Mooir Vannin offshore wind farm

Isle of Man, Irish Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2031.

From the public registers below, read 2026-10-24; only what they say.

  1. Engineering (now)
  2. Fabrication (next)
  3. Transport & installation
  4. Hook-up
  5. Commissioning
  6. Operation

Now Engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))

Next Fabrication · not announced

Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.

Need people for this?Follow

Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →

Who works on it as the sources name them

  • ØrstedOperator / ownerowner (Global Wind Power Tracker)
Kind
Offshore wind
Country
Isle of Man
Size
1400 MW
Operator
Ørsted
Position
54.23°N 4.06°W, approximate

Sources

  1. Mooir Vannin - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24