Project · District heating · Denmark

Vestforbrænding Heat Plan 2030 — Stage 2

Defined second-stage district-heating rollout under Heat Plan 2030. Six design-and-build contracts cover heat networks and customer connections in the named municipalities; this is a geographically defined programme, not general network maintenance.

Checked by hand against the sources below (2026-11-08).

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Contract awarded; current physical progress not confirmed by the sources checked.)

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • M.J. ErikssonEngineering & designawarded design-and-build contractor
  • Per AarsleffEngineering & designawarded design-and-build contractor

Contract awards public notices that name this project

Kind
District heating
Country
Denmark
Operator
Vestforbrænding
Position
country only