. Colombian Navy awards contract to COTECMAR for first PES frigate, ocean patrol vessel, and logistic support shipJanes · 2022-11-30
    4. El presidente de Colombia visita Cotecmar y conoce sus capacidades de construcción navalInfodefensa · 2026-09-22

    Position on the globe: 10.40°N 75.55°W. Location approximate: COTECMAR shipyard, Cartagena, Colombia.

    This project on its own page - facts, sources and a summary to share.

  3. 03 / 24Offshore wind

    Coastal Virginia Offshore Wind (CVOW)

    USA

    The largest offshore wind farm under construction in the US.

    Size2.6 GW, 176 turbines, 3 offshore substations

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Dominion Energy operator
    • Siemens Gamesa
    • Ørsted

    Reported risk A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The largest offshore wind farm under construction in the US, and a live example of political/regulatory risk hitting an in-progress project — a case study for how fast schedules and crew mobilisation can move when a stop-work order lands and lifts within weeks.

    Phase in full, as reported

    installation (approx. 81% complete as of 31 July 2026; 31 turbines installed and 32nd underway; first power to the grid March 2026; two of three offshore substations commissioned)

    Reported risk in full, as reported

    A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction; work resumed in January 2026 after a US District Court preliminary injunction, and Interior let the deadline to appeal lapse (April 2026). Project cost rose by an estimated $228 million because of the stoppage; Dominion's budget now stands at $11.65bn (up from $11.4bn) and completion has slipped to end-2027, citing contingency for weather, vessel maintenance, loadout and extended jacking.

    Who builds it as stated by the sources

    Operator / developerDominion Energy

    • Dominion Energydeveloper/owner
    • Siemens Gamesaturbine supplier — 176 x SG 14-222 DD, 14.6 MW turbines
    • Ørstedreported installer of turbine components on monopile foundations (per Windtech International/Siemens Gamesa reporting on the commercial-scale project)

    Key dates as stated by the sources

    Construction start
    November 2023
    Startup target
    Final (176th) turbine expected to be installed by end of 2027 (previously early 2027); third offshore substation to be commissioned by end of 2026
    First power
    23 March 2026

    Disciplines likely needed our inference

    • foundation/T&I engineering
    • cable engineering
    • marine construction supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

  4. 04 / 24Deepwater FPSO

    FPSO Jaguar — Whiptail development, Stabroek Block

    Guyana

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch.

    Size250,000 bopd oil, 540 MMcfd associated gas treatment, 300,000 bpd water injection; ~2 MMbbl storage

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: integration / installation …

    Who builds it

    • ExxonMobil operator
    • SBM Offshore

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch, on the standardised Fast4Ward programme SBM now repeats project after project — steady multi-year demand for FPSO engineering, hook-up/commissioning and offshore installation crews.

    Phase in full, as reported

    integration / installation (FPSO: topsides fabrication nearing completion, all process modules lifted onboard, integration and commissioning progressing — SBM reports >50%-<75% complete at H1 2026; subsea SURF installation underway since July 2026, scheduled through end-2026)

    Who builds it as stated by the sources

    Operator / developerExxonMobil (Esso Exploration and Production Guyana Ltd.), operator of Stabroek Block on behalf of the Guyana/ExxonMobil/Hess/CNOOC co-venture

    • ExxonMobiloperator / field developer
    • SBM OffshoreFPSO design, construction and (lease/operate) contractor for Jaguar, under its Fast4Ward standardised-hull programme

    Key dates as stated by the sources

    FID or award
    Contract awarded/firmed up 2024 (ExxonMobil FID on Whiptail, SBM contract)
    Startup target
    First production targeted end of 2027 (per Offshore/World Oil reporting, 2026)

    Disciplines likely needed our inference

    • topsides/piping engineering
    • E&I supervision
    • hook-up & commissioning
    • marine/offshore installation
    • HSE
    • project controls/planning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore Awarded Contracts for ExxonMobil Guyana's FPSO JaguarSBM Offshore (company newsroom) · 2024
    2. SBM Offshore to build FPSO Jaguar for ExxonMobil's Whiptail oil and gas project offshore GuyanaWorld Oil · 2024-04-18
    3. Offshore installation begins for Whiptail project's subsea systemBrazil Energy Insight (trade press) · 2026-07-29
    4. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    5. Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · 2026-07-31
    6. ExxonMobil lets SIMOPS management platform for WhiptailOil & Gas Journal · 2026-08-04

    Position on the globe: 9.50°N 57.00°W. Location approximate: Whiptail is the 6th Stabroek Block development, ~200 km offshore Guyana; exact FPSO mooring point not published in sources checked — coordinate is a Stabroek Block-area estimate.

    This project on its own page - facts, sources and a summary to share.

  5. 05 / 24Deepwater FPSO

    FPSO Gato do Mato (Shell) — Orca development

    Brazil

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards.

    Size120,000 b/d FPSO; first oil 2029

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: hull construction/integration …

    Who builds it

    • Shell Brasil operator
    • MODEC
    • SOFEC
    • Sumitomo Heavy Industries Marine & Engineering
    • more under “More”

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards; delivery, installation and start-up targeted for 2029, then a 20-year MODEC O&M contract.

    Phase in full, as reported

    hull construction/integration (forward hull left Japan for China July 2026), topsides fabrication

    Who builds it as stated by the sources

    Operator / developerShell Brasil

    • Shell Brasiloperator (50%) and FPSO owner; partners Ecopetrol (30%) and KUFPEC (20%, acquired from Shell in Feb 2026, completion expected by end-2026 subject to approvals); PPSA manages the production sharing contract
    • MODECFPSO purchase and sales agreement (design of hull and all topsides facilities) plus 20-year operations and maintenance contract (March 2025); multi-yard build with Sumitomo Heavy Industries (Yokosuka, forward hull) and COSCO Qidong (aft hull, integration)
    • SOFEC (MODEC group)spread mooring system
    • Sumitomo Heavy Industries Marine & Engineeringforward hull block construction, Yokosuka (steel cut June 2025; block sailed to China July 2026)
    • COSCO Qidong Shipyardaft hull block (steel strike Oct 2025) and hull integration

    Key dates as stated by the sources

    FID
    March 2025
    Modec contracts
    2025-03-25
    Forward hull steel cut
    June 2025
    Aft hull steel strike
    October 2025
    Forward hull sailaway to china
    July 2026
    First oil target
    2029

    Disciplines likely needed our inference

    • FPSO hull and topsides engineers
    • yard construction supervision and QA/QC
    • mooring and marine engineers
    • commissioning and start-up engineers
    • FPSO operations and maintenance staff

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. MODEC Inks Purchase And Sales Agreement and Secures Operations and Maintenance Contract for Shell's Gato do Mato FPSO ProjectMODEC (company newsroom) · 2025-03-25
    2. MODEC: Pieces of Shell's Brazil-bound FPSO puzzle continue to slide into placeOffshore Energy · 2025-10-06
    3. MODEC Advances Construction of Brazil-Bound Gato do Mato FPSOBrazil Energy Insight · 2026-07-02
    4. Shell divests partial interest in Orca project offshore BrazilOffshore Magazine · 2026-02-04
    5. Forward Section of MODEC's Next Generation Hull for FPSO Gato do Mato Departs for Integration at China YardMODEC (company newsroom) · 2026-07-02

    Position on the globe: 24.80°S 43.20°W. Location approximate: Santos Basin pre-salt, ~200 km south of Rio de Janeiro, water depth ~2,000 m.

