Siemens Gamesa

Named on 2 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Equipment & supply

    Bałtyk 2 & Bałtyk 3 offshore wind

    Offshore wind · Poland

    turbine supplier — 100 x 14.4 MW (per offshoreWIND.biz)

    1. Engineering (done)
    2. Fabrication (done)
    3. Transport & installation (now)
    4. Hook-up
    5. Commissioning (next)
    6. Operation

    Next Commissioning, 2027

    Source: offshoreWIND.biz, 2026-09-03

  2. Equipment & supply

    Coastal Virginia Offshore Wind (CVOW)

    Offshore wind · United States

    turbine supplier — 176 x SG 14-222 DD, 14.6 MW turbines

    1. Engineering (done)
    2. Fabrication (done)
    3. Transport & installation (now)
    4. Hook-up
    5. Commissioning (now)
    6. Operation (next)

    Next Operation, not announced

    Source: Power Engineering, 2026