The North Sea, live · Projects

Offshore grid platform

Hollandse Kust (zuid) Alpha

Every fact below is as reported by the linked source, read on 19 Sep 2026. A field the source does not give says “not published”.

Kind
Offshore grid platform
Capacity
700 MW
Phase / status
Operational
Operator
TenneT
Contractors
Petrofac (EPCI, contract awarded July 2018)
Technology
HVAC 700MW standard platform

What’s next as of 19 Sep 2026

In service as part of the 2x700MW Hollandse Kust (Zuid) connection.

Source retrieved 19 Sep 2026

Offshore Wind (2019) · retrieved 19 Sep 2026 · Public information, fact reported with source

52.30°N, 4.08°E. Position approximate: zone centroid approximate. Basemap: Natural Earth.