Seven projects to watch.

Large projects being built in 2026–2029, with real demand for technical professionals, spread across regions and kinds. A selection — not a ranking. Follow any of them in your Radar.

Americas · Commissioning & start-up

Showing 7 of 29 · Commissioning & start-up, in Americas. Show all

How we check

Every project is checked by hand against at least two public sources — company newsrooms, regulators, trade press. No commercial databases.

Each card shows its sources and the date we checked them (every project in this set: on or after 2026-10-08). We re-check every month; a project that finishes or is cancelled leaves the tour.

Companies appear as sourced project facts only. Reported risks are shown as reported. The discipline lists are our own inference and say so. The small dots are other projects from public datasets — context, not checked by us.

  1. 01 / 07Deepwater FPSO

    Kaskida FPU (bp)

    USA, Gulf of Mexico

    bp's first 20k-psi development: a greenfield hub with FPU fabrication, subsea manufacturing and installation scheduled 2025–2029.

    Size80,000 b/d FPU; six wells at 20,000 psi; first oil 2029

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: FPU under construction at Seatrium …

    Who builds it

    • bp operator
    • Seatrium
    • TechnipFMC
    • SBM Offshore
    • more under “More”

    Reported risk bp is reportedly selling minority stakes in Kaskida and Tiber…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    bp's first 20k-psi development: a greenfield hub with FPU fabrication, subsea manufacturing and installation scheduled 2025–2029 — the design is to be repeated on Tiber.

    Phase in full, as reported

    FPU under construction at Seatrium (steel strike 3Q2025; 25-50% complete at end-June 2026, yard delivery scheduled 2027) and subsea manufacturing in progress towards first oil 2029

    Reported risk in full, as reported

    bp is reportedly selling minority stakes in Kaskida and Tiber. It would keep operatorship (Reuters, via Offshore Magazine, June 2026); no sale announced yet.

    Who builds it as stated by the sources

    Operator / developerbp (100% working interest)

    • bpoperator and sole owner; bp's sixth production hub in the Gulf
    • SeatriumEPC and onshore commissioning of the floating production unit — four-column semisubmersible hull with single topside module, integrated with Goliath twin cranes (Dec 2024)
    • TechnipFMCintegrated EPCI for subsea production systems incl. 20,000-psi standardized trees and manifolds, plus umbilicals, risers and flowlines; 'substantial' award (US$250–500 m), Oct 2024
    • SBM Offshorewet tow and installation of the semi-submersible FPU (Apr 2025)
    • SLB OneSubseasubsea boosting (per OE Digital)
    • Exmar Offshore / Audubon EngineeringFPU hull and topsides design engineering (per OE Digital)

    Key dates as stated by the sources

    FID
    July 2024
    Technipfmc award
    2024-10
    Seatrium EPC award
    2024-12
    Sbm installation award
    2025-04
    First oil target
    2029
    Fpu steel strike
    3Q2025
    Fpu yard delivery
    2027 (Seatrium order book)

    Disciplines likely needed our inference

    • HPHT subsea engineers
    • FPU topsides/hull engineers
    • riser and flowline engineers
    • commissioning engineers
    • marine installation and HSE

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Seatrium to perform EPC work for bp's Kaskida FPUOffshore Magazine · 2024-12-26
    2. BP Hires SBM Offshore to Install Kaskida FPU in Gulf of AmericaOE Digital · 2025-04-30
    3. TechnipFMC Scoops Kaskida Subsea WorkJPT (SPE) · 2024-10-09
    4. Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · 2026-07-31
    5. Seatrium Continues Strong Momentum into 3Q2025 (business update)Seatrium Limited (investor newsroom PDF) · 2025-11-13
    6. bp reportedly initiates sale of minority interests in Kaskida, Tiber projectsOffshore Magazine · 2026-06-16

    Position on the globe: 26.90°N 92.90°W. Location approximate: Keathley Canyon Block 292, ~250 miles (400 km) south-west of New Orleans; water depth ~6,000 ft (1,830 m).

    This project on its own page - facts, sources and a summary to share.

