Radar · Award
Subsea Micropiles to handle anchor design and site surveys for Pentland floating wind
Subsea Micropiles signed an agreement to deliver site investigations and anchor engineering, including installation support, for the 100 MW Pentland floating wind farm led by Highland Wind Limited. FID is expected in 2027 and operation in 2030.
Published 6 October 2026 by offshoreWIND.biz · added to the Radar on 2026-10-08.
The source
We summarise in our own words and link the source. We do not reproduce the source's article, and we publish nothing we could not trace back to it.
What this touches
Follow any of these and this kind of item reaches you in the weekly digest. Discipline matches are our inference from each project's phase and kind - not a vacancy count and not a statement by the source.
Sectors
Read on
- 7 October 2026All turbines installed at Poland's Baltic Power wind farm
- 6 October 2026Chevron signs Lotus Area exploration deal off Egypt with two-well commitment
- 7 October 2026TechnipFMC wins Petrobras flexible pipe contract
- 6 October 2026Aramco brings in KBR for engineering on offshore Marjan field development