Project · Oil & gas, offshore · Norway
Troll templates (R, T3, V1, V2, W3)
New facilities on the Troll field, as Sodir lists them.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (done)
- Fabrication (done)
- Transport & installation (now)
- Hook-up (next)
- Commissioning
- Operation
Now Transport & installation (reported: Sodir facility phase: Troll R future, Troll T3 future, Troll V1 future, Troll V2 future, Troll W3 installation (updated 29 Apr 2026))
Next Hook-up · not announced
Roles Construction & supervision · Commissioning & start-up · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- EquinorOperator / owneroperator (Sodir)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Oil & gas, offshore
- Country
- Norway
- Operator
- Equinor
- Position
- 60.86°N 3.71°E, as published
Sources
- Facility Troll R - FUTURESodir FactPages · published 2026-02-20 · read 2026-10-24
- Facility Troll T3 - FUTURESodir FactPages · published 2026-04-29 · read 2026-10-24
- Facility Troll V1 - FUTURESodir FactPages · published 2026-04-29 · read 2026-10-24
- Facility Troll V2 - FUTURESodir FactPages · published 2026-04-29 · read 2026-10-24