Project · Subsea gas · Australia
Jansz-Io Compression (Gorgon gas supply)
A subsea-compression scheme keeping one of the world's largest LNG plants (Gorgon) supplied as its field ages — a rare, technically complex subsea-compression build with its own multi-year commissioning tail.
Checked by hand against the sources below (2026-10-20).
- Engineering (done)
- Fabrication (done)
- Transport & installation (now)
- Hook-up
- Commissioning (now)
- Operation (next)
Now Transport & installation · Commissioning (reported: installation / commissioning (Chevron's December 2024 indicative schedule runs installation from late-2024 to mid-2027; commissioning and…)
Next Operation · commissioning, start-up and operation expected to commence from 2026/2027, as reported
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Kind
- Subsea gas
- Country
- Australia
- Size
- Maintains feed-gas supply to Gorgon LNG: three trains with a combined design capacity of 15.6 million tonnes per year.
- Operator
- Chevron
- Position
- 20.75°S 115.40°E, approximate
On the Radar each linked to its source
Sources
- Chevron's Jansz-Io compression project on trackOffshore Magazine · published 2024 · read 2026-09-19
- Saipem wins contract for Chevron's Jansz-Io compression projectLNG Prime · published 2021-2022 · read 2026-09-19
- Gorgon and Jansz Feed Gas Pipeline and Wells Operations (environment plan summary)NOPSEMA (Australian offshore regulator) · read 2026-10-20
- Jansz-Io Compression Installation (information sheet, Dec 2024)Chevron Australia · published 2024-12 · read 2026-10-08
- Chevron Corporation 2023 Form 10-K (filed 26 February 2024)Chevron · published 2024-02-26 · read 2026-10-20
- Saipem: two new offshore transportation and installation contracts awarded for a total amount of over 600 million USDSaipem · published 2021-11-15 · read 2026-10-20