Project · Power plant · Czechia
Trmice combined-cycle heat and power plant
New gas-fired heat and power plant replacing coal-based generation. Metrostav DIZ is the main contractor; NEM Energy reports its package for two steam generators.
Checked by hand against the sources below (2026-11-08).
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: Design, procurement and equipment delivery packages awarded; current site progress not independently confirmed.)
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- ČEZ TeplárenskáOperator / ownerowner / client
- Metrostav DIZEngineering & designdesign, construction and plant delivery contractor
- NEM EnergyEngineering & designtwo once-through steam generators: engineering, procurement and delivery
Contract awards public notices that name this project
UL_PPC 100 MWt (150 MWe), Trmice
Cogeneration plant construction work
- Winner
- Metrostav DIZ a.s.
- Buyer
- ČEZ Teplárenská, a.s.
- Value
- €412,262,535
Work type, our reading Construction & supervision
- Kind
- Power plant
- Country
- Czechia
- Size
- 150 MWe / 100 MWt
- Operator
- ČEZ Teplárenská
- Position
- country only
Sources
- Official award notice 440924-2026TED, Tenders Electronic Daily (EU) · published 2026-06-26 · read 2026-11-08
- Trmice steam generator packageNEM Energy · published 2026-08-06 · read 2026-11-08