Project · Pipeline · Papua New Guinea

Agogo Production Facility Tie-In Project

Read from the Radar item below (2026-05-12); only what the source says.

  1. Engineering (now)
  2. Fabrication (next)
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Engineering (reported: Engineering)

Next Fabrication · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Later Operation Q2 2028 (first gas targeted second quarter 2028, as reported)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • SantosOperator / owneroperator / owner, as named in the source
Kind
Pipeline
Country
Papua New Guinea
Operator
Santos
Position
country only

Sources

  1. Santos commits to Agogo-PNG LNG pipeline tie-in projectSantos · published 2026-05-12 · read 2026-10-23