Project · Port & marine works · Canada
Roberts Bank Terminal 2
Read from the Radar item below (2026-07-15); only what the source says.
- Engineering (now)
- Fabrication (next)
- Construction
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Engineering)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Vancouver Fraser Port AuthorityOperator / owneroperator / owner, as named in the source
- TerraMarineEngineering & designpreferred contractor for Landmass and Wharf progressive design-build project
- Van OordOther rolecutter suction dredging works
- Aecon GroupOther roleconsortium member
- FlatironDragados CanadaOther roleconsortium member
- Carlson Construction GroupOther roleconsortium member
- Kind
- Port & marine works
- Country
- Canada
- Operator
- Vancouver Fraser Port Authority
- Position
- country only
On the Radar each linked to its source
Sources
- Van Oord-led group tapped for Roberts Bank Terminal 2 dredging, CanadaVan Oord · published 2026-07-15 · read 2026-10-23