    This project on its own page - facts, sources and a summary to share.

  6. 06 / 24Nuclear

    Hinkley Point C nuclear power station

    United Kingdom

    The UK's first new nuclear build in a generation.

    Size2 x EPR reactors, ~3.2 GW total

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • EDF operator
    • China General Nuclear

    Reported risk Delayed a year to 2030…

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The UK's first new nuclear build in a generation — years more of heavy electromechanical, instrumentation and commissioning work ahead, and a well-documented case study in how schedule risk and productivity shortfalls play out on a first-of-a-kind reactor build.

    Phase in full, as reported

    construction (electromechanical installation phase, per EDF's 2026 schedule update)

    Reported risk in full, as reported

    Delayed a year to 2030; total project cost risen to about £35bn (nearly double the original 2016 estimate, ~£48.7bn in today's terms), with EDF citing lower-than-expected productivity in its electromechanical installation programme; a further delay to 2031 could add ~£1bn more.

    Who builds it as stated by the sources

    Operator / developerEDF (with China General Nuclear as minority partner)

    • EDFdeveloper, majority owner, main contractor
    • China General Nuclear (CGN)minority investment partner

    Key dates as stated by the sources

    Unit1 target
    2030 (revised, one year later than previous target)

    Disciplines likely needed our inference

    • E&I supervision
    • mechanical/piping construction
    • QA/QC
    • construction management
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. EDF announces Hinkley Point C delay and rise in project costWorld Nuclear News · 2026
    2. Hinkley Point C's cost climbs to £35bn with confirmation Unit 1 will power up in 2030New Civil Engineer · 2026-02-20
    3. EDF highlights Hinkley Point C's positive impactsWorld Nuclear News · 2026-05-28
    4. EDF: 2026 half-year resultsEDF (via GlobeNewswire) · 2026-07-31
    5. Hinkley Point C (project page, news items incl. 1 Oct 2026 fish-return tunnel)EDF Energy · 2026-10-01

    Position on the globe: 51.20°N 3.13°W. Location approximate: Somerset, England.

    This project on its own page - facts, sources and a summary to share.

  7. 07 / 24Nuclear

    Sizewell C nuclear power station

    United Kingdom

    The UK's second EPR project, now financially closed and in early construction.

    Size2 x EPR reactors, ~3.2 GW total; projected to supply up to 7% of UK electricity demand

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • Sizewell C Ltd operator
    • EDF
    • UK Government / La Caisse / Centrica / Amber Infrastructure

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The UK's second EPR project, now financially closed and in early construction — a long, front-loaded civils and infrastructure phase now, with the bulk of mechanical/E&I/commissioning demand still ahead for 2027-2035.

    Phase in full, as reported

    construction (early civil works — site infrastructure, road/rail bridges, piling — as of the 2026 construction updates)

    Who builds it as stated by the sources

    Operator / developerSizewell C Ltd — EDF (12.5%), UK Government (44.9%), La Caisse (20%), Centrica (15%), Amber Infrastructure (7.6%)

    • EDFminority owner, reactor technology/design (EPR), delivery partner
    • UK Government / La Caisse / Centrica / Amber Infrastructureco-investors following financial close

    Key dates as stated by the sources

    Construction start
    15 January 2024
    FID financial close
    22 July 2025
    Construction duration
    Projected 9-12 years

    Disciplines likely needed our inference

    • civil/structural engineering
    • construction management
    • planning/project controls
    • E&I (later phase)
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. UK's Sizewell C achieves financing landmarkWorld Nuclear News · 2025-07
    2. Sizewell C nuclear power stationEDF Energy (company project page) · 2026
    3. Sizewell C Construction Update March 2026Aldeburgh Town Council (local authority update, citing Sizewell C Ltd) · 2026-04
    4. In pictures: Freight trains deliver construction materials to Sizewell C for first timeNew Civil Engineer · 2026-09-14

    Position on the globe: 52.21°N 1.62°E. Location approximate: Suffolk, England.

    This project on its own page - facts, sources and a summary to share.

  8. 08 / 24Grid & HVDC

    NeuConnect — UK-Germany electricity interconnector

    United Kingdom / Germany

    One of the largest point-to-point interconnectors under construction in Europe.

    Size1.4 GW, ~700 km of land and subsea cable

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction — converter-station fit-out …

    Who builds it

    • NeuConnect Britain / NeuConnect Deutschland operator
    • Siemens Energy
    • Prysmian

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    One of the largest point-to-point interconnectors under construction in Europe — HVDC cable and converter-station work running in parallel with the North Sea's own HVDC build-out (e.g. TenneT's programme).

    Phase in full, as reported

    construction — converter-station fit-out (mechanical and electrical systems) under way in the UK and Germany since September 2026; over 350 km of the ~725 km cable route laid

    Who builds it as stated by the sources

    Operator / developerNeuConnect Britain / NeuConnect Deutschland (investors led by Meridiam, Allianz, Kansai Electric Power and TEPCO)

    • NeuConnect (project company)developer/owner
    • Siemens Energysupplied all 14 converter-station transformers, delivered by May 2026
    • Prysmiansubsea/land cable supply and installation (named by NeuConnect as its cabling contractor)

    Key dates as stated by the sources

    Construction start
    July 2023 (onshore)
    Startup target
    2028

    Disciplines likely needed our inference

    • electrical/HVDC engineering
    • cable installation supervision
    • civil works (converter stations)
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NeuConnect's huge 700km cabling programme reaches halfway pointNeuConnect Interconnector (company newsroom) · 2026-07-23
    2. NeuConnect reaches construction milestone with all 14 transformers now delivered to UK and German sitesNeuConnect Interconnector (company newsroom) · 2026-05-11
    3. NeuConnect moves into next stage of construction with Converter Station fit out works now underwayNeuConnect Interconnector (company newsroom) · 2026-09-25
    4. Fit-out of NeuConnect's converter stations in progressOffshore Energy · 2026-09-25

    Position on the globe: 51.45°N 0.71°E. Location approximate: UK converter station, Isle of Grain, Kent; German landing near Fedderwarden/Wilhelmshaven is the other endpoint.

    This project on its own page - facts, sources and a summary to share.

  9. 09 / 24Grid & HVDC

    TenneT 2GW offshore grid programme

    Netherlands / Germany

    The backbone grid build-out behind essentially every North Sea wind farm coming online this decade.

    SizeAt least 14 platforms of 2 GW each by 2032 — at least 8 in the Netherlands and 6 in Germany

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: fabrication / installation …

    Who builds it

    • TenneT operator
    • Heerema Marine Contractors
    • Allseas
    • GE Vernova–Seatrium
    • more under “More”

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The backbone grid build-out behind essentially every North Sea wind farm coming online this decade — a long, steady programme of platform fabrication and offshore installation work spread across multiple Dutch main contractors.

