Project · Offshore wind · Isle of Man
Mooir Vannin offshore wind farm
Isle of Man, Irish Sea. Planned start of operation (Global Wind Power Tracker, page of 2026-02-05): 2031.
From the public registers below, read 2026-10-24; only what they say.
- Engineering (now)
- Fabrication (next)
- Transport & installation
- Hook-up
- Commissioning
- Operation
Now Engineering (reported: Pre-construction per the Global Wind Power Tracker (page of 2026-02-05))
Next Fabrication · not announced
Roles Project management & controls · Construction & supervision · QA/QC & HSE · Document control & support · Role groups per phase: our planning assumption from the Crew Forecast model.
Their rate stays; our fee goes on top: 20% → 15% → 12%. Open book →
Who works on it as the sources name them
- ØrstedOperator / ownerowner (Global Wind Power Tracker)
- Kind
- Offshore wind
- Country
- Isle of Man
- Size
- 1400 MW
- Operator
- Ørsted
- Position
- 54.23°N 4.06°W, approximate
Sources
- Mooir Vannin - pre-construction (page of 2026-02-05)Global Wind Power Tracker, Global Energy Monitor (CC BY 4.0) · published 2026-02-05 · read 2026-10-24