Radar · Award

Fugro awarded East Anglia Two post-installation survey contract

Fugro secured a contract from Cadeler for post-installation seabed surveys at the 960 MW East Anglia Two offshore wind farm.

Published 4 November 2026 by Offshore Energy (Navingo) · added to the Radar on 2026-11-04.

The source

Offshore Energy (Navingo)

The summary is in our own words; the source's article is not reproduced.

What this touches

Follow any of these and this kind of item reaches you in the weekly digest. Discipline matches are our inference from each project's phase and kind - not a vacancy count and not a statement by the source.

Pick follows in the RadarEverything in the Radar