    Phase in full, as reported

    fabrication / installation (second 2GW jacket, IJmuiden Ver Gamma, in construction since September 2026; first jacket, IJmuiden Ver Beta, due offshore summer 2027, topside 2H 2028)

    Who builds it as stated by the sources

    Operator / developerTenneT (Dutch/German transmission system operator)

    • TenneTdeveloper/grid operator, FID holder for the 14-platform programme
    • Heerema Marine Contractorstransport & installation framework agreement, awarded ~60% of lots; building a new float-over barge for 30,000+ tonne substations, deploying SSCV Sleipnir
    • Allseastransport & installation framework agreement, remaining lots
    • GE Vernova–Seatriummain contractor for the IJmuiden Ver Beta, IJmuiden Ver Gamma and Nederwiek 2 converter platforms
    • Heerema Fabrication Groupbuilds the jackets for those three converter platforms in Vlissingen, commissioned by GE Vernova–Seatrium

    Key dates as stated by the sources

    Programme target
    2032 for full 14-platform build-out

    Disciplines likely needed our inference

    • structural/fabrication engineering
    • marine installation supervision
    • E&I
    • commissioning
    • project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. TenneT awards transport and installation slots for 2GW offshore platforms to Allseas and HeeremaTenneT (company newsroom) · 2023-2024
    2. Heerema to Build New Float-Over Barge for TenneT's 2GW Program Offshore PlatformsHeerema Marine Contractors (company newsroom) · 2025-01
    3. Construction starts on TenneT's second 2GW jacketOcean Energy Resources · 2026-09-18
    4. TenneT awards contracts to Allseas and Heerema for 2GW offshore platformsNS Energy · 2023-05-18
    5. Heerema signs framework agreement for transportation and installation of TenneT's 2GW programHeerema Marine Contractors (company newsroom) · 2023-05-17
    6. Jacket for TenneT's IJmuiden Ver Beta Platform Starts Taking ShapeoffshoreWIND.biz · 2026-08-31
    7. Mammoet supporting Heerema with offshore wind topsides floatoverOffshore Magazine · 2025-07-08

    Position on the globe: 52.60°N 3.70°E. Location approximate: Multiple 2GW platforms across the Dutch and German North Sea EEZ; coordinate is an indicative Dutch-sector location, not a specific platform site.

    This project on its own page - facts, sources and a summary to share.

  10. 10 / 24Refinery & fuels

    SkyNRG DSL-01 sustainable aviation fuel plant, Delfzijl

    Netherlands

    Europe's first standalone greenfield SAF plant, built under a Technip Energies EPCC contract in the EUR 500 million to 1 billion class.

    Size100,000 tonnes of SAF per year plus 35,000 tonnes of sustainable by-products; on-site hydrogen plant (SMR)

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • SkyNRG operator
    • Technip Energies
    • Topsoe
    • KLM Royal Dutch Airlines

    3 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Europe's first standalone greenfield SAF plant, built under a Technip Energies EPCC contract in the EUR 500 million to 1 billion class — two years of process, piping, E&I and commissioning work on one Dutch site.

    Phase in full, as reported

    construction (financial close and start of construction announced 2026-02-13)

    Who builds it as stated by the sources

    Operator / developerSkyNRG

    • Technip EnergiesEPCC contractor (engineering, procurement, construction and commissioning) after completing the FEED; contract classed by Technip Energies as 'substantial' (EUR 500 million to 1 billion)
    • TopsoeHydroFlex hydroprocessing technology licensor (HEFA pathway), as reported
    • KLM Royal Dutch Airlinesprimary off-taker and equity shareholder, as reported

    Key dates as stated by the sources

    Contract award
    2026-02-12 (Technip Energies EPCC)
    Financial close construction start
    2026-02-13
    Startup target
    mid-2028, as reported by trade press

    Disciplines likely needed our inference

    • process engineering
    • piping engineering
    • E&I
    • construction supervision
    • commissioning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies awarded a substantial contract for SkyNRG's Sustainable Aviation Fuel project in the NetherlandsTechnip Energies (company newsroom) · 2026-02-12
    2. SkyNRG starts construction on its first SAF plant in Delfzijl, the NetherlandsHydrocarbon Processing · 2026-02-13
    3. SkyNRG announces Financial Close and starts construction on its first Sustainable Aviation Fuel plant DSL-01 in DelfzijlGroningen Seaports (port authority newsroom) · 2026-02

    Position on the globe: 53.31°N 6.95°E. Location approximate: Chemical park at Delfzijl, Groningen province; coordinate is the park, not the plot.

    This project on its own page - facts, sources and a summary to share.

  11. 11 / 24Deepwater FPSO

    Yggdrasil (Aker BP)

    Norway

    A three-platform development now estimated at NOK 195 bn (nominal, Oct 2026): the last topsides go offshore in late 2026.

    Size~700 million boe; 57 wells on three platforms; 250 km power cable from shore

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: offshore installation and hook-up …

    Who builds it

    • Aker BP operator
    • Aker Solutions
    • Subsea 7
    • Allseas
    • more under “More”

    Reported risk Cost growth…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A three-platform development now estimated at NOK 195 bn (nominal, Oct 2026): the last topsides go offshore in late 2026, with hook-up, commissioning and subsea installation running into 2027.

    Phase in full, as reported

    offshore installation and hook-up (Hugin B topside installed early July 2026; Munin topside loaded out at Aibel Haugesund, ready for sail-away Aug 2026; Hugin A topside sail-away scheduled December 2026; power from shore commissioned June 2026)

    Reported risk in full, as reported

    Cost growth: Norway's 2027 state budget (7 Oct 2026) puts Yggdrasil at NOK 195 bn nominal, up 9.8% in a year and from NOK 120.8 bn at PDO; Aker BP raised investment guidance in July 2026 to hold the 2027 start-up.

    Who builds it as stated by the sources

    Operator / developerAker BP

    • Aker BPoperator (Hugin licence 76.72%); partners Equinor and Orlen Upstream Norway
    • Aker SolutionsEPC and offshore hook-up for the Hugin A production platform and jacket and the Hugin B unmanned wellhead platform and jacket (contract ~NOK 22 bn, Dec 2022); plus subsea production systems (~NOK 7 bn)
    • Subsea 7SURF package (per Offshore Technology project profile)
    • Allseastopsides installation (per Offshore Technology project profile)
    • NKTsubsea power cables (per Offshore Technology project profile)
    • AibelEPC of the Munin unmanned production platform topsides (Haugesund)

    Key dates as stated by the sources

    FID
    December 2022
    Pdo approval
    June 2023
    Hugin a first steel cut
    September 2023
    Hugin b topside sailaway
    2026-07-06
    Subsea final deliveries
    2028 (per Aker Solutions 2022 release)
    Startup target
    2027 (Aker BP aims for summer 2027)
    Hugin a topside sailaway
    December 2026 (scheduled)

    Disciplines likely needed our inference

    • offshore hook-up and commissioning engineers
    • subsea/SURF installation engineers
    • E&I and control systems engineers
    • structural/marine operations engineers
    • HSE and completion management

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Aker BP sends Hugin B topside to Yggdrasil in the Norwegian North SeaPortNews · 2026-07-06
    2. Aker Solutions Secures Multiple Contracts with Aker BP – Record High Order IntakeAker Solutions (company newsroom) · 2022-12-16
    3. Yggdrasil Field Development, North Sea, NorwayOffshore Technology
    4. Aker BP increases project cost estimates to protect 2027 startupsOil & Gas Journal · 2026-07-15
    5. Aker BP narrows 2026 production guidance as major Norway projects advanceWorld Oil · 2026-07-15
    6. Mammoet completes critical topsides operations for Aker BP's Yggdrasil projectWorld Oil · 2026-08-13
    7. Costs of Aker BP's flagship offshore projects continue to rise (Reuters)Baird Maritime · 2026-10-07

    Position on the globe: 59.90°N 2.20°E. Location approximate: Central North Sea, Norwegian shelf, ~160 km west of Kollsnes near Bergen; water depth 110–120 m.

