Offshore wind farm
IJmuiden Ver Gamma-A / Gamma-B wind farm sites
Every fact below is as reported by the linked source, read on 20 Sep 2026. A field the source does not give says “not published”.
- Kind
- Offshore wind farm
- Capacity
- not published
- Phase / status
- In tender
- Developer
- not published
- Operator
- not published
- Contractors
- not published
What’s next as of 20 Sep 2026
Capacity is about 1 GW per site (RVO does not state a combined MW figure for the two sites together). Permit application window for Gamma-A and Gamma-B (Gamma-B added with subsidy in April 2026) now set for 26 November-10 December 2026; RVO expects to announce winners in Q1 2027 - no tender winner yet as of this dataset's retrieval date. Subsidy ceilings were raised in June 2026 to a maximum of EUR 0.117/kWh (Gamma-A) and EUR 0.116/kWh (Gamma-B). See also the RVO Gamma-B permit page: https://english.rvo.nl/subsidies-financing/offshore-wind-energy/permit-ijmuiden-ver-gamma-b
Source retrieved 20 Sep 2026
RVO.nl / Rijksoverheid.nl (2026) · retrieved 20 Sep 2026 · Public information, fact reported with source
On the tender calendar
IJmuiden Ver Gamma-A site permit with subsidy (26 Nov 2026 – 10 Dec 2026), IJmuiden Ver Gamma-B site permit with subsidy (26 Nov 2026 – 10 Dec 2026)