Ten projects to watch.

Large projects being built in 2026–2029, with real demand for technical professionals, spread across regions and kinds. A selection — not a ranking. Follow any of them in your Radar.

Process & technology

Showing 10 of 29 · Process & technology, worldwide. Show all

How we check

Every project is checked by hand against at least two public sources — company newsrooms, regulators, trade press. No commercial databases.

Each card shows its sources and the date we checked them (every project in this set: on or after 2026-10-08). We re-check every month; a project that finishes or is cancelled leaves the tour.

Companies appear as sourced project facts only. Reported risks are shown as reported. The discipline lists are our own inference and say so. The small dots are other projects from public datasets — context, not checked by us.

  1. 01 / 10LNG

    Rio Grande LNG — Trains 4 and 5

    USA

    One of several US Gulf Coast LNG trains now moving from paper to steel at once.

    SizeTrain 4 and Train 5 add LNG production capacity; combined EPC contract value ~$9.1bn ($4.77bn Train 4 + $4.32bn Train 5)

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: engineering / early construction …

    Who builds it

    • NextDecade Corporation operator
    • Bechtel

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    One of several US Gulf Coast LNG trains now moving from paper to steel at once — Bechtel's fully-wrapped EPC model concentrates years of engineering, procurement and construction-supervision demand into a single contractor's backlog.

    Phase in full, as reported

    engineering / early construction (as of 30 June 2026: Train 4 15.5% complete overall — 69.4% engineering, 25.4% procurement, 1.4% construction; Train 5 9.4% overall — 26.8% engineering, 19.3% procurement; Train 4 soil stabilisation done and foundation pours started for the main cryogenic rack, Train 5 soil stabilisation started early July 2026)

    Who builds it as stated by the sources

    Operator / developerNextDecade Corporation

    • NextDecadedeveloper/owner
    • BechtelEPC contractor under fully-wrapped, lump-sum turnkey contracts for Trains 4 and 5 (and the original Phase 1)

    Key dates as stated by the sources

    Train4 NTP
    9 September 2025
    Train5 NTP
    16 October 2025
    First LNG target
    First gas into the facility expected H2 2026; first LNG from Train 1 H1 2027 (Trains 1-3 already under construction; Trains 4-5 follow)

    Disciplines likely needed our inference

    • process/piping engineering
    • procurement/estimating
    • construction supervision
    • QA/QC
    • planning/project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NextDecade Executes EPC Contract with Bechtel for Train 4 at the Rio Grande LNG FacilityBechtel (company press release) · 2024-08-05
    2. NextDecade Corp - Form 10-Q - FY2026 (Q1)U.S. Securities and Exchange Commission (SEC filing) · 2026-Q1
    3. NextDecade Finalizes EPC Contract Refresh for Train 4 and Executes EPC Contract for Train 5 at the Rio Grande LNG FacilityNextDecade Corporation (investor newsroom) · 2025-10
    4. NextDecade Corp - Form 10-Q for the quarter ended 30 June 2026U.S. Securities and Exchange Commission (SEC filing) · 2026-07-30

    Position on the globe: 25.97°N 97.26°W. Location approximate: Port of Brownsville, Texas.

    This project on its own page - facts, sources and a summary to share.

  2. 02 / 10Deepwater FPSO

    SEAP-I and SEAP-II FPSOs (P-81, P-87) — Sergipe-Alagoas basin

    Brazil

    Two more Fast4Ward-hull FPSOs entering SBM Offshore's record backlog right as Schiedam engineering ramps up.

    SizeCombined up to 240,000 bopd and 22 million m3/day gas; SEAP-II (P-87) alone: 120,000 bopd, 425 MMcfd gas treatment, 120,000 bpd water injection

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: FIDs taken …

    Who builds it

    • Petrobras operator
    • SBM Offshore

    Reported risk Gas-export pipeline tender paused (September 2026)…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Two more Fast4Ward-hull FPSOs entering SBM Offshore's record backlog right as Schiedam engineering ramps up — a multi-year pipeline of FPSO design, procurement and commissioning roles, on top of Jaguar and SBM's other current builds.

