Company
Santos
Named on 2 projects in the sources we follow. Each role as the source states it.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Operator / owner
Agogo Production Facility Tie-In Project
Pipeline · Papua New Guinea
operator / owner, as named in the source
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Next Fabrication, not announced
Source: Santos, 2026-05-12
Operator / owner
Moomba Central Optimisation
Oil & gas, onshore · Australia
operator / owner, as named in the source
- Engineering (next)
- Fabrication
- Construction
- Hook-up
- Commissioning
- Operation
Next Engineering, not announced
Source: Santos, 2026-03-09
Works with named on the same projects
- Beach Energy · on Moomba Central Optimisation
From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.