Project · Water infrastructure · France

Oisy-le-Verger lock — Canal Seine-Nord Europe

Large navigation lock for the Seine-Nord Europe canal. Spie Batignolles Génie Civil leads the construction group with BESIX and NGE. The owner reported preparatory earthworks in August 2026.

Checked by hand against the sources below (2026-11-08).

  1. Engineering (next)
  2. Fabrication
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Before engineering (reported: Preparatory earthworks reported in August 2026. Main-lock start dates differ between May and August owner updates; current main…)

Next Engineering · not announced

Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • Spie Batignolles Génie CivilFabrication / constructionconstruction consortium leader
  • BESIXFabrication / constructionconstruction consortium member
  • NGEFabrication / constructionconstruction consortium member

Contract awards public notices that name this project

Kind
Water infrastructure
Country
France
Operator
Société du Canal Seine-Nord Europe
Position
country only

Sources

  1. Official award notice 360907-2026TED, Tenders Electronic Daily (EU) · published 2026-05-27 · read 2026-11-08
  2. Oisy-le-Verger lock construction awardSociété du Canal Seine-Nord Europe · published 2026-05-12 · read 2026-11-08
  3. Oisy-le-Verger earthworks updateSociété du Canal Seine-Nord Europe · published 2026-08-10 · read 2026-11-08