Project · Oil & gas, offshore · Norway
Statfjord
Read from the Radar item below (2026-10-09); only what the source says.
- Engineering (done)
- Fabrication (done)
- Transport & installation (done)
- Hook-up (done)
- Commissioning (done)
- Operation (now)
Now Operation (reported: operation: Weatherford completions work for Equinor on Statfjord (9 October 2026); the Statfjord A topside is being removed by Allseas in…)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- EquinorOperator / owneroperator / owner, as named in the source
- Weatherford InternationalOther roleprimary completion-systems provider
- AllseasTransport & installationremoval of the 60,000-ton Statfjord A topside in a single lift with its vessel Pioneering Spirit (decommissioning)
- ABLOther rolemarine warranty surveyor
- Kind
- Oil & gas, offshore
- Country
- Norway
- Operator
- Equinor
- Position
- country only
On the Radar each linked to its source
Sources
- Weatherford extends Equinor work and wins North Sea completions scopeOffshore Energy (Navingo) · published 2026-10-09 · read 2026-10-23
- ABL to act as warranty surveyor for Allseas' Statfjord A topside single liftOffshore Energy (Navingo) · published 2026-09-23 · read 2026-10-23