Company

Santos

Named on 2 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Operator / owner

    Agogo Production Facility Tie-In Project

    Pipeline · Papua New Guinea

    operator / owner, as named in the source

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Santos, 2026-05-12

  2. Operator / owner

    Moomba Central Optimisation

    Oil & gas, onshore · Australia

    operator / owner, as named in the source

    1. Engineering (next)
    2. Fabrication
    3. Construction
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Engineering, not announced

    Source: Santos, 2026-03-09

Works with named on the same projects

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.