Sites N-3.5 (previously Nordsee 3) and N-3.6 (previously Delta Nordsee 1&2), about 50 km north of the island of Juist; commercial operation scheduled for early 2029.
Checked by hand against the sources below (2026-10-24).
- Engineering (done)
- Fabrication (now)
- Transport & installation (next)
- Hook-up
- Commissioning
- Operation
Now Fabrication (reported: Production of some components has begun; foundation installation from 2027, 60 turbines in 2028 (RWE, 22 Jul 2026))
Next Transport & installation · 2027 (foundation installation set to start in 2027, as reported)
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Role groups per phase: our planning assumption from the Crew Forecast model.
Later Operation 2029 (commercial operation scheduled for early 2029, as reported)
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- RWEOperator / owneroperator and owner, 51% (builds and operates)
- Norges Bank Investment ManagementOperator / ownerowner, 49%
Who else needs construction people in Northwest Europe
May 2027 is busier than usual here: 56 projects and stops in this phase, against a typical 25.5 a month.
How we count
Counted from the project database (sources on each project page) and planned power-station stops (Nord Pool UMM, Elexon, Elia). Announced: the phase falls in the month by announced dates, or a stop's own dates. Typical: only the start is known, so the project counts for at most the typical length of that phase for its type (Crew Forecast model). Operation is not counted. Role groups per phase are our planning assumption. Counts, not people.
- Kind
- Offshore wind
- Country
- Germany
- Size
- 900 MW
- Operator
- RWE
- Position
- 54.03°N 6.83°E, approximate
Sources
- First electricity fed into grid from Nordseecluster A offshore wind farm off German coastRWE · published 2026-07-22 · read 2026-10-24
- Auction success for RWE: 1.6 gigawatts of offshore wind secured in the German North SeaRWE · published 2023-08-10 · read 2026-10-24
- EMODnet Human Activities - Wind Farms (polygons N-3.5 to N-3.8)EMODnet · published 2026-10-23 · read 2026-10-24