Company
Aker Solutions
Named on 5 projects in the sources we follow. Each role as the source states it.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Engineering & design
Atlantis tie-in
Subsea tie-back
FEED-contract
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Aker Solutions - news, 2026-05-05
Other role
Nes hydropower upgrade
Hydropower
awarded contract
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Aker Solutions - news, 2026-10-08
EPC / main contractor
Northern Lights CO2 transport & storage — Phase 2
CCS · Norway
EPC of Phase 2 onshore facilities; work at Fornebu, Stord and Mumbai, with completion expected 2028.
- Engineering (now)
- Fabrication (now)
- Transport & installation (next)
- Hook-up
- Commissioning
- Operation
Next Transport & installation, not announced
Source: Northern Lights (project operator), 2025-2026
Other role
Tussa II
Hydropower
contract for hydropower plant
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Aker Solutions - news, 2026-06-29
EPC / main contractor
Yggdrasil (Aker BP)
Offshore gas platforms · Norway
EPC and offshore hook-up for the Hugin A production platform and jacket and the Hugin B unmanned wellhead platform and jacket (contract ~NOK 22 bn, Dec 2022); plus subsea production systems (~NOK 7…
- Engineering (done)
- Fabrication (done)
- Transport & installation (now)
- Hook-up (now)
- Commissioning (next)
- Operation
Next Commissioning, not announced
Source: PortNews, 2026-07-06
Works with named on the same projects
- Subsea7 · on Northern Lights CO2 transport & storage — Phase 2, Yggdrasil (Aker BP)
- Aibel · on Yggdrasil (Aker BP)
- Aker BP · on Yggdrasil (Aker BP)
- Allseas · on Yggdrasil (Aker BP)
- Equinor · on Atlantis tie-in
- Hafslund Kraft · on Nes hydropower upgrade
- NKT · on Yggdrasil (Aker BP)
- Northern Lights JV · on Northern Lights CO2 transport & storage — Phase 2
- OneSubsea · on Northern Lights CO2 transport & storage — Phase 2
- Tussa Energi · on Tussa II
- Worley Rosenberg · on Northern Lights CO2 transport & storage — Phase 2
From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.