    This project on its own page - facts, sources and a summary to share.

  12. 12 / 24CCS

    Northern Lights CO2 transport & storage — Phase 2

    Norway

    The reference project for CCS-as-infrastructure in Europe.

    SizeRaises transport & storage capacity from 1.5 to more than 5 million tonnes CO2/year

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: engineering / fabrication …

    Who builds it

    • Northern Lights JV operator
    • Subsea7
    • Aker Solutions
    • SLB OneSubsea

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The reference project for CCS-as-infrastructure in Europe — offshore pipeline, injection wells and receiving-terminal expansion all running in parallel, a template for the CO2 value chains (incl. Porthos in Rotterdam) that Dutch engineering firms are also chasing.

    Phase in full, as reported

    engineering / fabrication (detailed engineering in full swing, fabrication underway at several yards per March 2026 reporting)

    Who builds it as stated by the sources

    Operator / developerNorthern Lights JV — Equinor, Shell and TotalEnergies (each 33.3%)

    • Equinor / Shell / TotalEnergies (Northern Lights JV)developer, FID holder
    • Subsea7technical service provider — EPCI of a ~5 km CO2 pipeline plus satellite structures, umbilicals, tie-ins, offshore ops 2026-2027
    • Aker SolutionsEPC contracts for Phase 2 (scope not itemised in sources checked)
    • SLB OneSubseaEPC contract for the CO2 subsea injection system

    Key dates as stated by the sources

    FID
    March 2025
    Startup target
    From 2028

    Disciplines likely needed our inference

    • pipeline/subsea engineering
    • process engineering (terminal)
    • offshore installation supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Northern Lights Phase 2: Expanding Europe's CO2 Storage CapacityNorthern Lights (project operator) · 2025-2026
    2. Northern Lights: a CO2 transport and storage project to reduce industrial emissions in EuropeTotalEnergies · 2026
    3. Subsea7 starts engineering for Northern Lights Phase 2 CO2 pipelineOffshore Magazine · 2026
    4. Investing NOK 7.5 billion in expansion of the groundbreaking Northern Lights CCS-projectEquinor (company newsroom) · 2025-03-27

    Position on the globe: 60.61°N 4.87°E. Location approximate: Øygarden receiving/injection terminal near Bergen, Norway.

    This project on its own page - facts, sources and a summary to share.

  13. 13 / 24Subsea tie-back

    Bonga North deepwater tieback

    Nigeria

    A ~US$5 bn subsea tieback.

    Size16 wells; up to 110,000 b/d through the Bonga FPSO

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: execution — engineering, fabrication and installation of subsea infrastructure; FPSO modifications

    Who builds it

    • Shell Nigeria Exploration and Production Company operator
    • Saipem
    • TechnipFMC

    Reported risk First oil is reported around 2030; project cost cited by trade press at ~US$5 bn

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A ~US$5 bn subsea tieback — 16 wells, new risers, flowlines and umbilicals, FPSO modifications — in execution from 2025 towards first oil around 2030.

    Who builds it as stated by the sources

    Operator / developerShell Nigeria Exploration and Production Company (SNEPCo)

    • Shell (SNEPCo)operator 65% of OML 118; partners Esso E&P Nigeria 20% and Nigerian Agip Exploration 15% (after TotalEnergies' exit, completed November 2025)
    • Saipemleader of consortium (with KOA Oil & Gas and AVEON Offshore) for EPCI of risers, flowlines, subsea umbilicals and associated subsea structures; ~US$1 bn total, Saipem share ~US$900 m (Dec 2024)
    • TechnipFMCSubsea 2.0 production systems — design and manufacture of subsea trees, manifolds, jumpers, controls and services; 'substantial' award (US$250–500 m), Dec 2024

    Key dates as stated by the sources

    FID
    December 2024
    Epci awards
    December 2024
    First oil target
    by end of the decade (2030 per NS Energy)

    Disciplines likely needed our inference

    • subsea/SURF engineers
    • pipeline and riser installation engineers
    • FPSO brownfield modification engineers
    • subsea controls/commissioning
    • project controls and QA/QC

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Saipem leading Bonga North subsea construction offshore NigeriaOffshore Magazine · 2024-12-19
    2. Saipem Scoops $900M for Work with Shell Off NigeriaOE Digital · 2024-12-19
    3. Bonga North Deepwater Project, NigeriaNS Energy · 2025-01-17
    4. TotalEnergies completes divestment of 12.5% Bonga field stake in Nigeria for $510 millionWorld Oil · 2025-11-25
    5. Shell ups equity in Nigeria's Bonga field as TotalEnergies divestsThe Energy Year · 2025-11-27

    Position on the globe: 4.60°N 4.70°E. Location approximate: OML 118, ~120–130 km offshore Nigeria, water depth >1,000 m; tieback to the existing Bonga FPSO.

    This project on its own page - facts, sources and a summary to share.

  14. 14 / 24Deepwater FPSO

    Kaminho FPSO (Cameia & Golfinho)

    Angola

    TotalEnergies' seventh Angolan FPSO and the first large deepwater development in the Kwanza basin.

    Size70,000 b/d FPSO; ~30 km subsea lines; first oil 2028

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: FPSO conversion and subsea fabrication …

    Who builds it

    • TotalEnergies operator
    • Saipem

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    TotalEnergies' seventh Angolan FPSO and the first large deepwater development in the Kwanza basin; TotalEnergies expects over 10 million man-hours of work in Angola.

    Phase in full, as reported

    FPSO conversion and subsea fabrication (execution since FID May 2024)

    Who builds it as stated by the sources

    Operator / developerTotalEnergies

    • TotalEnergiesoperator 40%; partners Petronas 40%, Sonangol 20%
    • Saipemthree contracts totalling US$3.7 bn (May 2024): EPC, transportation and commissioning of the Kaminho FPSO (VLCC conversion); 12-year FPSO operation and maintenance (+8-year option); EPCI of the SURF package (~30 km of 8" and 10" flowlines and risers), fabrication at Saipem's Ambriz yard, FDS J-lay vessel for offshore campaign

    Key dates as stated by the sources

    FID
    2024-05-21
    Saipem awards
    2024-05-21
    First oil target
    2028

    Disciplines likely needed our inference

    • FPSO conversion/topsides engineers
    • SURF and riser engineers
    • commissioning and start-up engineers
    • electrical engineers (all-electric FPSO)
    • yard construction supervision

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Angola: TotalEnergies launches the Kaminho deepwater projectTotalEnergies (company newsroom) · 2024-05-21
    2. TotalEnergies launches Kaminho oil project offshore Angola, Saipem to supply, operate FPSOOffshore Magazine · 2024-05-21
    3. Saipem secures $3.7 billion contracts for TotalEnergies' Kaminho project offshore AngolaWorld Oil · 2024-05-21
    4. TotalEnergies plans $10 billion Angola investment with partners over five years, CEO says (Reuters)CNBC Africa · 2026-09-10

    Position on the globe: 9.60°S 12.40°E. Location approximate: Block 20/11, Kwanza Basin, ~100 km off the Angolan coast, 1,700 m water depth.