  2. 02 / 07Naval shipbuilding

    PES Frigate — Colombian Navy strategic surface platform programme

    Colombia

    A Dutch-designed warship being built under licence in Latin America.

    Size107.5 m frigate, 14.02 m beam; largest defence vessel Colombia has built, modular construction with 52 naval steel blocks

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: fabrication (first steel-cutting 5 February 2026)

    Who builds it

    • Colombian Navy operator
    • COTECMAR
    • Damen Naval

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A Dutch-designed warship being built under licence in Latin America — a rare naval/shipbuilding entry showing Damen's engineering and technology-transfer model exported far outside Europe, distinct from its troubled domestic ASW-frigate and cancelled German F126 programmes.

    Who builds it as stated by the sources

    Operator / developerColombian Navy (Armada Nacional de Colombia)

    • COTECMARshipyard, local construction
    • Damen NavalSIGMA-based ship design, engineering, technical support and materials, under a contract signed with COTECMAR

    Key dates as stated by the sources

    Steel cutting
    5 February 2026
    Engine delivery
    Late 2026
    Sea trials target
    2029

    Disciplines likely needed our inference

    • naval architecture/structural engineering
    • systems integration
    • project management
    • QA/QC
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. COTECMAR and Damen to build frigate for Colombian NavyDamen (company newsroom) · 2024-08-12
    2. COTECMAR Shipyard Starts Construction of First PES Frigate for Colombian NavyNaval News · 2026-02-05
    3. Colombian Navy awards contract to COTECMAR for first PES frigate, ocean patrol vessel, and logistic support shipJanes · 2022-11-30
    4. El presidente de Colombia visita Cotecmar y conoce sus capacidades de construcción navalInfodefensa · 2026-09-22

    Position on the globe: 10.40°N 75.55°W. Location approximate: COTECMAR shipyard, Cartagena, Colombia.

    This project on its own page - facts, sources and a summary to share.

  3. 03 / 07Offshore wind

    Coastal Virginia Offshore Wind (CVOW)

    USA

    The largest offshore wind farm under construction in the US.

    Size2.6 GW, 176 turbines, 3 offshore substations

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: installation …

    Who builds it

    • Dominion Energy operator
    • Siemens Gamesa
    • Ørsted

    Reported risk A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction…

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    The largest offshore wind farm under construction in the US, and a live example of political/regulatory risk hitting an in-progress project — a case study for how fast schedules and crew mobilisation can move when a stop-work order lands and lifts within weeks.

    Phase in full, as reported

    installation (approx. 81% complete as of 31 July 2026; 31 turbines installed and 32nd underway; first power to the grid March 2026; two of three offshore substations commissioned)

    Reported risk in full, as reported

    A Bureau of Ocean Energy Management stop-work order (December 2025) halted construction; work resumed in January 2026 after a US District Court preliminary injunction, and Interior let the deadline to appeal lapse (April 2026). Project cost rose by an estimated $228 million because of the stoppage; Dominion's budget now stands at $11.65bn (up from $11.4bn) and completion has slipped to end-2027, citing contingency for weather, vessel maintenance, loadout and extended jacking.

    Who builds it as stated by the sources

    Operator / developerDominion Energy

    • Dominion Energydeveloper/owner
    • Siemens Gamesaturbine supplier — 176 x SG 14-222 DD, 14.6 MW turbines
    • Ørstedreported installer of turbine components on monopile foundations (per Windtech International/Siemens Gamesa reporting on the commercial-scale project)

    Key dates as stated by the sources

    Construction start
    November 2023
    Startup target
    Final (176th) turbine expected to be installed by end of 2027 (previously early 2027); third offshore substation to be commissioned by end of 2026
    First power
    23 March 2026

    Disciplines likely needed our inference

    • foundation/T&I engineering
    • cable engineering
    • marine construction supervision
    • commissioning
    • HSE

    Derived by us from project kind and phase - not stated by the sources below.

  4. 04 / 07Deepwater FPSO

    FPSO Jaguar — Whiptail development, Stabroek Block

    Guyana

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch.

