Project · LNG · Qatar
North Field West LNG
Two more LNG trains of 8 MTPA for QatarEnergy, a copy of North Field South, with carbon capture.
Checked by hand against the sources below (2026-10-23).
- Engineering (now)
- Fabrication (next)
- Construction
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: engineering (EPCC awarded 25 February 2026))
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- QatarEnergyOperator / owneroperator / client
- Technip EnergiesEPC / main contractorEPCC contractor, leader of the joint venture with CCC and GAC (awarded 25 February 2026, 'major': above EUR 1 billion)
- CCCEPC / main contractorEPCC joint-venture partner
- GACEPC / main contractorEPCC joint-venture partner
- Kind
- LNG
- Country
- Qatar
- Size
- 2 trains of 8 MTPA (16 MTPA), plus 1.1 MTPA CO2 capture
- Operator
- QatarEnergy
- Position
- country only