Radar · Milestone
First oil flows at Santos's Pikka field on Alaska's North Slope
Santos reported first oil on 18 May 2026 at the Pikka phase 1 project on Alaska's North Slope, targeting 80,000 barrels per day gross at plateau, with Santos holding 51% and Repsol 49%.
The source dates the event 18 May 2026 · added to the Radar on 2026-09-22.
The source
We summarise in our own words and link the source. We do not reproduce the source's article, and we publish nothing we could not trace back to it.
What this touches
Follow any of these and this kind of item reaches you in the weekly digest. Discipline matches are our inference from each project's phase and kind - not a vacancy count and not a statement by the source.
Read on
- 15 June 2026First turbine goes up at Ocean Winds' Dieppe-Le Treport wind farm
- 12 May 2026Santos commits to Agogo-PNG LNG pipeline tie-in project
- 2 July 2026Van Oord-Boskalis group to dredge for Lulea port expansion, Sweden
- 4 May 2026EFGL floating wind farm begins generating power in Gulf of Lion, France