Project · Subsea tie-back · Cyprus
Cronos gas development — Block 6, offshore Cyprus
A new subsea gas development connecting Cyprus to existing Egyptian processing and LNG infrastructure. Contract execution creates a pipeline of subsea engineering, procurement, installation and commissioning work.
Checked by hand against the sources below (2026-10-29).
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: execution — engineering and procurement; main construction and drilling contracts signed; initial subsea deliveries expected H1 2027)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation H1 2028 (start-up expected H1 2028 (Eni, 26 October 2026), as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- EniOperator / ownerBlock 6 operator, 50% interest
- TotalEnergiesOther roleBlock 6 partner, 50% interest
- Baker HughesFabrication / constructionsubsea production systems and services: trees, wellheads, connectors, manifolds and topside controls; initial deliveries expected H1 2027
- Kind
- Subsea tie-back
- Country
- Cyprus, Egypt
- Size
- Up to 500 million standard cubic feet/day; >3 Tcf gas initially in place.
- Operator
- Eni
- Position
- 33.50°N 32.50°E, approximate
On the Radar each linked to its source
Sources
- Eni launches the execution phase of Cronos projectEni · published 2026-10-26 · read 2026-10-29
- Baker Hughes Wins Significant Subsea Production Systems and Services Award for Eni’s Cronos Gas DevelopmentBaker Hughes · published 2026-10-28 · read 2026-10-29