Radar · Award
Golar acquires LNG carrier for FLNG conversion by 2029
Golar LNG acquired a 2013-built vessel from NYK Line for conversion into a floating liquefaction facility, targeted for completion by 2029.
Published 8 October 2026 by Offshore Energy (Navingo) · added to the Radar on 2026-10-14.
The source
We summarise in our own words and link the source. We do not reproduce the source's article, and we publish nothing we could not trace back to it.
What this touches
Follow any of these and this kind of item reaches you in the weekly digest. Discipline matches are our inference from each project's phase and kind - not a vacancy count and not a statement by the source.
Sectors
Read on
- 8 October 2026Seatrium wins FSRU conversion contract from Excelerate Energy
- 8 October 2026EnerMech wins pre-commissioning contract from Subsea7
- 8 October 2026World-first offshore CO2 transport and storage platform installed
- 7 October 2026Arabian Drilling wins four-year contract for four jack-ups from Khafji Joint Operations