Project · Offshore wind · Netherlands
Gemini wind farm
Fully operational since 2017; Van Oord sold its 10% stake to the German ALTE LEIPZIGER-HALLESCHE insurance group in 2018.
As reported by the source below (2026-09-19).
- Engineering (done)
- Fabrication (done)
- Transport & installation (done)
- Hook-up (done)
- Commissioning (done)
- Operation (now)
Now Operation (reported: operational)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Northland PowerOperator / owneroperator (60%)
- Kind
- Offshore wind
- Country
- Netherlands
- Size
- 600 MW
- Operator
- Northland Power
- Position
- 54.03°N 6.04°E, approximate
Sources
- Gemini wind farm - source pageOffshore Wind (Van Oord stake sale, 2018) / Energy Monitor · read 2026-09-19