Project · Grid & HVDC · Netherlands
Nederwiek 1
Read from the Radar item below (2026-09-18); only what the source says.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation 2030 (targeted for 2030, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- TenneTOperator / owneroperator / owner, as named in the source
- Larsen & ToubroOther roleoffshore converter platforms
- Hitachi EnergyOther roleHVDC technology
- Kind
- Grid & HVDC
- Country
- Netherlands
- Operator
- TenneT
- Position
- country only
On the Radar each linked to its source
Sources
- TenneT 2GW programme: 14 offshore grid connections by about 2032TenneT · published 2026-09-18 · read 2026-10-23
- Larsen & Toubro and Hitachi Energy sign 2GW framework agreement with TenneTEvertiq · published 2026-08-03 · read 2026-10-23