Radar · Milestone
Neptun Deep in final execution, first gas targeted for first half of 2027
OMV Petrom and Romgaz have installed the Neptun Alpha platform and finished seven of ten wells at Neptun Deep in the Romanian Black Sea. First gas is targeted for H1 2027, with subsea work and pipeline tie-in still to come.
Published 29 September 2026 by Offshore Energy (Navingo) · added to the Radar on 2026-10-08.
The source
We summarise in our own words and link the source. We do not reproduce the source's article, and we publish nothing we could not trace back to it.
What this touches
Follow any of these and this kind of item reaches you in the weekly digest. Discipline matches are our inference from each project's phase and kind - not a vacancy count and not a statement by the source.
Sectors
Read on
- 29 September 2026Tekmar gets EUR 6 million cable protection extension for European offshore wind
- 29 September 2026OneSubsea wins subsea systems contract for Mozambique LNG
- 30 September 2026TDI-Brooks selected for pipeline-route surveys offshore Timor-Leste
- 29 September 2026Fluor-JGC JV wins Shell Canada LNG contract