Three projects to watch.

Large projects being built in 2026–2029, with real demand for technical professionals, spread across regions and kinds. A selection — not a ranking. Follow any of them in your Radar.

Africa · E&I, controls & HV

Showing 3 of 29 · E&I, controls & HV, in Africa. Show all

How we check

Every project is checked by hand against at least two public sources — company newsrooms, regulators, trade press. No commercial databases.

Each card shows its sources and the date we checked them (every project in this set: on or after 2026-10-08). We re-check every month; a project that finishes or is cancelled leaves the tour.

Companies appear as sourced project facts only. Reported risks are shown as reported. The discipline lists are our own inference and say so. The small dots are other projects from public datasets — context, not checked by us.

  1. 01 / 03Subsea tie-back

    Bonga North deepwater tieback

    Nigeria

    A ~US$5 bn subsea tieback.

    Size16 wells; up to 110,000 b/d through the Bonga FPSO

    1. FID
    2. Engineering (named in the reported phase)
    3. Fabrication (named in the reported phase)
    4. Construction (named in the reported phase)
    5. Installation (named in the reported phase)
    6. Commissioning

    Phase, as reported: execution — engineering, fabrication and installation of subsea infrastructure; FPSO modifications

    Who builds it

    • Shell Nigeria Exploration and Production Company operator
    • Saipem
    • TechnipFMC

    Reported risk First oil is reported around 2030; project cost cited by trade press at ~US$5 bn

    5 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A ~US$5 bn subsea tieback — 16 wells, new risers, flowlines and umbilicals, FPSO modifications — in execution from 2025 towards first oil around 2030.

    Who builds it as stated by the sources

    Operator / developerShell Nigeria Exploration and Production Company (SNEPCo)

    • Shell (SNEPCo)operator 65% of OML 118; partners Esso E&P Nigeria 20% and Nigerian Agip Exploration 15% (after TotalEnergies' exit, completed November 2025)
    • Saipemleader of consortium (with KOA Oil & Gas and AVEON Offshore) for EPCI of risers, flowlines, subsea umbilicals and associated subsea structures; ~US$1 bn total, Saipem share ~US$900 m (Dec 2024)
    • TechnipFMCSubsea 2.0 production systems — design and manufacture of subsea trees, manifolds, jumpers, controls and services; 'substantial' award (US$250–500 m), Dec 2024

    Key dates as stated by the sources

    FID
    December 2024
    Epci awards
    December 2024
    First oil target
    by end of the decade (2030 per NS Energy)

    Disciplines likely needed our inference

    • subsea/SURF engineers
    • pipeline and riser installation engineers
    • FPSO brownfield modification engineers
    • subsea controls/commissioning
    • project controls and QA/QC

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Saipem leading Bonga North subsea construction offshore NigeriaOffshore Magazine · 2024-12-19
    2. Saipem Scoops $900M for Work with Shell Off NigeriaOE Digital · 2024-12-19
    3. Bonga North Deepwater Project, NigeriaNS Energy · 2025-01-17
    4. TotalEnergies completes divestment of 12.5% Bonga field stake in Nigeria for $510 millionWorld Oil · 2025-11-25
    5. Shell ups equity in Nigeria's Bonga field as TotalEnergies divestsThe Energy Year · 2025-11-27

    Position on the globe: 4.60°N 4.70°E. Location approximate: OML 118, ~120–130 km offshore Nigeria, water depth >1,000 m; tieback to the existing Bonga FPSO.

    This project on its own page - facts, sources and a summary to share.

  2. 02 / 03Deepwater FPSO

    Kaminho FPSO (Cameia & Golfinho)

    Angola

    TotalEnergies' seventh Angolan FPSO and the first large deepwater development in the Kwanza basin.

    Size70,000 b/d FPSO; ~30 km subsea lines; first oil 2028

    1. FID
    2. Engineering
    3. Fabrication (named in the reported phase)
    4. Construction
    5. Installation
    6. Commissioning

    Phase, as reported: FPSO conversion and subsea fabrication …

    Who builds it

    • TotalEnergies operator
    • Saipem

    4 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    TotalEnergies' seventh Angolan FPSO and the first large deepwater development in the Kwanza basin; TotalEnergies expects over 10 million man-hours of work in Angola.

