Company

ESB Group

Named on 3 projects in the sources we follow. Each role as the source states it.

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

  1. Operator / owner

    Inch Cape offshore wind farm

    Offshore wind · United Kingdom

    owner (Global Wind Power Tracker)

    1. Engineering (done)
    2. Fabrication (done)
    3. Transport & installation (now)
    4. Hook-up (next)
    5. Commissioning
    6. Operation

    Next Hook-up, not announced

    Source: gem.wiki, 2026-02-05

  2. Operator / owner

    Loch Garman offshore wind farm

    Offshore wind · Ireland

    owner, 50% (Global Wind Power Tracker)

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0), 2026-02-05

  3. Operator / owner

    Sea Stacks offshore wind farm

    Offshore wind · Ireland

    owner, 50% (Global Wind Power Tracker)

    1. Engineering (now)
    2. Fabrication (next)
    3. Transport & installation
    4. Hook-up
    5. Commissioning
    6. Operation

    Next Fabrication, not announced

    Source: Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0), 2026-02-05

Works with named on the same projects

  • Ørsted · on Loch Garman offshore wind farm, Sea Stacks offshore wind farm
  • ICOL · on Inch Cape offshore wind farm
  • Red Rock Power · on Inch Cape offshore wind farm

From the project database: hand-checked projects and Radar awards, each with its source. A company is listed where a source names it; this is not a client list.