    Size250,000 bopd oil, 540 MMcfd associated gas treatment, 300,000 bpd water injection; ~2 MMbbl storage

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: integration / installation …

    Who builds it

    • ExxonMobil operator
    • SBM Offshore

    6 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A brand-new deepwater FPSO hull and topsides being built and commissioned from scratch, on the standardised Fast4Ward programme SBM now repeats project after project — steady multi-year demand for FPSO engineering, hook-up/commissioning and offshore installation crews.

    Phase in full, as reported

    integration / installation (FPSO: topsides fabrication nearing completion, all process modules lifted onboard, integration and commissioning progressing — SBM reports >50%-<75% complete at H1 2026; subsea SURF installation underway since July 2026, scheduled through end-2026)

    Who builds it as stated by the sources

    Operator / developerExxonMobil (Esso Exploration and Production Guyana Ltd.), operator of Stabroek Block on behalf of the Guyana/ExxonMobil/Hess/CNOOC co-venture

    • ExxonMobiloperator / field developer
    • SBM OffshoreFPSO design, construction and (lease/operate) contractor for Jaguar, under its Fast4Ward standardised-hull programme

    Key dates as stated by the sources

    FID or award
    Contract awarded/firmed up 2024 (ExxonMobil FID on Whiptail, SBM contract)
    Startup target
    First production targeted end of 2027 (per Offshore/World Oil reporting, 2026)

    Disciplines likely needed our inference

    • topsides/piping engineering
    • E&I supervision
    • hook-up & commissioning
    • marine/offshore installation
    • HSE
    • project controls/planning

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore Awarded Contracts for ExxonMobil Guyana's FPSO JaguarSBM Offshore (company newsroom) · 2024
    2. SBM Offshore to build FPSO Jaguar for ExxonMobil's Whiptail oil and gas project offshore GuyanaWorld Oil · 2024-04-18
    3. Offshore installation begins for Whiptail project's subsea systemBrazil Energy Insight (trade press) · 2026-07-29
    4. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    5. Seatrium 1H2026 Results presentation (order book project table)Seatrium Limited (SGX filing) · 2026-07-31
    6. ExxonMobil lets SIMOPS management platform for WhiptailOil & Gas Journal · 2026-08-04

    Position on the globe: 9.50°N 57.00°W. Location approximate: Whiptail is the 6th Stabroek Block development, ~200 km offshore Guyana; exact FPSO mooring point not published in sources checked — coordinate is a Stabroek Block-area estimate.

    This project on its own page - facts, sources and a summary to share.

  5. 05 / 07Deepwater FPSO

    GranMorgu (Block 58) FPSO development

    Suriname

    Suriname's first large offshore oil development (US$12.2 bn).

    Size220,000 b/d FPSO; ~190 km subsea lines; first oil mid-2028

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: FPSO construction …

    Who builds it

    • TotalEnergies EP Suriname operator
    • SBM Offshore
    • Technip Energies
    • TechnipFMC
    • more under “More”

    Reported risk No schedule slippage reported…

    8 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Suriname's first large offshore oil development (US$12.2 bn): FPSO construction, ~190 km of subsea lines and an installation campaign running out of Paramaribo through 2027–2028.

    Phase in full, as reported

    FPSO construction (SBM: >50%-<75% complete at H1 2026; Fast4Ward hull launched out of second dry dock, topsides fabrication continuing) and subsea installation campaign started June 2026

    Reported risk in full, as reported

    No schedule slippage reported. Staatsolie's 20% stake (est. US$2.4 bn) is funded through a US$1.6 bn bank loan from 18 lenders (signed 14 May 2025) plus own cash, cash flow and March 2025 bond proceeds; about half of the ~US$12 bn capex had been spent by September 2026.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies EP Suriname

    • TotalEnergiesoperator; partners APA Corporation and Staatsolie (40/40/20 per Ocean Energy Resources, June 2026)
    • SBM Offshoreconstruction and installation of the FPSO in partnership with Technip Energies, plus operations and maintenance after deployment (Nov 2024)
    • Technip EnergiesFPSO EPC partner of SBM Offshore (per SBM Offshore release)
    • TechnipFMCintegrated EPCI (iEPCI) for subsea systems — Subsea 2.0 trees, manifolds, connectors, topside controls, umbilicals, flexible jumpers and flexible risers
    • SaipemEPCI of the SURF package (~US$1.9 bn): ~100 km production flowlines, ~90 km injection lines, T&I of flexible risers, umbilicals and structures; offshore operations started June 2026 from Paramaribo with MCV Normand Navigator

