The North Sea, live · Projects

Offshore wind farm

Gemini wind farm

Every fact below is as reported by the linked source, read on 19 Sep 2026. A field the source does not give says “not published”.

Kind
Offshore wind farm
Capacity
600 MW
Phase / status
Operational
Developer / operator
Northland Power (60%), Siemens Project Ventures (20%), ALTE LEIPZIGER-HALLESCHE insurance group (10%, bought from Van Oord in 2018), HVC (10%)
Contractors
not published

What’s next as of 19 Sep 2026

Fully operational since 2017; Van Oord sold its 10% stake to the German ALTE LEIPZIGER-HALLESCHE insurance group in 2018.

Source retrieved 19 Sep 2026

Offshore Wind (Van Oord stake sale, 2018) / Energy Monitor · retrieved 19 Sep 2026 · Public information, fact reported with source

54.03°N, 6.04°E. Position approximate: zone centroid approximate. Basemap: Natural Earth.