    This project on its own page - facts, sources and a summary to share.

  15. 15 / 24Green hydrogen

    NEOM Green Hydrogen Complex

    Saudi Arabia

    The world's largest green-hydrogen/ammonia project moving from construction into commissioning right now.

    SizeUp to 600 tonnes/day of hydrogen, converted to green ammonia for export; ~4 GW of integrated solar/wind power

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation
    6. Commissioning (named in the reported phase)

    Phase, as reported: commissioning …

    Who builds it

    • NEOM Green Hydrogen Company operator
    • Air Products
    • Yara International

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The world's largest green-hydrogen/ammonia project moving from construction into commissioning right now — a preview of the scale and discipline mix (electrolysis, ammonia synthesis, huge renewables integration) the hydrogen economy will need repeated at smaller scale elsewhere, including in the Netherlands.

    Phase in full, as reported

    commissioning (construction completed, commissioning underway as of August 2026)

    Who builds it as stated by the sources

    Operator / developerNEOM Green Hydrogen Company (NGHC) — joint venture of NEOM, ACWA Power and Air Products

    • NEOM Green Hydrogen Company (NEOM/ACWA Power/Air Products JV)developer/owner
    • Air Productsmain EPC contractor and system integrator (finalised $6.7bn EPC agreement, May 2023); holds 30-year ammonia offtake
    • Yara Internationalmarketing and distribution partner for the NEOM green ammonia not used by Air Products; agreement finalised mid-2026

    Key dates as stated by the sources

    EPC award
    May 2023
    Startup target
    Commercial operations targeted 2027

    Disciplines likely needed our inference

    • process/electrolysis engineering
    • commissioning
    • E&I
    • construction management
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NEOM Green Hydrogen ComplexAir Products (company project page) · 2026
    2. NEOM green hydrogen complex finishes $8.4 billion construction, targets 2027 ammonia exportsFertilizer Daily · 2026-08-25
    3. Saudi Neom green hydrogen project nears completionAGBI · 2026-02
    4. NEOM ammonia marketing and distribution agreement finalisedAmmonia Energy Association · 2026-08-10

    Position on the globe: 27.80°N 35.20°E. Location approximate: Oxagon, NEOM megaproject region, northwest Saudi Arabia.

    This project on its own page - facts, sources and a summary to share.

  16. 16 / 24LNG

    North Field East and North Field South LNG expansion

    Qatar

    The single largest LNG capacity build-out under way anywhere.

    SizeNorth Field East + South together raise Qatar's LNG capacity from 77 to 126 MTPA by ~2027-2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning (named in the reported phase)

    Phase, as reported: construction / commissioning …

    Who builds it

    • QatarEnergy operator
    • Technip Energies
    • Chiyoda Corporation
    • CCC

    Reported risk War-related work stop in early 2026…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The single largest LNG capacity build-out under way anywhere, with Technip Energies — a company legally headquartered in the Netherlands — as lead EPC contractor on both expansion phases; years of engineering, commissioning and construction-supervision demand still ahead as later trains follow NFE Train 1.

    Phase in full, as reported

    construction / commissioning (first NFE train ready to start operation in November 2026; remaining NFE trains and NFS under construction after a war-related work suspension in early 2026)

    Reported risk in full, as reported

    War-related work stop in early 2026. Iranian strikes on Ras Laffan and Mesaieed halted NFE/NFS work and damaged two existing LNG trains (about 17% of Qatar's capacity, repairs up to three years); disrupted shipping through the Strait of Hormuz makes the timing of later NFE trains uncertain.

    Who builds it as stated by the sources

    Operator / developerQatarEnergy

    • QatarEnergyoperator/developer
    • Technip EnergiesEPCC contractor (with Chiyoda) for North Field East onshore facilities — 4 mega-trains of 8 MTPA each; also working NFS with CCC
    • Chiyoda CorporationEPCC joint-venture partner with Technip Energies on North Field East
    • CCC (Consolidated Contractors Company)partner with Technip on North Field South

    Key dates as stated by the sources

    NFE full startup
    Uncertain — timing of later NFE trains depends on shipping through the Strait of Hormuz
    NFS startup target
    H2 2028
    NFE startup
    First NFE train ready to start operation November 2026; first LNG expected Q1 2027 (QatarEnergy CEO: first half of 2027)

    Disciplines likely needed our inference

    • piping/mechanical engineering
    • construction supervision
    • commissioning
    • planning/project controls
    • QA/QC

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies and Chiyoda Awarded a Major LNG Contract for the North Field East Project in QatarTechnipFMC / Technip Energies (company press release) · 2020s (original award)
    2. QatarEnergy North Field East (NFE)Technip Energies (company case study) · 2026
    3. QatarEnergy's North Field West LNG Project Startup Slips to 2031Natural Gas Intelligence · 2026
    4. QatarEnergy's LNG expansion project poised to start operations in November, sources say (Reuters)BOE Report · 2026-10-07
    5. QatarEnergy suspends work on North field expansion due to US-Iran conflictOffshore Magazine · 2026-03-02
    6. QatarEnergy Warns Shipping Snags Threaten LNG RoadmapTradingpedia · 2026-09-21

    Position on the globe: 25.90°N 51.55°E. Location approximate: Ras Laffan Industrial City, Qatar.

    This project on its own page - facts, sources and a summary to share.

  17. 17 / 24LNG

    Ruwais LNG — two-train all-electric export plant

    United Arab Emirates

    A greenfield 9.6 mtpa LNG plant in full construction under a Technip Energies-led EPC JV.

    Size9.6 mtpa, two trains, all-electric; US$5.5 bn EPC; COD H2 2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • ADNOC operator
    • Technip Energies
    • JGC Corporation
    • NMDC Energy

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A greenfield 9.6 mtpa LNG plant in full construction under a Technip Energies-led EPC JV, with electric-drive liquefaction new to the region; peak construction and commissioning run to 2028.

    Phase in full, as reported

    construction (ADNOC Gas reported in January 2026 that construction works are progressing ahead of approved schedules)

    Who builds it as stated by the sources

    Operator / developerADNOC (ADNOC Gas to acquire a 60% stake at completion)

    • Technip EnergiesLeader of the TJN RUWAIS joint venture holding the US$5.5 billion EPC contract for the two liquefaction trains
    • JGC CorporationEPC joint-venture partner
    • NMDC Energy (formerly NPCC)EPC joint-venture partner (construction)

    Key dates as stated by the sources

    FID or award
    FID and US$5.5 billion EPC award to Technip Energies/JGC/NMDC Energy JV announced 13 June 2024 (early EPC/limited notice to proceed from March 2024)
    Startup target
    Commercial operations planned for the second half of 2028; ADNOC Gas sees potential to bring this forward

    Disciplines likely needed our inference

    • LNG process/commissioning engineering
    • electrical (HV drives, substations)
    • piping and mechanical construction supervision
    • instrumentation and control systems
    • QA/QC
    • project controls/planning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies, JGC and NMDC Energy awarded a major contract for ADNOC's Ruwais LNG project in the UAETechnip Energies (company newsroom) · 2024-06-13
    2. NMDC Energy (formerly NPCC), Technip Energies, and JGC awarded a major contract worth US$5.5 billion for ADNOC's Ruwais LNG project in the UAENMDC Group (company newsroom) · 2024-06-13
    3. ADNOC advances Ruwais LNG project with early EPC activitiesOil & Gas Journal · 2024-03-13
    4. ADNOC Gas sees potential to advance Ruwais LNG commercial startReuters via Zawya · 2026-01-26
    5. ADNOC Gas Delivers Resilient Q2 Net Income, Takes FID on Major Growth ProjectsADNOC Gas (company newsroom) · 2026-08-10
    6. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28

    Position on the globe: 24.12°N 52.73°E. Location approximate: Al Ruwais Industrial City, Al Dhafrah region, Abu Dhabi.