    Phase in full, as reported

    FIDs taken (SEAP-II late 2025, SEAP-I April 2026); SBM engineering and procurement started on both FPSOs (each <25% complete at H1 2026)

    Reported risk in full, as reported

    Gas-export pipeline tender paused (September 2026). Petrobras has 'taken a step back' on the ~US$1 bn tender to assess Brazil's planned 'gas release' rules, which its E&P director had warned in July 2026 could delay the pipeline: a risk to the 2031 gas-export date rather than, so far, to the FPSO schedule.

    Who builds it as stated by the sources

    Operator / developerPetrobras

    • Petrobrasoperator, FID holder
    • SBM Offshorebuild-operate-transfer contractor for both FPSOs; Petrobras will own the units, SBM operates for an initial 6.5 years

    Key dates as stated by the sources

    FID
    SEAP-II FID late 2025, SEAP-I FID April 2026; contracts signed by SBM Offshore late May 2026
    Startup target
    First oil targeted 2030, gas exports from 2031; SBM contractual handover SEAP-II (P-87) 2030, SEAP-I (P-81) 2031

    Disciplines likely needed our inference

    • topsides/process engineering
    • project engineering/management
    • procurement/estimating
    • E&I
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore signed contracts for Petrobras' FPSOs SEAP-I and SEAP-IISBM Offshore (company newsroom) · 2026-05-29
    2. Petrobras takes FID on SEAP FPSO development in Brazil basinWorld Oil · 2026-04-14
    3. Petrobras bringing $12-billion oil & gas project pair to life with SBM Offshore on FPSO duty for bothOffshore Energy · 2026
    4. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    5. Petrobras 'dá um passo atrás' na licitação do gasoduto de SEAP para avaliar impactos do gas release, diz BaruzziABEGÁS (republishing eixos) · 2026-09-29
    6. Gas release pode atrasar projeto do gasoduto de SEAP, diz Petrobraseixos · 2026-07-30
    7. R$ 60 bilhões, duas plataformas e 32 poços: megaprojeto da Petrobras avança em Sergipe, mas gasoduto bilionário fica em esperaClick Petróleo e Gás · 2026-10-03

    Position on the globe: 11.00°S 36.30°W. Location approximate: Sergipe-Alagoas basin, offshore northeastern Brazil (off Sergipe state); exact block coordinates not published in sources checked.

    This project on its own page - facts, sources and a summary to share.

  3. 03 / 10Refinery & fuels

    SkyNRG DSL-01 sustainable aviation fuel plant, Delfzijl

    Netherlands

    Europe's first standalone greenfield SAF plant, built under a Technip Energies EPCC contract in the EUR 500 million to 1 billion class.

    Size100,000 tonnes of SAF per year plus 35,000 tonnes of sustainable by-products; on-site hydrogen plant (SMR)

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • SkyNRG operator
    • Technip Energies
    • Topsoe
    • KLM Royal Dutch Airlines

    3 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Europe's first standalone greenfield SAF plant, built under a Technip Energies EPCC contract in the EUR 500 million to 1 billion class — two years of process, piping, E&I and commissioning work on one Dutch site.

    Phase in full, as reported

    construction (financial close and start of construction announced 2026-02-13)

    Who builds it as stated by the sources

    Operator / developerSkyNRG

    • Technip EnergiesEPCC contractor (engineering, procurement, construction and commissioning) after completing the FEED; contract classed by Technip Energies as 'substantial' (EUR 500 million to 1 billion)
    • TopsoeHydroFlex hydroprocessing technology licensor (HEFA pathway), as reported
    • KLM Royal Dutch Airlinesprimary off-taker and equity shareholder, as reported

    Key dates as stated by the sources

    Contract award
    2026-02-12 (Technip Energies EPCC)
    Financial close construction start
    2026-02-13
    Startup target
    mid-2028, as reported by trade press

    Disciplines likely needed our inference

    • process engineering
    • piping engineering
    • E&I
    • construction supervision
    • commissioning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies awarded a substantial contract for SkyNRG's Sustainable Aviation Fuel project in the NetherlandsTechnip Energies (company newsroom) · 2026-02-12
    2. SkyNRG starts construction on its first SAF plant in Delfzijl, the NetherlandsHydrocarbon Processing · 2026-02-13
    3. SkyNRG announces Financial Close and starts construction on its first Sustainable Aviation Fuel plant DSL-01 in DelfzijlGroningen Seaports (port authority newsroom) · 2026-02

    Position on the globe: 53.31°N 6.95°E. Location approximate: Chemical park at Delfzijl, Groningen province; coordinate is the park, not the plot.

