Project · Oil & gas, offshore · Norway

Statfjord

Read from the Radar item below (2026-10-09); only what the source says.

  1. Engineering (done)
  2. Fabrication (done)
  3. Transport & installation (done)
  4. Hook-up (done)
  5. Commissioning (done)
  6. Operation (now)

Now Operation (reported: operation: Weatherford completions work for Equinor on Statfjord (9 October 2026); the Statfjord A topside is being removed by Allseas in…)

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • EquinorOperator / owneroperator / owner, as named in the source
  • Weatherford InternationalOther roleprimary completion-systems provider
  • AllseasTransport & installationremoval of the 60,000-ton Statfjord A topside in a single lift with its vessel Pioneering Spirit (decommissioning)
  • ABLOther rolemarine warranty surveyor
Kind
Oil & gas, offshore
Country
Norway
Operator
Equinor
Position
country only

Sources

  1. Weatherford extends Equinor work and wins North Sea completions scopeOffshore Energy (Navingo) · published 2026-10-09 · read 2026-10-23
  2. ABL to act as warranty surveyor for Allseas' Statfjord A topside single liftOffshore Energy (Navingo) · published 2026-09-23 · read 2026-10-23