Project · Offshore wind · Denmark

VindØ Energy Island offshore wind farm

Denmark, North Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2033.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • Andel AMBAOperator / ownerowner (Global Wind Power Tracker)
  • Pension DanmarkOperator / ownerowner (Global Wind Power Tracker)
  • PFA HoldingOperator / ownerowner (Global Wind Power Tracker)
  • ShellOperator / ownerowner (Global Wind Power Tracker)
Kind
Offshore wind
Country
Denmark
Size
10000 MW
Operator
Andel AMBA
Position
55.88°N 6.53°E, approximate

Sources

  1. VindØ Energy Island - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24