    This project on its own page - facts, sources and a summary to share.

  4. 04 / 10CCS

    Northern Lights CO2 transport & storage — Phase 2

    Norway

    The reference project for CCS-as-infrastructure in Europe.

    SizeRaises transport & storage capacity from 1.5 to more than 5 million tonnes CO2/year

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: engineering / fabrication …

    Who builds it

    • Northern Lights JV operator
    • Subsea7
    • Aker Solutions
    • SLB OneSubsea

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The reference project for CCS-as-infrastructure in Europe — offshore pipeline, injection wells and receiving-terminal expansion all running in parallel, a template for the CO2 value chains (incl. Porthos in Rotterdam) that Dutch engineering firms are also chasing.

    Phase in full, as reported

    engineering / fabrication (detailed engineering in full swing, fabrication underway at several yards per March 2026 reporting)

    Who builds it as stated by the sources

    Operator / developerNorthern Lights JV — Equinor, Shell and TotalEnergies (each 33.3%)

    • Equinor / Shell / TotalEnergies (Northern Lights JV)developer, FID holder
    • Subsea7technical service provider — EPCI of a ~5 km CO2 pipeline plus satellite structures, umbilicals, tie-ins, offshore ops 2026-2027
    • Aker SolutionsEPC contracts for Phase 2 (scope not itemised in sources checked)
    • SLB OneSubseaEPC contract for the CO2 subsea injection system

    Key dates as stated by the sources

    FID
    March 2025
    Startup target
    From 2028

    Disciplines likely needed our inference

    • pipeline/subsea engineering
    • process engineering (terminal)
    • offshore installation supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Northern Lights Phase 2: Expanding Europe's CO2 Storage CapacityNorthern Lights (project operator) · 2025-2026
    2. Northern Lights: a CO2 transport and storage project to reduce industrial emissions in EuropeTotalEnergies · 2026
    3. Subsea7 starts engineering for Northern Lights Phase 2 CO2 pipelineOffshore Magazine · 2026
    4. Investing NOK 7.5 billion in expansion of the groundbreaking Northern Lights CCS-projectEquinor (company newsroom) · 2025-03-27

    Position on the globe: 60.61°N 4.87°E. Location approximate: Øygarden receiving/injection terminal near Bergen, Norway.

    This project on its own page - facts, sources and a summary to share.

  5. 05 / 10Green hydrogen

    NEOM Green Hydrogen Complex

    Saudi Arabia

    The world's largest green-hydrogen/ammonia project moving from construction into commissioning right now.

    SizeUp to 600 tonnes/day of hydrogen, converted to green ammonia for export; ~4 GW of integrated solar/wind power

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation
    6. Commissioning (named in the reported phase)

    Phase, as reported: commissioning …

    Who builds it

    • NEOM Green Hydrogen Company operator
    • Air Products
    • Yara International

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The world's largest green-hydrogen/ammonia project moving from construction into commissioning right now — a preview of the scale and discipline mix (electrolysis, ammonia synthesis, huge renewables integration) the hydrogen economy will need repeated at smaller scale elsewhere, including in the Netherlands.

    Phase in full, as reported

    commissioning (construction completed, commissioning underway as of August 2026)

    Who builds it as stated by the sources

    Operator / developerNEOM Green Hydrogen Company (NGHC) — joint venture of NEOM, ACWA Power and Air Products

    • NEOM Green Hydrogen Company (NEOM/ACWA Power/Air Products JV)developer/owner
    • Air Productsmain EPC contractor and system integrator (finalised $6.7bn EPC agreement, May 2023); holds 30-year ammonia offtake
    • Yara Internationalmarketing and distribution partner for the NEOM green ammonia not used by Air Products; agreement finalised mid-2026

    Key dates as stated by the sources

    EPC award
    May 2023
    Startup target
    Commercial operations targeted 2027

    Disciplines likely needed our inference

    • process/electrolysis engineering
    • commissioning
    • E&I
    • construction management
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. NEOM Green Hydrogen ComplexAir Products (company project page) · 2026
    2. NEOM green hydrogen complex finishes $8.4 billion construction, targets 2027 ammonia exportsFertilizer Daily · 2026-08-25
    3. Saudi Neom green hydrogen project nears completionAGBI · 2026-02
    4. NEOM ammonia marketing and distribution agreement finalisedAmmonia Energy Association · 2026-08-10

    Position on the globe: 27.80°N 35.20°E. Location approximate: Oxagon, NEOM megaproject region, northwest Saudi Arabia.

