NedZero estimates that building the additional planned Dutch offshore wind capacity will require around 62,000 labour-years between 2023 and 2030 1. That demand is spread across design, construction, installation, maintenance and logistics work, with a significant share carried by Dutch ports and maritime companies 1. NedZero also projects a further roughly 163,000 labour-years between 2030 and 2050 as the fleet expands toward longer-term North Sea targets 1.
Not in the sources: The passage does not break the 62,000 labour-years down by year, project or job type.
Cited passages
Passage 1: 62,000 labour-years to 2030
NedZero, the Dutch wind-energy sector association, estimates that building the additional offshore wind capacity planned for the Netherlands will require around 62,000 labour-years between 2023 and 2030, spread across a broad chain of design, construction, installation, maintenance and logistics work, with a significant share carried by Dutch ports and maritime companies. NedZero projects a further roughly 163,000 labour-years of demand between 2030 and 2050 as the fleet keeps expanding toward the longer-term North Sea targets.
NedZero: labour-year demand for Dutch offshore wind build-outNedZero (Dutch wind energy sector association) · nedzero.nl · retrieved 18 Sep 2026
Sources consulted
- NedZero: labour-year demand for Dutch offshore wind build-outNedZero (Dutch wind energy sector association) · nedzero.nl · retrieved 18 Sep 2026 · cited
General information from public sources, not legal advice. Passages are our own-words summaries of the linked publications; follow the link for the authoritative text.