Company

TenneT

Named on 7 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Operator / owner

    Doordewind 1

    Grid & HVDC · Netherlands

    operator / owner, as named in the source

    1. Engineering (next)
    2. Fabrication
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Engineering, not announced

    Source: TenneT, 2026-09-18

  2. Operator / owner

    Heerema Vlissingen - 2GW jacket fabrication

    Fabrication yard · Netherlands

    client

    1. Engineering (done)
    2. Fabrication (now)
    3. Construction (next)
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Construction, summer 2028

    Source: reNEWS / Offshore Wind (2026)

  3. Other role

    IJmuiden Ver Alpha & Beta wind farms

    Offshore wind · Netherlands

    grid connection: 2 GW offshore platform and HVDC link (realisation agreement, Feb 2025)

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: sserenewables.com, 2025-02-03

  4. Operator / owner

    LanWin 5

    Grid & HVDC · Germany

    operator / owner, as named in the source

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Evertiq, 2026-08-03

  5. Operator / owner

    Nederwiek 1

    Grid & HVDC · Netherlands

    operator / owner, as named in the source

    1. Engineering (next)
    2. Fabrication
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Engineering, not announced

    Source: TenneT, 2026-09-18

  6. Operator / owner

    Nederwiek 3

    Grid & HVDC · Netherlands

    operator / owner, as named in the source

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Evertiq, 2026-08-03

  7. Operator / owner

    TenneT 2GW offshore grid programme

    Grid & HVDC · Netherlands

    developer/grid operator, FID holder for the 14-platform programme

    1. Engineering (done)
    2. Fabrication (now)
    3. Transport & installation (now)
    4. Hook-up (next)
    5. Commissioning
    6. Operation

    Next Hook-up, H2 2028

    Source: TenneT (company newsroom), 2023-2024

Works with named on the same projects

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.