    This project on its own page - facts, sources and a summary to share.

  6. 06 / 10LNG

    Ruwais LNG — two-train all-electric export plant

    United Arab Emirates

    A greenfield 9.6 mtpa LNG plant in full construction under a Technip Energies-led EPC JV.

    Size9.6 mtpa, two trains, all-electric; US$5.5 bn EPC; COD H2 2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • ADNOC operator
    • Technip Energies
    • JGC Corporation
    • NMDC Energy

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A greenfield 9.6 mtpa LNG plant in full construction under a Technip Energies-led EPC JV, with electric-drive liquefaction new to the region; peak construction and commissioning run to 2028.

    Phase in full, as reported

    construction (ADNOC Gas reported in January 2026 that construction works are progressing ahead of approved schedules)

    Who builds it as stated by the sources

    Operator / developerADNOC (ADNOC Gas to acquire a 60% stake at completion)

    • Technip EnergiesLeader of the TJN RUWAIS joint venture holding the US$5.5 billion EPC contract for the two liquefaction trains
    • JGC CorporationEPC joint-venture partner
    • NMDC Energy (formerly NPCC)EPC joint-venture partner (construction)

    Key dates as stated by the sources

    FID or award
    FID and US$5.5 billion EPC award to Technip Energies/JGC/NMDC Energy JV announced 13 June 2024 (early EPC/limited notice to proceed from March 2024)
    Startup target
    Commercial operations planned for the second half of 2028; ADNOC Gas sees potential to bring this forward

    Disciplines likely needed our inference

    • LNG process/commissioning engineering
    • electrical (HV drives, substations)
    • piping and mechanical construction supervision
    • instrumentation and control systems
    • QA/QC
    • project controls/planning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies, JGC and NMDC Energy awarded a major contract for ADNOC's Ruwais LNG project in the UAETechnip Energies (company newsroom) · 2024-06-13
    2. NMDC Energy (formerly NPCC), Technip Energies, and JGC awarded a major contract worth US$5.5 billion for ADNOC's Ruwais LNG project in the UAENMDC Group (company newsroom) · 2024-06-13
    3. ADNOC advances Ruwais LNG project with early EPC activitiesOil & Gas Journal · 2024-03-13
    4. ADNOC Gas sees potential to advance Ruwais LNG commercial startReuters via Zawya · 2026-01-26
    5. ADNOC Gas Delivers Resilient Q2 Net Income, Takes FID on Major Growth ProjectsADNOC Gas (company newsroom) · 2026-08-10
    6. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28

    Position on the globe: 24.12°N 52.73°E. Location approximate: Al Ruwais Industrial City, Al Dhafrah region, Abu Dhabi.

    This project on its own page - facts, sources and a summary to share.

  7. 07 / 10Oil & gas, onshore

    Gas Growth Integrated Project (GGIP), Ratawi

    Iraq

    Three plants built at once in southern Iraq.

    Size5 million b/d treated seawater; oil to 210,000 b/d; 300 MMcf/d gas; 1 GW solar

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • TotalEnergies operator
    • Hyundai E&C
    • ENKA
    • China Petroleum Pipeline Engineering

    Reported risk Ratawi phase 1 has slipped repeatedly…

    9 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Three plants built at once in southern Iraq: a US$3 bn seawater treatment plant (Hyundai E&C EPC), an oilfield redevelopment to 210,000 b/d and a 300 MMcf/d gas plant. TotalEnergies reports ~7,000 workers at peak.