    This project on its own page - facts, sources and a summary to share.

  18. 18 / 24Oil & gas, onshore

    Gas Growth Integrated Project (GGIP), Ratawi

    Iraq

    Three plants built at once in southern Iraq.

    Size5 million b/d treated seawater; oil to 210,000 b/d; 300 MMcf/d gas; 1 GW solar

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • TotalEnergies operator
    • Hyundai E&C
    • ENKA
    • China Petroleum Pipeline Engineering

    Reported risk Ratawi phase 1 has slipped repeatedly…

    9 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Three plants built at once in southern Iraq: a US$3 bn seawater treatment plant (Hyundai E&C EPC), an oilfield redevelopment to 210,000 b/d and a 300 MMcf/d gas plant. TotalEnergies reports ~7,000 workers at peak.

    Phase in full, as reported

    construction (all four GGIP components in execution since September 2025; CSSP and Ratawi full-field construction launched 14 September 2025; GMP and solar under construction since early 2025)

    Reported risk in full, as reported

    Ratawi phase 1 has slipped repeatedly: TotalEnergies cited Middle East conflict and Strait of Hormuz disruption to equipment shipments, and MEED reports Iraqi customs clearance of critical equipment as the main delay as of September 2026. Security and logistics conditions in southern Iraq remain a risk.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies (45%, operator) with Basra Oil Company (30%) and QatarEnergy (25%)

    • Hyundai E&CEPC contractor (engineering, procurement, supply, construction and commissioning) for the Common Seawater Supply Project treatment plant, contract signed 14 September 2025; reported value ~KRW 4 trillion / US$2.9–3.16 billion, ~4-year build
    • ENKAReported contractor for Ratawi's second central processing facility, contract value above US$1 billion; civil and piping works under way (MEED, May 2026; not confirmed in a contractor press release we opened)
    • China Petroleum Pipeline Engineering (CPP/CPECC)Reported contractor for the US$2.5 billion CSSP pipeline package (MEED, Sept 2026); earlier reported for the Gas Midstream Project (Zawya). Not confirmed in a contractor press release we opened

    Key dates as stated by the sources

    FID or award
    CSSP EPC contract to Hyundai E&C and Ratawi full-field development launched 14 September 2025 (TotalEnergies press release 15 September 2025)
    Milestone
    Ratawi phase 1 (120,000 b/d) first oil now targeted Q4 2026 (TotalEnergies, Sept 2026), after slipping from early 2026 and then the first half of 2026; MEED reported in September 2026 that start-up was mid-to-late October at the earliest
    Startup target
    Ratawi phase 2 to 210,000 b/d from 2028 (reconfirmed by TotalEnergies Sept 2026); CSSP start-up scheduled late 2028 or early 2029 per MEED (Sept 2026), ~49-month build per Hyundai E&C

    Disciplines likely needed our inference

    • water treatment / process engineering
    • pipeline and pumping station engineering
    • construction management
    • commissioning and start-up
    • E&I
    • HSE and security-aware project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Iraq: TotalEnergies Launches the Construction of the Final Two Major Projects of the GGIPTotalEnergies (company newsroom) · 2025-09-15
    2. Hyundai E&C wins W4tr deal for Iraq seawater treatment plantThe Korea Herald · 2025-09-15
    3. Iraq awards Hyundai E&C contract for Common Seawater Supply Project under GGIPZawya Projects · 2025-09
    4. Iraq's $10bln GGIP advances with Hyundai, ENKA, CPECC contractsZawya Projects · 2025-09
    5. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28
    6. TotalEnergies 2Q2026 Earnings Call transcriptTotalEnergies (investor relations) · 2026-07-23
    7. Customs clearance delaying project to develop Iraqi oil fieldMEED · 2026-09-07
    8. Groundworks underway for major Iraqi water projectMEED · 2026-09-10
    9. Piping work ongoing for Iraq field development projectMEED · 2026-05-15

    Position on the globe: 30.18°N 47.90°E. Location approximate: Seawater treatment plant on the coast near Umm Qasr / Khor Al-Zubair port, Basra governorate; Ratawi (Artawi) oil field and gas midstream plant inland near Basra. Coordinate marks the Khor Al-Zubair area.

    This project on its own page - facts, sources and a summary to share.

  19. 19 / 24LNG

    Mozambique LNG (Golfinho/Atum, Area 1)

    Mozambique

    A $20bn+ LNG project restarting at scale after a five-year security-driven suspension.

    Size13 million tonnes/year (design)

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • TotalEnergies operator
    • McDermott / Saipem / Chiyoda

    Reported risk Construction is operating in "containment mode" due to ongoing insurgency-related security concerns in Cabo Delgado…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A $20bn+ LNG project restarting at scale after a five-year security-driven suspension — a live test of how fast a paused megaproject can remobilise thousands of workers, and a rare African entry among 2026-2029 LNG builds. TotalEnergies said in September 2026 it could speed up a Phase 2 by keeping construction teams at Afungi.

    Phase in full, as reported

    construction (almost 45% complete as of July 2026; about 10,000 people on site by late September 2026)

    Reported risk in full, as reported

    Construction is operating in "containment mode" due to ongoing insurgency-related security concerns in Cabo Delgado; incremental costs from the suspension are reported at roughly $4.5 billion, pushing total investment above the original $20 billion. Equipment built in Middle East yards was held up by the 2026 regional conflict; TotalEnergies said in July 2026 that this had been resolved.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies (operator of the Mozambique LNG consortium)

    • TotalEnergiesoperator, restarted project January 2026
    • McDermott / Saipem / Chiyoda (EPC JV)onshore LNG plant EPC consortium (contract predates the 2021 force-majeure suspension; consortium composition per trade press, not re-confirmed by a primary 2026 source in this check)

    Key dates as stated by the sources

    Force majeure lifted
    7 November 2025
    Full restart announced
    29 January 2026
    First LNG target
    2029

    Disciplines likely needed our inference

    • construction management
    • piping/mechanical
    • HSE (security-sensitive site)
    • planning/project controls
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Mozambique LNG announces the full restart of all its activities onshore and offshore in MozambiqueTotalEnergies (company press release) · 2026-01-29
    2. TotalEnergies reboots $20 billion LNG project after years-long hiatusOffshore Energy · 2026-01
    3. TotalEnergies restarts $20bn LNG project in Mozambique after 5-year freezeAl Jazeera · 2026-01-29
    4. TotalEnergies 2Q2026 Earnings Call transcriptTotalEnergies (investor relations) · 2026-07-23
    5. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28
    6. TotalEnergies says Mozambique LNG Phase 2 could be acceleratedClub of Mozambique · 2026-09-30
    7. Mozambique LNG project 45% complete, first train on track for 2029, says TotalEnergiesClub of Mozambique · 2026-08-03

    Position on the globe: 10.90°S 40.50°E. Location approximate: Afungi Peninsula, Cabo Delgado province.

