Project · Hydropower · Czechia

Orlík hydropower TG1–TG4 modernisation

Modernisation of four turbine-generator units, including mechanical equipment, auxiliary systems, electrical equipment, controls, protection, testing and commissioning. The official notice names the Orlík site and the Litostroj consortium.

Checked by hand against the sources below (2026-11-08).

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Contract awarded; current physical progress not confirmed by the sources checked.)

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • ČEZOperator / ownerowner / client

Contract awards public notices that name this project

Kind
Hydropower
Country
Czechia
Operator
ČEZ
Position
country only

Sources

  1. Official award notice 867014-2025TED / Publications Office of the European Union · published 2025-12-30 · read 2026-11-08