    Phase in full, as reported

    construction (all four GGIP components in execution since September 2025; CSSP and Ratawi full-field construction launched 14 September 2025; GMP and solar under construction since early 2025)

    Reported risk in full, as reported

    Ratawi phase 1 has slipped repeatedly: TotalEnergies cited Middle East conflict and Strait of Hormuz disruption to equipment shipments, and MEED reports Iraqi customs clearance of critical equipment as the main delay as of September 2026. Security and logistics conditions in southern Iraq remain a risk.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies (45%, operator) with Basra Oil Company (30%) and QatarEnergy (25%)

    • Hyundai E&CEPC contractor (engineering, procurement, supply, construction and commissioning) for the Common Seawater Supply Project treatment plant, contract signed 14 September 2025; reported value ~KRW 4 trillion / US$2.9–3.16 billion, ~4-year build
    • ENKAReported contractor for Ratawi's second central processing facility, contract value above US$1 billion; civil and piping works under way (MEED, May 2026; not confirmed in a contractor press release we opened)
    • China Petroleum Pipeline Engineering (CPP/CPECC)Reported contractor for the US$2.5 billion CSSP pipeline package (MEED, Sept 2026); earlier reported for the Gas Midstream Project (Zawya). Not confirmed in a contractor press release we opened

    Key dates as stated by the sources

    FID or award
    CSSP EPC contract to Hyundai E&C and Ratawi full-field development launched 14 September 2025 (TotalEnergies press release 15 September 2025)
    Milestone
    Ratawi phase 1 (120,000 b/d) first oil now targeted Q4 2026 (TotalEnergies, Sept 2026), after slipping from early 2026 and then the first half of 2026; MEED reported in September 2026 that start-up was mid-to-late October at the earliest
    Startup target
    Ratawi phase 2 to 210,000 b/d from 2028 (reconfirmed by TotalEnergies Sept 2026); CSSP start-up scheduled late 2028 or early 2029 per MEED (Sept 2026), ~49-month build per Hyundai E&C

    Disciplines likely needed our inference

    • water treatment / process engineering
    • pipeline and pumping station engineering
    • construction management
    • commissioning and start-up
    • E&I
    • HSE and security-aware project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Iraq: TotalEnergies Launches the Construction of the Final Two Major Projects of the GGIPTotalEnergies (company newsroom) · 2025-09-15
    2. Hyundai E&C wins W4tr deal for Iraq seawater treatment plantThe Korea Herald · 2025-09-15
    3. Iraq awards Hyundai E&C contract for Common Seawater Supply Project under GGIPZawya Projects · 2025-09
    4. Iraq's $10bln GGIP advances with Hyundai, ENKA, CPECC contractsZawya Projects · 2025-09
    5. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28
    6. TotalEnergies 2Q2026 Earnings Call transcriptTotalEnergies (investor relations) · 2026-07-23
    7. Customs clearance delaying project to develop Iraqi oil fieldMEED · 2026-09-07
    8. Groundworks underway for major Iraqi water projectMEED · 2026-09-10
    9. Piping work ongoing for Iraq field development projectMEED · 2026-05-15

    Position on the globe: 30.18°N 47.90°E. Location approximate: Seawater treatment plant on the coast near Umm Qasr / Khor Al-Zubair port, Basra governorate; Ratawi (Artawi) oil field and gas midstream plant inland near Basra. Coordinate marks the Khor Al-Zubair area.

    This project on its own page - facts, sources and a summary to share.

  8. 08 / 10Refinery & petrochemicals

    BPCL Bina refinery and petrochemicals expansion (BPREP)

    India

    A US$5+ bn refinery-plus-cracker complex in mid-construction.

    Size550 KTPA polypropylene + 50 KTPA Butene-1 (Technip Energies scope) within an 11 MMTPA refinery and 1.2 MMTPA cracker programme

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • Bharat Petroleum Corporation Limited operator
    • Technip Energies

    Reported risk Technip Energies holds one package within the wider BPREP programme…

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A US$5+ bn refinery-plus-cracker complex in mid-construction, with Technip Energies executing the polypropylene and Butene-1 units on an EPCC basis for a 2028 finish.

    Phase in full, as reported

    construction (about 31% of physical construction complete in the April–June 2026 quarter, with a quarter of project cost awarded for execution, per BPCL officials; downstream unit EPCC awards placed late 2025)

    Reported risk in full, as reported

    Technip Energies holds one package within the wider BPREP programme; Larsen & Toubro holds the EPCC for the LLDPE/HDPE swing unit (two 575 KTPA trains, December 2025). BPCL names the Middle East conflict as a challenge but says the project remains on schedule.