    This project on its own page - facts, sources and a summary to share.

  20. 20 / 24Refinery & petrochemicals

    BPCL Bina refinery and petrochemicals expansion (BPREP)

    India

    A US$5+ bn refinery-plus-cracker complex in mid-construction.

    Size550 KTPA polypropylene + 50 KTPA Butene-1 (Technip Energies scope) within an 11 MMTPA refinery and 1.2 MMTPA cracker programme

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • Bharat Petroleum Corporation Limited operator
    • Technip Energies

    Reported risk Technip Energies holds one package within the wider BPREP programme…

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A US$5+ bn refinery-plus-cracker complex in mid-construction, with Technip Energies executing the polypropylene and Butene-1 units on an EPCC basis for a 2028 finish.

    Phase in full, as reported

    construction (about 31% of physical construction complete in the April–June 2026 quarter, with a quarter of project cost awarded for execution, per BPCL officials; downstream unit EPCC awards placed late 2025)

    Reported risk in full, as reported

    Technip Energies holds one package within the wider BPREP programme; Larsen & Toubro holds the EPCC for the LLDPE/HDPE swing unit (two 575 KTPA trains, December 2025). BPCL names the Middle East conflict as a challenge but says the project remains on schedule.

    Who builds it as stated by the sources

    Operator / developerBharat Petroleum Corporation Limited (BPCL)

    • Technip EnergiesEPCC contractor for the new 550 KTPA polypropylene and 50 KTPA Butene-1 units at Bina (awarded Q4 2025, announced 7 January 2026; together with a Mumbai PRFCC EPsCm contract classed as a 'large' award, EUR 250–500 million)

    Key dates as stated by the sources

    FID or award
    Technip Energies EPCC award recorded Q4 2025, announced 7 January 2026
    Startup target
    BPREP completion targeted May 2028, reaffirmed by BPCL in August/September 2026 despite the Middle East conflict

    Disciplines likely needed our inference

    • process and polymer-unit engineering
    • piping/mechanical construction supervision
    • E&I and control systems
    • commissioning and start-up
    • QA/QC and inspection
    • project controls/planning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies awarded two large contracts by BPCL for new units at Bina and Mumbai refineries in IndiaTechnip Energies (company newsroom) · 2026-01-07
    2. Technip Energies awarded two large contracts by BPCLHydrocarbon Engineering · 2026-01-07
    3. BPCL lets contracts for expansions at Bina, Mumbai refineriesOil & Gas Journal · 2026-01-08
    4. New construction: BPCL on track to complete Bina expansion by 2028Chemical Week (ChemWeek digital edition, Aug 31/Sep 7 2026) · 2026-09-04
    5. Bharat Petroleum awards contract for Bina refinery expansionOil & Gas Journal · 2026-06-30

    Position on the globe: 24.20°N 78.20°E. Location approximate: Bina refinery, Madhya Pradesh, central India.

    This project on its own page - facts, sources and a summary to share.

  21. 21 / 24Floating LNG

    ZLNG nearshore FLNG (PETRONAS FLNG 3), Sipitang, Sabah

    Malaysia

    A complete floating LNG plant.

    SizeMinimum 2 mtpa nearshore FLNG (reported ~2.1 mtpa)

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication …

    Who builds it

    • PETRONAS operator
    • JGC Corporation
    • Samsung Heavy Industries

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A complete floating LNG plant — hull, ~40,000 t of topsides and onshore receiving works — being integrated in Korea for delivery and commissioning in Sabah in 2027.

    Phase in full, as reported

    fabrication (hull launched Feb 2025; topsides module integration at Samsung Heavy's Geoje yard ongoing)

    Who builds it as stated by the sources

    Operator / developerPETRONAS

    • JGC CorporationLead consortium partner on the EPCC contract: engineering, procurement and commissioning of the FLNG topsides and associated onshore facilities, plus overall project management
    • Samsung Heavy IndustriesConsortium partner: EPC of the FLNG hull and modular fabrication of the topsides at Geoje (steel cut April 2024, hull launched February 2025)

    Key dates as stated by the sources

    FID or award
    EPCC contract awarded to JGC–Samsung Heavy, announced 6 January 2023
    Milestone
    Steel-cutting/construction start at Geoje, April 2024; hull launch reported 26 February 2025
    Startup target
    Completion scheduled 2027 (JGC); start-up targeted second half of 2027 per trade press

    Disciplines likely needed our inference

    • LNG process and commissioning engineering
    • module integration / mechanical completion
    • E&I and instrumentation
    • marine/mooring engineering
    • QA/QC and inspection
    • project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. JGC Awarded Contract for First Nearshore Floating LNG Plant in MalaysiaJGC Holdings (company newsroom) · 2023-01-06
    2. Petronas awards JGC-Samsung contract for third Malaysian FLNGOil & Gas Journal · 2023-01-09
    3. Petronas Starts Construction of Third Floating LNG FacilityWorld-Energy (trade press) · 2024-04-02
    4. Samsung Heavy launches Petronas' third FLNGLNG Prime (trade press, paywalled) · 2025-02-26
    5. Samsung Heavy launches 'Cedar FLNG'; world-first simultaneous construction of three FLNGs (Korean)Seoul Shinmun · 2026-06-05

    Position on the globe: 5.08°N 115.55°E. Location approximate: To be moored nearshore at the Sipitang Oil and Gas Industrial Park (SOGIP), Sabah, East Malaysia; hull and topsides under construction at Samsung Heavy Industries' Geoje yard, South Korea.

    This project on its own page - facts, sources and a summary to share.

  22. 22 / 24Offshore gas platforms

    Block B & 48/95, 52/97 gas development (Block B – O Mon gas-to-power)

    Vietnam

    A new offshore gas hub.

    SizeGas for ~3,800 MW of power at O Mon; EPCI#1 >US$1 bn

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication / construction …

    Who builds it

    • Phu Quoc Petroleum Operating Company operator
    • McDermott
    • PTSC
    • Vietsovpetro

    Reported risk First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A new offshore gas hub — central production platform, living-quarters platform, flare and bridges — fabricated in Vietnam under a McDermott-led EPCI contract, then installed and hooked up offshore.

    Phase in full, as reported

    fabrication / construction (EPCI#1 at ~29% overall progress with detailed engineering >71% as of August 2025; LQ fabrication underway)

    Reported risk in full, as reported

    First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module. Downstream power plants lag: until end-2028 mainly O Mon I will be able to take Block B gas.

