Project · CCS · Norway
Northern Lights CO2 transport & storage — Phase 2
The reference project for CCS-as-infrastructure in Europe — offshore pipeline, injection wells and receiving-terminal expansion all running in parallel, a template for the CO2 value chains (incl. Porthos in Rotterdam) that Dutch engineering firms are also chasing.
Checked by hand against the sources below (2026-10-20).
- Engineering (now)
- Fabrication (now)
- Transport & installation (next)
- Hook-up
- Commissioning
- Operation
Now Engineering · Fabrication (reported: engineering / fabrication (detailed engineering in full swing, fabrication underway at several yards per March 2026 reporting))
Next Transport & installation · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation 2028 (start-up from 2028, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Northern Lights JVOperator / ownerdeveloper, FID holder
- Subsea7EPC / main contractorEPCI contractor for five-kilometre CO₂ pipeline; installation of satellite structures, umbilicals, tie-ins and pre-commissioning; offshore operations…
- Aker SolutionsEPC / main contractorEPC of Phase 2 onshore facilities; work at Fornebu, Stord and Mumbai, with completion expected 2028.
- OneSubseaEPC / main contractorEPC contract for the CO2 subsea injection system
- Worley RosenbergFabrication / constructionFabrication of subsea structures and spools for Phase 2 under award from Subsea7, announced 14 October 2026.
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- CCS
- Country
- Norway
- Size
- Raises transport & storage capacity from 1.5 to more than 5 million tonnes CO2/year
- Operator
- Northern Lights JV
- Position
- 60.61°N 4.87°E, approximate
On the Radar each linked to its source
- 15 October 2026Worley awarded subsea structures contract for Northern Lights Phase 2
- 14 October 2026Worley Rosenberg awarded subsea fabrication for Northern Lights Phase 2
- 17 March 2026Northern Lights Phase 2 on track to more than triple CO2 storage capacity by 2028
- 31 March 2025Subsea7 begins EPCI work on the Northern Lights Phase 2 CO2 pipeline
Sources
- Northern Lights Phase 2: Expanding Europe's CO2 Storage CapacityNorthern Lights (project operator) · published 2025-2026 · read 2026-10-20
- Northern Lights: a CO2 transport and storage project to reduce industrial emissions in EuropeTotalEnergies · published 2026 · read 2026-09-19
- Subsea7 starts engineering for Northern Lights Phase 2 CO2 pipelineOffshore Magazine · published 2026 · read 2026-09-19
- Investing NOK 7.5 billion in expansion of the groundbreaking Northern Lights CCS-projectEquinor (company newsroom) · published 2025-03-27 · read 2026-10-08
- Delivering subsea infrastructure for flagship CCS project in NorwayWorley · published 2026-10-14 · read 2026-10-20
- Subsea7 awarded contract offshore NorwaySubsea7 · published 2025-03-31 · read 2026-10-20
- Aker Solutions awarded contract for second phase of the Northern Lights carbon storage projectAker Solutions · published 2025-04-01 · read 2026-10-20
- SLB OneSubsea secures EPC contract for Northern Lights CO2 transport and storage project expansionSLB OneSubsea · published 2025-06-25 · read 2026-10-20
- Worley awarded subsea structures contract for Northern Lights Phase 2Offshore Energy (Navingo) · published 2026-10-15 · read 2026-10-23