    Who builds it as stated by the sources

    Operator / developerBharat Petroleum Corporation Limited (BPCL)

    • Technip EnergiesEPCC contractor for the new 550 KTPA polypropylene and 50 KTPA Butene-1 units at Bina (awarded Q4 2025, announced 7 January 2026; together with a Mumbai PRFCC EPsCm contract classed as a 'large' award, EUR 250–500 million)

    Key dates as stated by the sources

    FID or award
    Technip Energies EPCC award recorded Q4 2025, announced 7 January 2026
    Startup target
    BPREP completion targeted May 2028, reaffirmed by BPCL in August/September 2026 despite the Middle East conflict

    Disciplines likely needed our inference

    • process and polymer-unit engineering
    • piping/mechanical construction supervision
    • E&I and control systems
    • commissioning and start-up
    • QA/QC and inspection
    • project controls/planning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Technip Energies awarded two large contracts by BPCL for new units at Bina and Mumbai refineries in IndiaTechnip Energies (company newsroom) · 2026-01-07
    2. Technip Energies awarded two large contracts by BPCLHydrocarbon Engineering · 2026-01-07
    3. BPCL lets contracts for expansions at Bina, Mumbai refineriesOil & Gas Journal · 2026-01-08
    4. New construction: BPCL on track to complete Bina expansion by 2028Chemical Week (ChemWeek digital edition, Aug 31/Sep 7 2026) · 2026-09-04
    5. Bharat Petroleum awards contract for Bina refinery expansionOil & Gas Journal · 2026-06-30

    Position on the globe: 24.20°N 78.20°E. Location approximate: Bina refinery, Madhya Pradesh, central India.

    This project on its own page - facts, sources and a summary to share.

  9. 09 / 10Floating LNG

    ZLNG nearshore FLNG (PETRONAS FLNG 3), Sipitang, Sabah

    Malaysia

    A complete floating LNG plant.

    SizeMinimum 2 mtpa nearshore FLNG (reported ~2.1 mtpa)

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication …

    Who builds it

    • PETRONAS operator
    • JGC Corporation
    • Samsung Heavy Industries

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A complete floating LNG plant — hull, ~40,000 t of topsides and onshore receiving works — being integrated in Korea for delivery and commissioning in Sabah in 2027.

    Phase in full, as reported

    fabrication (hull launched Feb 2025; topsides module integration at Samsung Heavy's Geoje yard ongoing)

    Who builds it as stated by the sources

    Operator / developerPETRONAS

    • JGC CorporationLead consortium partner on the EPCC contract: engineering, procurement and commissioning of the FLNG topsides and associated onshore facilities, plus overall project management
    • Samsung Heavy IndustriesConsortium partner: EPC of the FLNG hull and modular fabrication of the topsides at Geoje (steel cut April 2024, hull launched February 2025)

    Key dates as stated by the sources

    FID or award
    EPCC contract awarded to JGC–Samsung Heavy, announced 6 January 2023
    Milestone
    Steel-cutting/construction start at Geoje, April 2024; hull launch reported 26 February 2025
    Startup target
    Completion scheduled 2027 (JGC); start-up targeted second half of 2027 per trade press

    Disciplines likely needed our inference

    • LNG process and commissioning engineering
    • module integration / mechanical completion
    • E&I and instrumentation
    • marine/mooring engineering
    • QA/QC and inspection
    • project controls

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. JGC Awarded Contract for First Nearshore Floating LNG Plant in MalaysiaJGC Holdings (company newsroom) · 2023-01-06
    2. Petronas awards JGC-Samsung contract for third Malaysian FLNGOil & Gas Journal · 2023-01-09
    3. Petronas Starts Construction of Third Floating LNG FacilityWorld-Energy (trade press) · 2024-04-02
    4. Samsung Heavy launches Petronas' third FLNGLNG Prime (trade press, paywalled) · 2025-02-26
    5. Samsung Heavy launches 'Cedar FLNG'; world-first simultaneous construction of three FLNGs (Korean)Seoul Shinmun · 2026-06-05

    Position on the globe: 5.08°N 115.55°E. Location approximate: To be moored nearshore at the Sipitang Oil and Gas Industrial Park (SOGIP), Sabah, East Malaysia; hull and topsides under construction at Samsung Heavy Industries' Geoje yard, South Korea.

    This project on its own page - facts, sources and a summary to share.

