Project · Water infrastructure · France
Oisy-le-Verger lock — Canal Seine-Nord Europe
Large navigation lock for the Seine-Nord Europe canal. Spie Batignolles Génie Civil leads the construction group with BESIX and NGE. The owner reported preparatory earthworks in August 2026.
Checked by hand against the sources below (2026-11-08).
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: Preparatory earthworks reported in August 2026. Main-lock start dates differ between May and August owner updates; current main…)
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- Société du Canal Seine-Nord EuropeOperator / ownerowner / client
- Spie Batignolles Génie CivilFabrication / constructionconstruction consortium leader
- BESIXFabrication / constructionconstruction consortium member
- NGEFabrication / constructionconstruction consortium member
Contract awards public notices that name this project
The contract covers all works and associated services necessary for the construction of the Oisy-le-Verger lock for the Seine-Nord Europe canal construction project (CSNE) - contract M514 machine translation
Original title: Le marché porte sur l'ensemble des travaux et des prestations associées nécessaires à la réalisation de l'écluse d'Oisy-le-Verger pour le projet de construction du canal Seine-Nord Europe (CSNE) - marché M514
- Buyer
- Société du Canal Seine-Nord Europe
- Value
- €314,872,032
Work type, our reading Construction & supervision
- Kind
- Water infrastructure
- Country
- France
- Operator
- Société du Canal Seine-Nord Europe
- Position
- country only
Sources
- Official award notice 360907-2026TED, Tenders Electronic Daily (EU) · published 2026-05-27 · read 2026-11-08
- Oisy-le-Verger lock construction awardSociété du Canal Seine-Nord Europe · published 2026-05-12 · read 2026-11-08
- Oisy-le-Verger earthworks updateSociété du Canal Seine-Nord Europe · published 2026-08-10 · read 2026-11-08