Project · Offshore wind · United Kingdom
Outer Dowsing offshore wind farm
United Kingdom, North Sea.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Consented per The Crown Estate)
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Gulf Energy DevelopmentOperator / ownerowner (Global Wind Power Tracker)
- Corio GenerationOperator / ownerowner (Global Wind Power Tracker)
- TotalEnergiesOperator / ownerowner (Global Wind Power Tracker)
- Wood ThilstedEngineering & designdetailed design of up to 100 monopile foundations
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Offshore wind
- Country
- United Kingdom
- Size
- 1500 MW
- Operator
- Gulf Energy Development
- Position
- 53.57°N 1.28°E, approximate
On the Radar each linked to its source
Sources
- R4 Project 3 (Outer Dowsing) - ConsentedThe Crown Estate - Wind Site Agreements (England, Wales & NI) · published 2026-09-29 · read 2026-10-24
- Outer Dowsing - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24
- Wood Thilsted awarded design contract for Outer Dowsing monopilesoffshoreWIND.biz · published 2026-10-19 · read 2026-10-23