  10. 10 / 10Offshore gas platforms

    Block B & 48/95, 52/97 gas development (Block B – O Mon gas-to-power)

    Vietnam

    A new offshore gas hub.

    SizeGas for ~3,800 MW of power at O Mon; EPCI#1 >US$1 bn

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication / construction …

    Who builds it

    • Phu Quoc Petroleum Operating Company operator
    • McDermott
    • PTSC
    • Vietsovpetro

    Reported risk First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A new offshore gas hub — central production platform, living-quarters platform, flare and bridges — fabricated in Vietnam under a McDermott-led EPCI contract, then installed and hooked up offshore.

    Phase in full, as reported

    fabrication / construction (EPCI#1 at ~29% overall progress with detailed engineering >71% as of August 2025; LQ fabrication underway)

    Reported risk in full, as reported

    First gas has moved from end-2026 to no later than Q3 2027, consistent with the February 2027 load-out of the living-quarters module. Downstream power plants lag: until end-2028 mainly O Mon I will be able to take Block B gas.

    Who builds it as stated by the sources

    Operator / developerPhu Quoc Petroleum Operating Company (PQPOC) for Petrovietnam (PVN), with MOECO, PVEP, PV Gas and PTTEP as partners

    • McDermottConsortium leader with PTSC for EPCI package #1: EPCI and hook-up/commissioning of the central production platform, living-quarters platform, flare tower and bridges (limited letter of award Oct 2023; full contract value >US$1 billion)
    • PTSC (Petrovietnam Technical Services Corporation)Consortium partner on EPCI#1; PTSC M&C fabricating the living-quarter module (LQM, ~2,643 t) and living-quarter utility deck (LQU, ~3,236 t) — first cut August 2025, LQM load-out scheduled 24 February 2027
    • VietsovpetroFabrication yard (VSP yard) named by PTSC for the living-quarter units

    Key dates as stated by the sources

    FID or award
    EPCI#1 limited letter of award to McDermott–PTSC on 31 October 2023; consortium leading the package since October 2023
    Milestone
    LQM fabrication commenced 1 August 2025; LQM load-out scheduled 24 February 2027
    Startup target
    First gas from Block B no later than Q3 2027 (Government Office Notification 487/TB-VPCP, 15 September 2026); O Mon I commercial operation December 2027, O Mon IV December 2028, O Mon II Q4 2029, O Mon III May 2030 (Can Tho Department of Industry and Trade, October 2026)

    Disciplines likely needed our inference

    • structural/topsides fabrication supervision
    • piping and E&I engineering
    • offshore installation and HUC
    • pipeline engineering
    • commissioning (gas processing, power)
    • project controls/planning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. McDermott, PTSC Consortium Receives Limited Letter of Award for Block B Gas Development Project Offshore VietnamMcDermott (company newsroom) · 2023-10-31
    2. PTSC commences construction of LQM and LQU for the Vietnam Block B Gas ProjectPTSC (company news) · 2025-08
    3. Vietnam's gas-to-power project moves forward with planned investment nearing $12 billionOffshore Energy (trade press) · 2024-06-04
    4. Vietnam aims to fuel 3 power plants with Block B gas: PMThe Investor (Vietnam) · 2024-05-13
    5. Chuỗi dự án khí - điện Lô B - Ô Môn: Tiến độ của một mắt xích không thể tách khỏi toàn ChuỗiNăng lượng Việt Nam (Vietnam Energy Association journal) · 2026-09-22
    6. Chuỗi dự án khí - điện Lô B - Ô Môn và lịch tiến độ tích hợp các dự án thượng nguồn, trung nguồn, hạ nguồnNăng lượng Việt Nam · 2026-09-24
    7. Cần Thơ: Dòng khí Lô B dự kiến về năm 2027, các nhà máy Ô Môn vận hành từ cuối 2028Báo Xây dựng (Ministry of Construction newspaper) · 2026-10-01

    Position on the globe: 7.90°N 103.20°E. Location approximate: Blocks B, 48/95 and 52/97 in the Malay–Tho Chu basin, southwest Vietnam continental shelf, ~77 m water depth, 300+ km offshore Ca Mau; gas piped ~400 km to the O Mon power complex at Can Tho. Exact CPP location not published in sources checked.

    This project on its own page - facts, sources and a summary to share.