Radar · Award

EnerMech extends NDT and asset integrity contract with Chevron Australia to 2031

EnerMech has secured a five-year extension of its non-destructive testing and asset integrity contract with Chevron Australia, running to the end of 2031. Value was not disclosed.

Published 1 October 2026 by Offshore Energy (Navingo) · added to the Radar on 2026-10-08.

The source

Offshore Energy (Navingo)

We summarise in our own words and link the source. We do not reproduce the source's article, and we publish nothing we could not trace back to it.

Build your own radarEverything in the Radar