Project · Oil & gas, offshore · United Kingdom
Rosebank field development
oil field on the UK Continental Shelf.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (done)
- Fabrication (done)
- Transport & installation (now)
- Hook-up (next)
- Commissioning
- Operation
Now Transport & installation (reported: Construction work announced to mariners: 1 notice, 18 Jul 2026 to 31 Dec 2027. NSTA field status: construction, field development plan…)
Next Hook-up · not announced
Roles Construction & supervision · Commissioning & start-up · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- AduraOperator / ownerlicence operator, P1191 (NSTA); licensee, 80% equity (NSTA)
- Ithaca SP E&POther rolelicensee, 20% equity (NSTA)
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Oil & gas, offshore
- Country
- United Kingdom
- Operator
- Adura
- Position
- 61.04°N 3.76°W, approximate
Sources
- Field Rosebank - CONSTRUCTION-FDP APPROVNSTA - Offshore hydrocarbon fields (WGS84) · published 2026-10-23 · read 2026-10-24
- Notice KF-6137: Rosebank Field Drilling Operations (18 Jul 2026 to 31 Dec 2027)Kingfisher Information Service · published 2026-07-10