Company

Baker Hughes

Named on one project in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Fabrication / construction

    Cronos gas development — Block 6, offshore Cyprus

    Subsea tie-back · Cyprus

    subsea production systems and services: trees, wellheads, connectors, manifolds and topside controls; initial deliveries expected H1 2027

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Eni, 2026-10-26

Works with named on the same projects

  • Eni · on Cronos gas development — Block 6, offshore Cyprus
  • TotalEnergies · on Cronos gas development — Block 6, offshore Cyprus

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.