Baker Hughes
Named on one project in the sources we follow. Each role as the source states it.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Fabrication / construction
Cronos gas development — Block 6, offshore Cyprus
Subsea tie-back · Cyprus
subsea production systems and services: trees, wellheads, connectors, manifolds and topside controls; initial deliveries expected H1 2027
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Eni, 2026-10-26
Works with named on the same projects
- Eni · on Cronos gas development — Block 6, offshore Cyprus
- TotalEnergies · on Cronos gas development — Block 6, offshore Cyprus