    Key dates as stated by the sources

    FID
    2024-10-01
    Main contract awards
    2024-11-14
    Saipem offshore operations start
    2026-06-24
    First oil target
    mid-2028

    Disciplines likely needed our inference

    • FPSO topsides and hull engineers
    • SURF/pipeline installation engineers
    • subsea controls and commissioning
    • marine base logistics and HSE
    • FPSO operations and maintenance staff

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore awarded contracts for the GranMorgu field developmentSBM Offshore (company newsroom) · 2024-11-14
    2. TotalEnergies awards FPSO, subsea contracts for GranMorgu project offshore SurinameOffshore Magazine · 2024-11-14
    3. Saipem starts operations GranMorgu project in SurinameOcean Energy Resources · 2026-06-24
    4. SBM Offshore's Suriname-bound FPSO for TotalEnergies $12.2B oil project starts taking shapeOffshore Energy · 2025-05-12
    5. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    6. TotalEnergies' offshore project in Suriname on track for first output in mid-2028Pipeline & Gas Journal · 2026-09-20
    7. Staatsolie and the GranMorgu Project backed by broad (inter)national confidenceStaatsolie (company newsroom) · 2025-05-14
    8. Suriname offshore oil and gas momentum builds as GranMorgu advancesWorld Oil · 2026-08-13

    Position on the globe: 7.30°N 55.60°W. Location approximate: Block 58, ~150 km offshore Suriname; FPSO in ~400 m water depth, subsea scope in 100–1,100 m.

    This project on its own page - facts, sources and a summary to share.

  6. 06 / 07Deepwater FPSO

    SEAP-I and SEAP-II FPSOs (P-81, P-87) — Sergipe-Alagoas basin

    Brazil

    Two more Fast4Ward-hull FPSOs entering SBM Offshore's record backlog right as Schiedam engineering ramps up.

    SizeCombined up to 240,000 bopd and 22 million m3/day gas; SEAP-II (P-87) alone: 120,000 bopd, 425 MMcfd gas treatment, 120,000 bpd water injection

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: FIDs taken …

    Who builds it

    • Petrobras operator
    • SBM Offshore

    Reported risk Gas-export pipeline tender paused (September 2026)…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    Two more Fast4Ward-hull FPSOs entering SBM Offshore's record backlog right as Schiedam engineering ramps up — a multi-year pipeline of FPSO design, procurement and commissioning roles, on top of Jaguar and SBM's other current builds.

    Phase in full, as reported

    FIDs taken (SEAP-II late 2025, SEAP-I April 2026); SBM engineering and procurement started on both FPSOs (each <25% complete at H1 2026)

    Reported risk in full, as reported

    Gas-export pipeline tender paused (September 2026). Petrobras has 'taken a step back' on the ~US$1 bn tender to assess Brazil's planned 'gas release' rules, which its E&P director had warned in July 2026 could delay the pipeline: a risk to the 2031 gas-export date rather than, so far, to the FPSO schedule.

    Who builds it as stated by the sources

    Operator / developerPetrobras

    • Petrobrasoperator, FID holder
    • SBM Offshorebuild-operate-transfer contractor for both FPSOs; Petrobras will own the units, SBM operates for an initial 6.5 years

    Key dates as stated by the sources

    FID
    SEAP-II FID late 2025, SEAP-I FID April 2026; contracts signed by SBM Offshore late May 2026
    Startup target
    First oil targeted 2030, gas exports from 2031; SBM contractual handover SEAP-II (P-87) 2030, SEAP-I (P-81) 2031

