Project · Offshore wind · Netherlands
Nederwiek wind farm zone
The Nederwiek I-A wind farm tender (1GW, unsubsidised) closed 30 October 2025 with zero bids. No re-tender of Nederwiek I-A has taken place: the subsidised 2 GW round the government prepared for 2026 (EUR 948.3m was allocated from the Climate Fund for 2026 offshore wind tenders generally, per the 16 September 2025…
As reported by the source below (2026-09-20).
- Engineering (next)
- Fabrication
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Before engineering (reported: planned)
Next Engineering · not announced
Roles Project management & controls · Engineering & design · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
No company named in the sources yet: not announced.
- Kind
- Offshore wind
- Country
- Netherlands
- Operator
- not announced
- Position
- 54.54°N 4.49°E, approximate
Sources
- Nederwiek wind farm zone - source pageRVO.nl (Development Framework, Jan 2026) / Rijksoverheid.nl Offshore Wind Energy Action Plan (Sept 2025) · read 2026-09-20
- Nederwiek I - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24
- Nederwiek II - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24
- Nederwiek III - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24