    Phase in full, as reported

    FPSO conversion and subsea fabrication (execution since FID May 2024)

    Who builds it as stated by the sources

    Operator / developerTotalEnergies

    • TotalEnergiesoperator 40%; partners Petronas 40%, Sonangol 20%
    • Saipemthree contracts totalling US$3.7 bn (May 2024): EPC, transportation and commissioning of the Kaminho FPSO (VLCC conversion); 12-year FPSO operation and maintenance (+8-year option); EPCI of the SURF package (~30 km of 8" and 10" flowlines and risers), fabrication at Saipem's Ambriz yard, FDS J-lay vessel for offshore campaign

    Key dates as stated by the sources

    FID
    2024-05-21
    Saipem awards
    2024-05-21
    First oil target
    2028

    Disciplines likely needed our inference

    • FPSO conversion/topsides engineers
    • SURF and riser engineers
    • commissioning and start-up engineers
    • electrical engineers (all-electric FPSO)
    • yard construction supervision

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Angola: TotalEnergies launches the Kaminho deepwater projectTotalEnergies (company newsroom) · 2024-05-21
    2. TotalEnergies launches Kaminho oil project offshore Angola, Saipem to supply, operate FPSOOffshore Magazine · 2024-05-21
    3. Saipem secures $3.7 billion contracts for TotalEnergies' Kaminho project offshore AngolaWorld Oil · 2024-05-21
    4. TotalEnergies plans $10 billion Angola investment with partners over five years, CEO says (Reuters)CNBC Africa · 2026-09-10

    Position on the globe: 9.60°S 12.40°E. Location approximate: Block 20/11, Kwanza Basin, ~100 km off the Angolan coast, 1,700 m water depth.

    This project on its own page - facts, sources and a summary to share.

  3. 03 / 03LNG

    Mozambique LNG (Golfinho/Atum, Area 1)

    Mozambique

    A $20bn+ LNG project restarting at scale after a five-year security-driven suspension.

    Size13 million tonnes/year (design)

    1. FID
    2. Engineering
    3. Fabrication
    4. Construction (named in the reported phase)
    5. Installation
    6. Commissioning

    Phase, as reported: construction …

    Who builds it

    • TotalEnergies operator
    • McDermott / Saipem / Chiyoda

    Reported risk Construction is operating in "containment mode" due to ongoing insurgency-related security concerns in Cabo Delgado…

    7 sources checked on 2026-10-08

    More why we watch it · key dates · all contractors · sources

    Why we watch it

    A $20bn+ LNG project restarting at scale after a five-year security-driven suspension — a live test of how fast a paused megaproject can remobilise thousands of workers, and a rare African entry among 2026-2029 LNG builds. TotalEnergies said in September 2026 it could speed up a Phase 2 by keeping construction teams at Afungi.

    Phase in full, as reported

    construction (almost 45% complete as of July 2026; about 10,000 people on site by late September 2026)

    Reported risk in full, as reported

    Construction is operating in "containment mode" due to ongoing insurgency-related security concerns in Cabo Delgado; incremental costs from the suspension are reported at roughly $4.5 billion, pushing total investment above the original $20 billion. Equipment built in Middle East yards was held up by the 2026 regional conflict; TotalEnergies said in July 2026 that this had been resolved.

    Who builds it as stated by the sources

    Operator / developerTotalEnergies (operator of the Mozambique LNG consortium)

    • TotalEnergiesoperator, restarted project January 2026
    • McDermott / Saipem / Chiyoda (EPC JV)onshore LNG plant EPC consortium (contract predates the 2021 force-majeure suspension; consortium composition per trade press, not re-confirmed by a primary 2026 source in this check)

    Key dates as stated by the sources

    Force majeure lifted
    7 November 2025
    Full restart announced
    29 January 2026
    First LNG target
    2029

    Disciplines likely needed our inference

    • construction management
    • piping/mechanical
    • HSE (security-sensitive site)
    • planning/project controls
    • commissioning (later phase)

    Derived by us from project kind and phase - not stated by the sources below.

    Sources checked on 2026-10-08

    1. Mozambique LNG announces the full restart of all its activities onshore and offshore in MozambiqueTotalEnergies (company press release) · 2026-01-29
    2. TotalEnergies reboots $20 billion LNG project after years-long hiatusOffshore Energy · 2026-01
    3. TotalEnergies restarts $20bn LNG project in Mozambique after 5-year freezeAl Jazeera · 2026-01-29
    4. TotalEnergies 2Q2026 Earnings Call transcriptTotalEnergies (investor relations) · 2026-07-23
    5. Strategy and Outlook 2026 presentation (slides: upstream and integrated LNG project tables)TotalEnergies (investor presentation) · 2026-09-28
    6. TotalEnergies says Mozambique LNG Phase 2 could be acceleratedClub of Mozambique · 2026-09-30
    7. Mozambique LNG project 45% complete, first train on track for 2029, says TotalEnergiesClub of Mozambique · 2026-08-03

    Position on the globe: 10.90°S 40.50°E. Location approximate: Afungi Peninsula, Cabo Delgado province.

    This project on its own page - facts, sources and a summary to share.