    Disciplines likely needed our inference

    • topsides/process engineering
    • project engineering/management
    • procurement/estimating
    • E&I
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. SBM Offshore signed contracts for Petrobras' FPSOs SEAP-I and SEAP-IISBM Offshore (company newsroom) · 2026-05-29
    2. Petrobras takes FID on SEAP FPSO development in Brazil basinWorld Oil · 2026-04-14
    3. Petrobras bringing $12-billion oil & gas project pair to life with SBM Offshore on FPSO duty for bothOffshore Energy · 2026
    4. SBM Offshore Half Year 2026 EarningsSBM Offshore (company newsroom / half-year report PDF) · 2026-08-06
    5. Petrobras 'dá um passo atrás' na licitação do gasoduto de SEAP para avaliar impactos do gas release, diz BaruzziABEGÁS (republishing eixos) · 2026-09-29
    6. Gas release pode atrasar projeto do gasoduto de SEAP, diz Petrobraseixos · 2026-07-30
    7. R$ 60 bilhões, duas plataformas e 32 poços: megaprojeto da Petrobras avança em Sergipe, mas gasoduto bilionário fica em esperaClick Petróleo e Gás · 2026-10-03

    Position on the globe: 11.00°S 36.30°W. Location approximate: Sergipe-Alagoas basin, offshore northeastern Brazil (off Sergipe state); exact block coordinates not published in sources checked.

    This project on its own page - facts, sources and a summary to share.

  7. 07 / 07Deepwater FPSO

    FPSO Gato do Mato (Shell) — Orca development

    Brazil

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards.

    Size120,000 b/d FPSO; first oil 2029

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: hull construction/integration …

    Who builds it

    • Shell Brasil operator
    • MODEC
    • SOFEC
    • Sumitomo Heavy Industries Marine & Engineering
    • more under “More”

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A Shell pre-salt FPSO in hull integration and topsides fabrication across Japanese and Chinese yards; delivery, installation and start-up targeted for 2029, then a 20-year MODEC O&M contract.

    Phase in full, as reported

    hull construction/integration (forward hull left Japan for China July 2026), topsides fabrication

    Who builds it as stated by the sources

    Operator / developerShell Brasil

    • Shell Brasiloperator (50%) and FPSO owner; partners Ecopetrol (30%) and KUFPEC (20%, acquired from Shell in Feb 2026, completion expected by end-2026 subject to approvals); PPSA manages the production sharing contract
    • MODECFPSO purchase and sales agreement (design of hull and all topsides facilities) plus 20-year operations and maintenance contract (March 2025); multi-yard build with Sumitomo Heavy Industries (Yokosuka, forward hull) and COSCO Qidong (aft hull, integration)
    • SOFEC (MODEC group)spread mooring system
    • Sumitomo Heavy Industries Marine & Engineeringforward hull block construction, Yokosuka (steel cut June 2025; block sailed to China July 2026)
    • COSCO Qidong Shipyardaft hull block (steel strike Oct 2025) and hull integration

    Key dates as stated by the sources

    FID
    March 2025
    Modec contracts
    2025-03-25
    Forward hull steel cut
    June 2025
    Aft hull steel strike
    October 2025
    Forward hull sailaway to china
    July 2026
    First oil target
    2029

    Disciplines likely needed our inference

    • FPSO hull and topsides engineers
    • yard construction supervision and QA/QC
    • mooring and marine engineers
    • commissioning and start-up engineers
    • FPSO operations and maintenance staff

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. MODEC Inks Purchase And Sales Agreement and Secures Operations and Maintenance Contract for Shell's Gato do Mato FPSO ProjectMODEC (company newsroom) · 2025-03-25
    2. MODEC: Pieces of Shell's Brazil-bound FPSO puzzle continue to slide into placeOffshore Energy · 2025-10-06
    3. MODEC Advances Construction of Brazil-Bound Gato do Mato FPSOBrazil Energy Insight · 2026-07-02
    4. Shell divests partial interest in Orca project offshore BrazilOffshore Magazine · 2026-02-04
    5. Forward Section of MODEC's Next Generation Hull for FPSO Gato do Mato Departs for Integration at China YardMODEC (company newsroom) · 2026-07-02

    Position on the globe: 24.80°S 43.20°W. Location approximate: Santos Basin pre-salt, ~200 km south of Rio de Janeiro, water depth ~2,000 m.

    This project on its own page - facts, sources and a summary to share.