Project · Offshore wind · Estonia
Saare 1 offshore wind farm
Estonia, Baltic Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2033.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Oxan EnergyOperator / ownerowner (Global Wind Power Tracker)
- Kind
- Offshore wind
- Country
- Estonia
- Size
- 900 MW
- Operator
- Oxan Energy
- Position
- 58.24°N 20.60°E, approximate
Sources
- Saare 1 - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24