    Who builds it as stated by the sources

    Operator / developerPhu Quoc Petroleum Operating Company (PQPOC) for Petrovietnam (PVN), with MOECO, PVEP, PV Gas and PTTEP as partners

    • McDermottConsortium leader with PTSC for EPCI package #1: EPCI and hook-up/commissioning of the central production platform, living-quarters platform, flare tower and bridges (limited letter of award Oct 2023; full contract value >US$1 billion)
    • PTSC (Petrovietnam Technical Services Corporation)Consortium partner on EPCI#1; PTSC M&C fabricating the living-quarter module (LQM, ~2,643 t) and living-quarter utility deck (LQU, ~3,236 t) — first cut August 2025, LQM load-out scheduled 24 February 2027
    • VietsovpetroFabrication yard (VSP yard) named by PTSC for the living-quarter units

    Key dates as stated by the sources

    FID or award
    EPCI#1 limited letter of award to McDermott–PTSC on 31 October 2023; consortium leading the package since October 2023
    Milestone
    LQM fabrication commenced 1 August 2025; LQM load-out scheduled 24 February 2027
    Startup target
    First gas from Block B no later than Q3 2027 (Government Office Notification 487/TB-VPCP, 15 September 2026); O Mon I commercial operation December 2027, O Mon IV December 2028, O Mon II Q4 2029, O Mon III May 2030 (Can Tho Department of Industry and Trade, October 2026)

    Disciplines likely needed our inference

    • structural/topsides fabrication supervision
    • piping and E&I engineering
    • offshore installation and HUC
    • pipeline engineering
    • commissioning (gas processing, power)
    • project controls/planning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. McDermott, PTSC Consortium Receives Limited Letter of Award for Block B Gas Development Project Offshore VietnamMcDermott (company newsroom) · 2023-10-31
    2. PTSC commences construction of LQM and LQU for the Vietnam Block B Gas ProjectPTSC (company news) · 2025-08
    3. Vietnam's gas-to-power project moves forward with planned investment nearing $12 billionOffshore Energy (trade press) · 2024-06-04
    4. Vietnam aims to fuel 3 power plants with Block B gas: PMThe Investor (Vietnam) · 2024-05-13
    5. Chuỗi dự án khí - điện Lô B - Ô Môn: Tiến độ của một mắt xích không thể tách khỏi toàn ChuỗiNăng lượng Việt Nam (Vietnam Energy Association journal) · 2026-09-22
    6. Chuỗi dự án khí - điện Lô B - Ô Môn và lịch tiến độ tích hợp các dự án thượng nguồn, trung nguồn, hạ nguồnNăng lượng Việt Nam · 2026-09-24
    7. Cần Thơ: Dòng khí Lô B dự kiến về năm 2027, các nhà máy Ô Môn vận hành từ cuối 2028Báo Xây dựng (Ministry of Construction newspaper) · 2026-10-01

    Position on the globe: 7.90°N 103.20°E. Location approximate: Blocks B, 48/95 and 52/97 in the Malay–Tho Chu basin, southwest Vietnam continental shelf, ~77 m water depth, 300+ km offshore Ca Mau; gas piped ~400 km to the O Mon power complex at Can Tho. Exact CPP location not published in sources checked.

    This project on its own page - facts, sources and a summary to share.

  23. 23 / 24Subsea gas

    Jansz-Io Compression (Gorgon gas supply)

    Australia

    A subsea-compression scheme keeping one of the world's largest LNG plants (Gorgon) supplied as its field ages.

    SizeMaintains feed-gas supply to Gorgon LNG's three 15.6 MTPA trains via a 27,000-tonne floating field control station and ~6,500 tonnes of subsea compression infrastructure

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning (named in the reported phase)

    Phase, as reported: installation / commissioning …

    Who builds it

    • Chevron Australia operator
    • Saipem

    Reported risk Schedule has moved…

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A subsea-compression scheme keeping one of the world's largest LNG plants (Gorgon) supplied as its field ages — a rare, technically complex subsea-compression build with its own multi-year commissioning tail.

    Phase in full, as reported

    installation / commissioning (Chevron's December 2024 indicative schedule runs installation from late-2024 to mid-2027; commissioning and start-up to commence from 2026/2027)

    Reported risk in full, as reported

    Schedule has moved: Chevron's December 2024 update extended the installation window from mid-2024–mid-2026 to late-2024–mid-2027, with the compression station installed in two campaigns; no public start-up announcement found as of October 2026.

    Who builds it as stated by the sources

    Operator / developerChevron Australia (Gorgon joint venture)

    • Chevronoperator
    • Saipemcontractor, ~$4bn order for the compression project scope

    Key dates as stated by the sources

    Sanctioned
    2021 (project proceeded)
    Startup target
    Commissioning, start-up and operation expected to commence from 2026/2027 (Chevron operations environment plan, accepted by NOPSEMA 26 March 2026)

    Disciplines likely needed our inference

    • subsea engineering
    • commissioning
    • controls/instrumentation
    • offshore installation supervision
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Chevron's Jansz-Io compression project on trackOffshore Magazine · 2024
    2. Saipem wins contract for Chevron's Jansz-Io compression projectLNG Prime · 2021-2022
    3. Gorgon and Jansz Feed Gas Pipeline and Wells Operations (environment plan summary)NOPSEMA (Australian offshore regulator) · 2024-12
    4. Jansz-Io Compression Installation (information sheet, Dec 2024)Chevron Australia · 2024-12

    Position on the globe: 20.75°S 115.40°E. Location approximate: Jansz-Io gas field / Barrow Island, offshore Western Australia.

    This project on its own page - facts, sources and a summary to share.

  24. 24 / 24Offshore wind

    Fengmiao 1 offshore wind farm

    Taiwan

    Taiwan's first Round-3.1 offshore wind project to reach financial close.

    Size495-500 MW

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Copenhagen Infrastructure Partners operator
    • Van Oord
    • DEME
    • Jan De Nul

    3 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Taiwan's first Round-3.1 offshore wind project to reach financial close, and a clean example of Dutch and Belgian marine contractors splitting scope on the same project (Van Oord on cables, DEME on foundations) — the kind of specialised installation work that draws Dutch offshore crews to Asia-Pacific.

    Phase in full, as reported

    installation (99 pin piles, offshore substation and both export cables complete as of early August 2026; CDWE's installation of the 33 jacket foundations follows; inter-array cables from 2027)

    Who builds it as stated by the sources

    Operator / developerCopenhagen Infrastructure Partners (CIP), developed via Copenhagen Offshore Partners

    • Copenhagen Infrastructure Partners / Copenhagen Offshore Partnersdeveloper
    • Van Oordtransport, installation and burial of 33 inter-array cables (~64 km) using cable-lay vessel Nexus, starting 2027
    • DEME, via its Taiwanese JV CDWEtransport & installation of 33 jacket foundations, pin piles and the offshore substation, from Q1 2026, using vessel Green Jade
    • Jan De Nulinstallation and protection of the two high-voltage export cables (~45 km and ~44 km) with cable-layer Willem de Vlamingh; both pulled into the offshore substation by August 2026

    Key dates as stated by the sources

    Financial close
    March 2025
    Completion target
    Commercial operation scheduled 2027

    Disciplines likely needed our inference

    • marine installation supervision
    • cable engineering
    • geotechnical/foundation engineering
    • HSE
    • commissioning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Van Oord, CIP awards Fengmiao 1 wind construction work offshore TaiwanOffshore Magazine · 2025-01-14
    2. Offshore Substation, Export Cable Works Completed at Taiwan's Fengmiao 1Offshore Wind (offshorewind.biz) · 2026-08-05
    3. Construction milestones at Fengmiao I Offshore Wind FarmOcean Energy Resources · 2026-08-05

    Position on the globe: 24.30°N 120.30°E. Location approximate: ~35 km off Taichung, central Taiwan.

    This project on its own page - facts, sources and a summary to share.