Project · Offshore wind · Netherlands
IJmuiden Ver Gamma-A / Gamma-B wind farm sites
Capacity is about 1 GW per site (RVO does not state a combined MW figure for the two sites together). Permit application window for Gamma-A and Gamma-B (Gamma-B added with subsidy in April 2026) now set for 26 November-10 December 2026; RVO expects to announce winners in Q1 2027 - no tender winner yet as of this…
As reported by the source below (2026-09-20).
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: tender)
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
No company named in the sources yet: not announced.
- Kind
- Offshore wind
- Country
- Netherlands
- Operator
- not announced
- Position
- 53.02°N 3.67°E, approximate
Sources
- IJmuiden Ver Gamma-A / Gamma-B wind farm sites - source pageRVO.nl / Rijksoverheid.nl (2026) · read 2026-09-20